				SDG&E filed an application for a Permit to Construct the TL 6931 
				Fire Hardening / Wind Interconnect Project with the CPUC. The 
				CPUC is the CEQA lead agency for this project. The project 
				proposes to fire harden 5.2 miles of the existing 69 kilovolt 
				(kV) wood pole power line (TL 6931) as well as provide a new 138 
				kV generation interconnection circuit to Boulevard East 
				Substation. The project is needed to fire harden existing 
				facilities in a high fire risk area of eastern San Diego County. 
				As proposed by SDG&E, the project would fire harden the existing 
				system by replacing the existing 69 kV wood pole structures with 
				steel poles that include 138 kV class insulators and vertical 
				spacing. The proposed project would also provide the 
				interconnection facilities for the Shu’luuk Wind Project 
				proposed on the Campo Indian Reservation, if approved. If not 
				approved, this project would allow a vacant position for the 
				addition of a second circuit when needed in the future. The 
				environmental review for the Shu’luuk Wind Project is in process 
				and is being conducted by the Bureau of Indian Affairs (see 
				related links).
				
				
				
				The proposed project is located south of I-8 and Old Highway 80 
				and traverses the Live Oak Springs and the Boulevard community 
				areas in southeast San Diego County, California, approximately 
				10 miles north of the United States-Mexico border, 15 miles west 
				of the Imperial County border, and 50 miles east of downtown San 
				Diego. The location of 
				the proposed project is shown in the 
				Project Location Map.
				
				
				
				Application and Proponents Environmental Assessment
				
				
				
				SDG&E's application and proponent's environmental assessment 
				(PEA) for the TL 6931 Fire Hardening / Wind Interconnect Project 
				was submitted December 13, 2012, and is available online in the 
				following links:
				
				
				
				
				
				
				As needed during the environmental review process, the 
				Environmental Review Team will provide SDG&E with data requests 
				for specific information during preparation of the CEQA 
				document. These requests and SDG&E’s responses are published 
				here, when available:
				
				
Other Documents Available
				
				
				
				The CEQA documentation prepared for the project will be 
				published here, when available. 
				
				
				
				
				Environmental Impact Report (EIR)
				
				
				
				
				Draft EIR
				
				
				
				
				The Draft Environmental Impact Report (Draft EIR) will be 
				published here, when available.
				
				
				
				
				Final EIR
				
				
				
				
				The Final Environmental Impact Report (Final EIR) will be 
				published here, when available.
				
				
				
				
				Commission Decision
 
				
				The Commission’s Decision on the project will be published here, 
				when available.
				
				
				
				
				Construction Progress and Mitigation Monitoring
				
				
				
				
				Reports issued by the CPUC, reports on construction progress, 
				and reports issued as part of the Mitigation Monitoring Program 
				will be published here, when available.
				
				
				
				For Additional Information
				
				
				
				
				The CPUC, through its Environmental Review Team, is conducting 
				an environmental review of the project. To request additional 
				information or to be added to the mailing list, please contact 
				us by email or phone, as follows:
				
				
				
				
Project email: TL6931_WindInterconnect@dudek.com
				
				Project voicemail: 866.467.4760
				
				Project fax: 866.467.4765
				
				
				
				The CPUC’s Project Manager is:
				
				
				Amy Baker
				
				California Public Utilities Commission
				
				505 Van Ness Avenue
				
				San Francisco, CA 94102
				
				Tel. (415) 703-1691
				
				Fax (415) 703-2200
				
				
				
				
Please 
				report any problems to the
				Energy 
				Division web coordinator.
				
				
				
				
				San Diego Gas & Electric TL 6931 
				
				
				Fire Hardening / Wind Interconnect Project
				(Application No. A.12-12-007)