             Welcome to the California Public Utilities Commission (CPUC) website 
              for the California Environmental Quality Act (CEQA) review of the 
              proposed Sunrise Powerlink Transmission Line Project. Applications 
              for this project were submitted to the CPUC on December 14, 
              2005 (A.05-12-014) and August 4, 2006 (A.06-08-010). This site 
              provides access to public documents and information relevant to 
              the CEQA and National Environmental Policy Act (NEPA) review processes. 
             Background 
            SDG&E has filed an application with the CPUC to construct the 
              Sunrise Powerlink Project (SRPL). The CPUC is the CEQA lead agency 
              and the U.S. Bureau of Land Management (BLM) is the lead agency 
              under NEPA. This project was approved by the California Independent 
              System Operator on August 3, 2006. The Proponent's Environmental 
              Assessment was filed with the CPUC on August 4, 2006 and is 
              available on SDG&E's 
              project website. 
            The CPUC maintains other web pages for documents related to its 
              proceeding on the SRPL, where it makes available documents filed 
              by parties to that proceeding. The two web pages for Applications 
              A.06-0-8010 
              and A.05-12-014 
              list documents and rulings filed in the proceedings. The CPUC also 
              maintains a page of general 
              information on the SRPL project. 
            The SRPL Project, as proposed by SDG&E, includes a new, approximately 
              90-mile, 500 kV line from Imperial Valley Substation (in Imperial 
              County, near the City of El Centro) to a new Central East Substation 
              (in central San Diego County, south of the intersection of County 
              Highways S22 and S2). The 500 kV portion 
              would approximately follow the eastern boundary of BLM lands west 
              of El Centro and SR 78, and would pass through Anza-Borrego 
              Desert State Park. 
            The SRPL Project also proposes approximately 60 miles of 230 kV transmission 
            lines from the new Central East Substation to SDG&E's existing 
            Peñasquitos Substation (in the City of San Diego). SDG&E 
            proposes to construct two segments underground (one segment south 
            of Ramona and another in the community of Ranchos Peñasquitos, 
            San Diego). Figure 1 shows 
            an overview of the proposed project route. 
            Second Round of Scoping 
              on Alternatives 
            The CPUC and BLM held public meetings from February 5 through February 9, 
              2007 in order to hear input on alternatives to the Sunrise Powerlink 
              Project. February 24 was the end of the comment period, and 
              a second Scoping Report is now being prepared. 
            September/October 2006 Scoping 
            On August 31, 2006, the BLM published its Notice 
              of Intent to prepare an Environmental Impact Statement in the 
              Federal Register (Volume 71, No. 169, page 51848). On 
              September 15, 2006, the CPUC issued a Notice 
              of Preparation/Notice of Public Scoping Meetings for an Environmental 
              Impact Report/Environmental Impact Statement. In early October 2006, 
              the CPUC and BLM held a series of seven public scoping meetings 
              in Imperial and San Diego Counties to take public comment on the 
              scope and content of the environmental document. The scoping comment 
              period ended on October 20, 2006. 
            A Scoping Report (Part 1) was 
              prepared and was sent to all repositories on November 29, 
              2006; see the list of available documents below. The Scoping Report 
              includes a copy of every letter submitted, as well as transcripts 
              of the public scoping meetings and summaries of issues raised during 
              scoping. 
            A second Scoping Report is now being prepared, summarizing all 
              comments received (including oral comments made at the Public Meetings 
              on Alternatives). When completed in late March 2007, this report 
              will be posted on this website and copies will be placed in local 
              document repository sites. 
            Documents Available 
            The following documents are available 
              at 28 libraries and offices in the 
              project area. 
              SDG&E's 
              Application and Proponent's Environmental Assessment (August 4, 
              2006). 
              Notice of Intent 
              (August 31, 2006) 
              Notice of Preparation 
              (NOP) (September 15, 2006) 
             
               
                Figure 1. 
                  Proposed Project Overview 
                  Figure 2. Imperial Valley 
                  Link 
                  Figure 3. Anza-Borrego Link 
                  Figure 4A. Central Link 
                  Figure 4B. Proposed Central 
                  East Substation 
                  Figure 5A. Inland Valley 
                  Link 
                  Figure 5B. Detail of Ramona 
                  Area 
                  Figure 6A. Coastal Link 
                  Figure 6B. Rancho Peñasquitos 
                  Detail 
                  Figure 7. SDG&E Alternatives 
                  Fully Evaluated and Carried Forward in PEA 
                  Figure 8. SDG&E Alternatives 
                  Considered and Eliminated 
               
             
              Scoping Report, Part 1 
              (November 29, 2006)  
              Notice of Second 
              Round of Scoping Meetings on Alternatives to the Proposed Sunrise 
              Powerlink Project 
             
               
                Figure 1. 
                  Sunrise Powerlink Project Overview 
                  Figure 2. Imperial Valley 
                  Link Alternatives 
                  Figure 3. Anza-Borrego Link 
                  Alternatives  
                  Figure 4. Central Link Alternatives 
                  Figure 5. Inland Valley Link 
                  Alternatives 
                  Figure 6. Coastal Link Alternatives 
                  Retained 
                  Figure 7. Coastal Link Alternatives 
                  Eliminated 
                  Figure 8. Southwest Powerlink 
                  Alternatives 
                  Figure 9. Non-Wires Alternatives 
                  Figure 10. System Alternatives 
                   
               
             
            Data Requests 
            The EIR/EIS Team will submit Data Requests to SDG&E when it 
              needs specific information to support EIR/EIS preparation. These 
              requests will be made available here at the time they are issued. 
              Data requests submitted to SDG&E to date are provided below. 
              Responses to these data requests can be found at SDG&E's 
              website. 
             
              Data Request No. 1 (September 
                27, 2006) 
                Data Request No. 2 (November 15, 
                2006)  
                Data Request No. 3 (November 21, 
                2006) 
                Data Request No. 4 (December 6, 
                2006) 
                Data Request No. 5 (January 8, 
                2007) 
                Data Request No. 6 (January 26, 
                2007) 
                Data Request No. 7 (February 1, 
                2007)  
             
            For Additional Information 
            To request additional information or to be added to the mailing 
              list, please contact us by email, fax, or phone, as follows: 
            
            The CPUC's Project Manager is: 
            Billie Blanchard, CPUC Project Manager 
              California Public Utilities Commission 
              505 Van Ness Avenue 
              San Francisco CA 94102 
              Tel. (415) 703-2068 
              Fax (415) 703-2200 
              Email:  bcb@cpuc.ca.gov 
           |