Previous Code

Previous Section

Main Page

Original GO 95 Startup Page

Current GO 95 Startup Page

Change List for this Section

Search Original GO 95

Next Code

 

 

Original General Order 95 

 

Appendix G

 

Typical Illustrative Diagrams of Rules

 

1

Conflicting Lines

2

Co-linear Lines (Overbuilds)

3

Co-linear Lines

4

Sag—Normal or Apparent

5

Sag—Apparent

6

Clearance of Wires above Ground, Etc

7

Clearance of Wires at Point of Crossing

8

Vertical Separation of Wires on Different Crossarms

9

Vertical Separation--Racks and Cables

10

Conductor Separation--Line and Buck Arms

11

Conductor Separation--Combination Line and Buck Arms

12

Conductor Pin Spacing and Pole Clearance

13

Horizontal Dead Ends 0-7500 V

14

Horizontal Dead En8s More Than 7500 V

15

Climbing Space--Vertical Dead Ends

16

Climbing Space--Line Arms Only

17-18-19

Climbing Space--Line and Buck Arms 0-750 V

20-21-22

Climbing Space--Line and Buck Arms 750-20,000 V

23-24-25

Climbing Space--Combination Arms 0-750 V Quadrant

26-27-28

Climbing Space--Combination Arms 750-7500 V Quadrant

29-30-31

Climbing Space--Combination Arms 2 feet spacing

32

Climbing Space--Low Voltage Racks

33

Low Voltage Rack Under Transformer

34

Climbing Space--Communication Line Arms

35-36-37

Climbing Space--Communication Line and Buck Arms

38

Climbing Space--Communication Not on Crossarms

39

Climbing Space--Communication Service Drops

40

Supply Service Drops on Clearance Arms

41

Supply Service Drops on Pole Top Extensions

42

Supply Service Drop Clearance from Cables

43

Supply Service Drops From Guarded Racks

44

Exposed Communication Guys

45

Guys in Proximity

46

Guy Sectionalizing--Supply Lines

47

Guy Sectionalizing--Communication Lines

48

Guy Sectionalizing-Joint Poles

49

Guy Sectionalizing--Anchor Guys

50

Guy Sectionalizing--Arm and Branch Guys

51

Guy Sectionalizing--Sidewalk and Truss Guys

52

Guys Exposed to Supply of More Than 20,000 Volts

53-54

Location of Supply Cables

55

Traffic Signal Installations

56

Street Light Installations

57-58-59

Grounding of Transformer Windings

60

Rack Conductor Clearances from Pole

61

Risers Covering and Terminal Clearance

62

Trolley Spans of 100 Feet or Less

63

Trolley Spans Exceeding 100 Feet

64

Trolley Lines Under Bridges

65

Broken Trolley Suspensions

66

Broken Trolley Fastening

67

Feeder Span Wire Insulation

68-69

Span Wire Insulation

70-71

Feeder Span Wire Insulation

72-73

Backbone Insulation

74-75-76-77-78-79-80

Trolley Bracket Insulation

81

Hardwood Ground Moulding

82

Pipe or Cable Covering

83

Clearance of Wires and Equipment

84

Pole Clearance--Communication Wires

85

Guying Terms

86

Quadrant or Side of Pole for Uncovered Runs or Risers