Original
General Order
95
Section VII
Detailed Construction Requirements for Trolley
and Electric Railway
Contact and Feeder Conductors and Their Supporting
Messengers,
Span
Wires, Etc. (Class T Circuits)
79.1 Territory
A. Cities, Towns, ETC
Third rail construction or reconstruction shall not be permitted in or through cities, towns or urban territory, except for local rapid transit lines principally located in subways or on elevated structures.
B. Along Fenced Right-of-Way
Third rail construction or reconstruction shall not be permitted unless the rights of way, easement or other property upon which same is located is entirely fenced. At every opening in such fence cattle guards or suitable fence gates must be used and a sign installed near such opening as provided in Rule 79.4.