Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3680E
Advice Letter Filed02-JUN-10
Suspension Begin Date02-JUL-10
Suspension End Date29-OCT-10
Projected Date of Disposition26-FEB-11
GroundsSection 455 Hearing is required-A Commission resolution is required to address the advice letter.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2576E
Advice Letter Filed22-APR-11
Suspension Begin Date20-SEP-11
Suspension End Date19-MAR-12
Projected Date of Disposition17-JUL-12
GroundsAdvice letter requires staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3943E
Advice Letter Filed10-NOV-11
Suspension Begin Date06-DEC-11
Suspension End Date03-APR-12
Projected Date of Disposition01-AUG-12
GroundsAdvice letter requires staff review.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2301E
Advice Letter Filed10-NOV-11
Suspension Begin Date06-DEC-11
Suspension End Date03-APR-12
Projected Date of Disposition01-AUG-12
GroundsAdvice letter requires staff review.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2653E
Advice Letter Filed10-NOV-11
Suspension Begin Date06-DEC-11
Suspension End Date03-APR-12
Projected Date of Disposition01-AUG-12
GroundsAdvice letter requires staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3951E
Advice Letter Filed18-NOV-11
Suspension Begin Date18-DEC-11
Suspension End Date16-APR-12
Projected Date of Disposition14-AUG-12
GroundsResolution Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4057E
Advice Letter Filed07-JUN-12
Suspension Begin Date07-JUL-12
Suspension End Date05-NOV-12
Projected Date of Disposition05-MAR-13
GroundsSection 455 Hearing is required. A Commission resolution maybe required to address the AL.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4093E
Advice Letter Filed30-JUL-12
Suspension Begin Date29-AUG-12
Suspension End Date26-DEC-12
Projected Date of Disposition25-APR-13
GroundsAL requires staff review.

Utility NameSouthern California Gas Company (U-0904)
Advice Letter Number4459G
Advice Letter Filed04-FEB-13
Suspension Begin Date05-MAR-13
Suspension End Date02-JUL-13
Projected Date of Disposition30-OCT-13
GroundsAdditional Time Needed

Utility NameEllwood Pipeline, Inc. (U-0021)
Advice Letter Number4O
Advice Letter Filed27-FEB-13
Suspension Begin Date29-MAR-13
Suspension End Date26-JUL-13
Projected Date of Disposition23-NOV-13
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3376G/4207E
Advice Letter Filed02-APR-13
Suspension Begin Date02-MAY-13
Suspension End Date29-AUG-13
Projected Date of Disposition27-DEC-13
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2890E
Advice Letter Filed03-MAY-13
Suspension Begin Date02-JUN-13
Suspension End Date30-SEP-13
Projected Date of Disposition28-JAN-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2914E
Advice Letter Filed10-JUN-13
Suspension Begin Date10-JUL-13
Suspension End Date06-NOV-13
Projected Date of Disposition06-MAR-14
GroundsAdvice letter Requests a Commission Order

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4243E
Advice Letter Filed27-JUN-13
Suspension Begin Date27-JUL-13
Suspension End Date25-NOV-13
Projected Date of Disposition25-MAR-14
GroundsAdditional Time Needed

Utility NameSouthern California Gas Company (U-0904)
Advice Letter Number4517G
Advice Letter Filed02-JUL-13
Suspension Begin Date01-AUG-13
Suspension End Date02-DEC-13
Projected Date of Disposition01-APR-14
GroundsAdditional Time Needed

Utility NamePhillips 66 Pipeline LLC (U-0025)
Advice Letter Number8
Advice Letter Filed27-AUG-13
Suspension Begin Date03-OCT-13
Suspension End Date30-JAN-14
Projected Date of Disposition30-MAY-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4280E
Advice Letter Filed05-SEP-13
Suspension Begin Date06-OCT-13
Suspension End Date03-FEB-14
Projected Date of Disposition03-JUN-14
GroundsAL requires staff review.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2518E
Advice Letter Filed06-SEP-13
Suspension Begin Date06-OCT-13
Suspension End Date03-FEB-14
Projected Date of Disposition03-JUN-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4292E
Advice Letter Filed30-SEP-13
Suspension Begin Date30-OCT-13
Suspension End Date26-FEB-14
Projected Date of Disposition26-JUN-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2946E
Advice Letter Filed04-OCT-13
Suspension Begin Date19-DEC-13
Suspension End Date17-APR-14
Projected Date of Disposition15-AUG-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4299E
Advice Letter Filed10-OCT-13
Suspension Begin Date09-NOV-13
Suspension End Date10-MAR-14
Projected Date of Disposition08-JUL-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4301E
Advice Letter Filed10-OCT-13
Suspension Begin Date09-NOV-13
Suspension End Date10-MAR-14
Projected Date of Disposition08-JUL-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4300E
Advice Letter Filed10-OCT-13
Suspension Begin Date01-APR-14
Suspension End Date29-JUL-14
Projected Date of Disposition26-NOV-14
GroundsAdditional Time Needed

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2529E
Advice Letter Filed21-OCT-13
Suspension Begin Date20-NOV-13
Suspension End Date19-MAR-14
Projected Date of Disposition17-JUL-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2952E
Advice Letter Filed21-OCT-13
Suspension Begin Date20-NOV-13
Suspension End Date19-MAR-14
Projected Date of Disposition17-JUL-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2955E
Advice Letter Filed29-OCT-13
Suspension Begin Date01-JAN-14
Suspension End Date30-APR-14
Projected Date of Disposition28-AUG-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4309E
Advice Letter Filed30-OCT-13
Suspension Begin Date29-NOV-13
Suspension End Date28-MAR-14
Projected Date of Disposition26-JUL-14
GroundsAdditional Time Needed

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2530E
Advice Letter Filed30-OCT-13
Suspension Begin Date29-NOV-13
Suspension End Date28-MAR-14
Projected Date of Disposition26-JUL-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2956E
Advice Letter Filed30-OCT-13
Suspension Begin Date29-NOV-13
Suspension End Date28-MAR-14
Projected Date of Disposition26-JUL-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4306E
Advice Letter Filed31-OCT-13
Suspension Begin Date01-DEC-13
Suspension End Date01-APR-14
Projected Date of Disposition30-JUL-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2960E
Advice Letter Filed31-OCT-13
Suspension Begin Date01-DEC-13
Suspension End Date01-APR-14
Projected Date of Disposition30-JUL-14
GroundsAdditional Time Needed

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2534E
Advice Letter Filed06-NOV-13
Suspension Begin Date01-DEC-13
Suspension End Date01-APR-14
Projected Date of Disposition30-JUL-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4318E
Advice Letter Filed18-NOV-13
Suspension Begin Date18-DEC-13
Suspension End Date16-APR-14
Projected Date of Disposition14-AUG-14
GroundsAdditional Time Needed

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2537E
Advice Letter Filed18-NOV-13
Suspension Begin Date18-DEC-13
Suspension End Date16-APR-14
Projected Date of Disposition14-AUG-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2967E
Advice Letter Filed18-NOV-13
Suspension Begin Date18-DEC-13
Suspension End Date16-APR-14
Projected Date of Disposition14-AUG-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2968E
Advice Letter Filed18-NOV-13
Suspension Begin Date18-DEC-13
Suspension End Date16-APR-14
Projected Date of Disposition14-AUG-14
GroundsAdditional Time Needed

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2538E/2240G
Advice Letter Filed19-NOV-13
Suspension Begin Date19-DEC-13
Suspension End Date17-APR-14
Projected Date of Disposition15-AUG-14
GroundsAdditional Time Needed

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2549E
Advice Letter Filed27-NOV-13
Suspension Begin Date27-DEC-13
Suspension End Date25-APR-14
Projected Date of Disposition23-AUG-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2977E
Advice Letter Filed27-NOV-13
Suspension Begin Date27-DEC-13
Suspension End Date25-APR-14
Projected Date of Disposition23-AUG-14
GroundsAdditional Time Needed

Utility NamePacificorp (U-0901)
Advice Letter Number496E
Advice Letter Filed04-DEC-13
Suspension Begin Date03-JAN-14
Suspension End Date02-MAY-14
Projected Date of Disposition30-AUG-14
GroundsAdditional Time Needed

Utility NameSouthern California Gas Company (U-0904)
Advice Letter Number4576G
Advice Letter Filed06-DEC-13
Suspension Begin Date05-JAN-14
Suspension End Date05-MAY-14
Projected Date of Disposition02-SEP-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3441G/4328E
Advice Letter Filed19-DEC-13
Suspension Begin Date18-JAN-14
Suspension End Date19-MAY-14
Projected Date of Disposition16-SEP-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3439G/4327E
Advice Letter Filed19-DEC-13
Suspension Begin Date21-JAN-14
Suspension End Date20-MAY-14
Projected Date of Disposition17-SEP-14
GroundsAdditional Time Needed

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2560E/2255G
Advice Letter Filed19-DEC-13
Suspension Begin Date20-JAN-14
Suspension End Date19-MAY-14
Projected Date of Disposition16-SEP-14
GroundsAdditional Time Needed

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2558E/2253G
Advice Letter Filed19-DEC-13
Suspension Begin Date21-JAN-14
Suspension End Date20-MAY-14
Projected Date of Disposition17-SEP-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2989E
Advice Letter Filed19-DEC-13
Suspension Begin Date21-JAN-14
Suspension End Date20-MAY-14
Projected Date of Disposition17-SEP-14
GroundsAdditional Time Needed

Utility NameSouthern California Gas Company (U-0904)
Advice Letter Number4581G
Advice Letter Filed19-DEC-13
Suspension Begin Date21-JAN-14
Suspension End Date20-MAY-14
Projected Date of Disposition17-SEP-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4331E
Advice Letter Filed20-DEC-13
Suspension Begin Date26-JUN-14
Suspension End Date23-OCT-14
Projected Date of Disposition20-FEB-15
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3443G/4338E
Advice Letter Filed30-DEC-13
Suspension Begin Date29-JAN-14
Suspension End Date28-MAY-14
Projected Date of Disposition25-SEP-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number190G/2991E
Advice Letter Filed30-DEC-13
Suspension Begin Date29-JAN-14
Suspension End Date28-MAY-14
Projected Date of Disposition25-SEP-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4339E
Advice Letter Filed31-DEC-13
Suspension Begin Date30-JAN-14
Suspension End Date29-MAY-14
Projected Date of Disposition26-SEP-14
GroundsAdditional Time Needed

Utility NameThe California Center For Sustainable Energy(CCSE) (U-0930)
Advice Letter Number45E
Advice Letter Filed31-DEC-13
Suspension Begin Date01-FEB-14
Suspension End Date02-JUN-14
Projected Date of Disposition30-SEP-14
GroundsAdditional Time Needed

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2569E
Advice Letter Filed17-JAN-14
Suspension Begin Date16-FEB-14
Suspension End Date16-JUN-14
Projected Date of Disposition14-OCT-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4343E
Advice Letter Filed21-JAN-14
Suspension Begin Date20-FEB-14
Suspension End Date19-JUN-14
Projected Date of Disposition17-OCT-14
GroundsAdditional Time Needed

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2566E
Advice Letter Filed21-JAN-14
Suspension Begin Date20-FEB-14
Suspension End Date19-JUN-14
Projected Date of Disposition17-OCT-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2993E
Advice Letter Filed21-JAN-14
Suspension Begin Date20-FEB-14
Suspension End Date19-JUN-14
Projected Date of Disposition17-OCT-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2995E
Advice Letter Filed23-JAN-14
Suspension Begin Date30-APR-14
Suspension End Date27-AUG-14
Projected Date of Disposition25-DEC-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4352E
Advice Letter Filed30-JAN-14
Suspension Begin Date01-MAR-14
Suspension End Date30-JUN-14
Projected Date of Disposition28-OCT-14
GroundsAdditional Time Needed

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2573E
Advice Letter Filed30-JAN-14
Suspension Begin Date01-MAR-14
Suspension End Date30-JUN-14
Projected Date of Disposition28-OCT-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2996E
Advice Letter Filed30-JAN-14
Suspension Begin Date01-MAR-14
Suspension End Date30-JUN-14
Projected Date of Disposition28-OCT-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4356E
Advice Letter Filed06-FEB-14
Suspension Begin Date08-MAR-14
Suspension End Date07-JUL-14
Projected Date of Disposition04-NOV-14
GroundsAdditional Time Needed

Utility NameSouthern California Gas Company (U-0904)
Advice Letter Number4603G
Advice Letter Filed06-FEB-14
Suspension Begin Date08-MAR-14
Suspension End Date07-JUL-14
Projected Date of Disposition04-NOV-14
GroundsAdditional Time Needed

Utility NameSouthern California Gas Company (U-0904)
Advice Letter Number4604G
Advice Letter Filed06-FEB-14
Suspension Begin Date08-MAR-14
Suspension End Date07-JUL-14
Projected Date of Disposition04-NOV-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4355E
Advice Letter Filed07-FEB-14
Suspension Begin Date28-AUG-14
Suspension End Date26-DEC-14
Projected Date of Disposition25-APR-15
GroundsResolution Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number3003E
Advice Letter Filed07-FEB-14
Suspension Begin Date15-MAY-14
Suspension End Date11-SEP-14
Projected Date of Disposition09-JAN-15
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number3004E
Advice Letter Filed07-FEB-14
Suspension Begin Date01-APR-14
Suspension End Date29-JUL-14
Projected Date of Disposition26-NOV-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3455G
Advice Letter Filed18-FEB-14
Suspension Begin Date20-MAR-14
Suspension End Date17-JUL-14
Projected Date of Disposition14-NOV-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4362E
Advice Letter Filed18-FEB-14
Suspension Begin Date11-SEP-14
Suspension End Date08-JAN-15
Projected Date of Disposition08-MAY-15
GroundsAdditional Time Needed

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2271G
Advice Letter Filed18-FEB-14
Suspension Begin Date20-MAR-14
Suspension End Date17-JUL-14
Projected Date of Disposition14-NOV-14
GroundsAdditional Time Needed

Utility NameSouthern California Gas Company (U-0904)
Advice Letter Number4607G
Advice Letter Filed18-FEB-14
Suspension Begin Date20-MAR-14
Suspension End Date17-JUL-14
Projected Date of Disposition14-NOV-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4363E
Advice Letter Filed19-FEB-14
Suspension Begin Date11-SEP-14
Suspension End Date08-JAN-15
Projected Date of Disposition08-MAY-15
GroundsAdditional Time Needed

Utility NameSouthern California Gas Company (U-0904)
Advice Letter Number4608G
Advice Letter Filed19-FEB-14
Suspension Begin Date21-MAR-14
Suspension End Date18-JUL-14
Projected Date of Disposition15-NOV-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4364E
Advice Letter Filed20-FEB-14
Suspension Begin Date11-SEP-14
Suspension End Date08-JAN-15
Projected Date of Disposition08-MAY-15
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4360E
Advice Letter Filed20-FEB-14
Suspension Begin Date22-MAR-14
Suspension End Date21-JUL-14
Projected Date of Disposition18-NOV-14
GroundsAdditional Time Needed

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2579E
Advice Letter Filed21-FEB-14
Suspension Begin Date23-MAR-14
Suspension End Date21-JUL-14
Projected Date of Disposition18-NOV-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number3006E
Advice Letter Filed21-FEB-14
Suspension Begin Date23-MAR-14
Suspension End Date21-JUL-14
Projected Date of Disposition18-NOV-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4367E
Advice Letter Filed25-FEB-14
Suspension Begin Date24-MAR-14
Suspension End Date21-JUL-14
Projected Date of Disposition18-NOV-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4365E
Advice Letter Filed27-FEB-14
Suspension Begin Date01-MAY-14
Suspension End Date28-AUG-14
Projected Date of Disposition26-DEC-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3461GI4366E
Advice Letter Filed28-FEB-14
Suspension Begin Date30-MAR-14
Suspension End Date28-JUL-14
Projected Date of Disposition25-NOV-14
GroundsAdditional Time Needed

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2580E
Advice Letter Filed04-MAR-14
Suspension Begin Date08-MAY-14
Suspension End Date04-SEP-14
Projected Date of Disposition02-JAN-15
GroundsAdditional Time Needed

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2583EI2276G
Advice Letter Filed06-MAR-14
Suspension Begin Date05-APR-14
Suspension End Date04-AUG-14
Projected Date of Disposition02-DEC-14
GroundsAL requires staff review.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number3012E
Advice Letter Filed07-MAR-14
Suspension Begin Date06-APR-14
Suspension End Date04-AUG-14
Projected Date of Disposition02-DEC-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number3013E
Advice Letter Filed12-MAR-14
Suspension Begin Date11-APR-14
Suspension End Date08-AUG-14
Projected Date of Disposition06-DEC-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number3014E
Advice Letter Filed12-MAR-14
Suspension Begin Date11-APR-14
Suspension End Date08-AUG-14
Projected Date of Disposition06-DEC-14
GroundsAdditional Time Needed

Utility NameGolden State Water Company (U-0913)
Advice Letter Number282E
Advice Letter Filed18-MAR-14
Suspension Begin Date17-APR-14
Suspension End Date14-AUG-14
Projected Date of Disposition12-DEC-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4377E
Advice Letter Filed18-MAR-14
Suspension Begin Date17-APR-14
Suspension End Date14-AUG-14
Projected Date of Disposition12-DEC-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4376E
Advice Letter Filed18-MAR-14
Suspension Begin Date17-APR-14
Suspension End Date14-AUG-14
Projected Date of Disposition12-DEC-14
GroundsAdditional Time Needed

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2586E
Advice Letter Filed18-MAR-14
Suspension Begin Date17-APR-14
Suspension End Date14-AUG-14
Projected Date of Disposition12-DEC-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number3017E
Advice Letter Filed18-MAR-14
Suspension Begin Date17-APR-14
Suspension End Date14-AUG-14
Projected Date of Disposition12-DEC-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number3018E
Advice Letter Filed18-MAR-14
Suspension Begin Date17-APR-14
Suspension End Date14-AUG-14
Projected Date of Disposition12-DEC-14
GroundsAdditional Time Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number3019E
Advice Letter Filed20-MAR-14
Suspension Begin Date19-APR-14
Suspension End Date18-AUG-14
Projected Date of Disposition16-DEC-14
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3465G/4385E
Advice Letter Filed27-MAR-14
Suspension Begin Date26-APR-14
Suspension End Date25-AUG-14
Projected Date of Disposition23-DEC-14
GroundsAdditional Time Needed