STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION

Southern California Edison's Devers–Palo Verde No. 2 Transmission Line Project

(Application No. A.05-04-015)

Welcome to the California Public Utilities Commission (CPUC) website for the California Environmental Quality Act (CEQA) review of proposed construction of the Devers–Palo Verde No. 2 Transmission Line Project. An application for this project was submitted to the CPUC on April 11, 2005. The application was determined to be complete and in compliance with CPUC requirements on September 30, 2005. This site provides access to public documents and information relevant to the CEQA review process.

Background

SCE has filed an application with the CPUC to construct the Devers–Palo Verde No. 2 Transmission Line Project (DPV2). The CPUC is the CEQA lead agency and the U.S. Bureau of Land Management is the lead agency under the National Environmental Policy Act (NEPA). This project was approved by the California Independent System Operator (CAISO) in February 2005.

The DPV2 Project as proposed by SCE includes a new 230-mile 500 kV line from the Harquahala Substation (in Arizona, near the Palo Verde nuclear power plant) to SCE's Devers Substation (in North Palm Springs, California). The 500 kV portion would follow the existing SCE 500 kV transmission line, Devers–Palo Verde No. 1 (DPV1).

The DPV2 Project also includes upgrades to an additional 50 miles of 230 kV transmission lines west of the Devers Substation. Forty miles of 230 kV transmission line from Devers Substation to San Bernardino Junction at the western end of San Timoteo Canyon would be reconfigured and two separate 230 kV corridors, from San Bernardino Junction to SCE's Mountain View Substation and from San Bernardino Junction to SCE's Vista Substation would be reconductored. Map 1-1 shows the project from Devers Substation to Harquahala Generation Station and Map 1-2 shows the segment west of Devers Substation.

Proponent's Environmental Assessment (PEA)

The PEA was published April 11, 2005. It should be noted that there will be a number of data requests and data responses for this project, which will provide additional clarification on project components as well as construction and operation activities. The latest information for this project will be provided in the project description of the Draft EIR/EIS that will be prepared for the DPV2 Project.

Notice of Preparation/Notice of Intent and Project Scoping

The Notice of Preparation of an Environmental Impact Report (EIR) and Notice of Public Scoping Meetings for the project was mailed on October 21, 2005.

DPV2 Public Scoping Meetings
Location
Blythe, CA
Beaumont, CA
Palm Desert, CA
Day and Date
Tuesday,
November 1, 2005
Wednesday,
November 2, 2005
Thursday,
November 3, 2005
Time
6 to 8 p.m.
3 to 5 p.m. and 7 to 9 p.m.
3 to 5 p.m. and 7 to 9 p.m.
Address
City of Blythe
Multipurpose Room
235 North Broadway
Blythe, CA 92225
City of Beaumont
Council Chambers
Civic Center
550 East 6th Street
Beaumont, CA 92223
CSUSB Palm Desert Campus
Oliphant Auditorium (Room 117)
37-500 Cook Street
Palm Desert, CA 92211
Area
Covered
Easternmost California and western Arizona
San Gorgonio Pass area; San Timoteo Canyon; Beaumont, Banning, Calimesa
Coachella Valley
(Coachella, Indio, Cathedral City, Palm Springs)
Directions
Exit I-10 at Lovekin Boulevard and turn north for 2 blocks to Hobsonway. Turn right (east); continue for 7 blocks and turn left (north) on Broadway.
Exit I-10 at Beaumont Avenue and turn north for 2 blocks to East 6th Street. Turn right (east) for 2 blocks to the Civic Center.
Exit I-10 at Cook Street and turn south on Cook Street. The CSUSB campus is on the left just south of Gerald Ford Drive. Parking charges will be underwritten for this meeting.

The purpose of the public scoping meetings is to gather information on public and agency concerns about the project as proposed and also to hear recommendations about alternatives.

Draft Environmental Impact Report/Environmental Impact Statement

The CPUC will prepare a Draft EIR/EIS for the proposed project. Publication of the Draft EIR/EIS will be in May 2006. When completed, the Draft EIR/EIS will be available on this website.

For Additional Information

The CPUC, through its Environmental Review Team, is conducting an environmental review of the project. To request additional information or to be added to the mailing list, please contact us by email, fax, or phone, as follows:

Project email: dpv2@aspeneg.com
Project fax and voicemail: (800) 886-1888

The CPUC's Project Manager is:

Billie Blanchard, CPUC Project Manager
California Public Utilities Commission
505 Van Ness Avenue
San Francisco CA 94102
Tel. (415) 703-2068
Fax (415) 703-2200
Email: bcb@cpuc.ca.gov
 
   