STATE OF CALIFORNIA
|
||
|
||
Proponent's Environmental Assessment
|
These files are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC. Note: For best results in displaying the largest files (see sizes shown in parentheses below for files larger than 3.0 MB), right-click the file's link, click "Save Target As" to download the file to a folder on your hard drive, then browse to that folder and double-click the downloaded file to open it in Acrobat. |
|
||||||||
Chapter
3. Environmental Setting and Impacts (11 MB) Figure 3.1-1 Photograph Viewpoint Locations Figure 3.1-2 Photographs of Potrero Switchyard Site (4 Sheets) Figure 3.1-3A Existing View from 23rd Street East of Illinois Street Figure 3.1-3B Visual Simulation from 23rd Street East of Illinois Street Figure 3.1-4A Existing View from 23rd Street at Illinois Street Figure 3.1-4B Visual Simulation from 23rd Street at Illinois Street Figure 3.4-1 Critical Habitat Figure 3.4-2 Subtidal Habitat Figure 3.4-3 Herring Spawning Locations and Seal Haul?out Sites in the San Francisco Bay Figure 3.5-1 Cultural Records Search Figure 3.6-1 Geologic Site Plan Figure 3.6-2 Water Depth Figure 3.6-3 Fault Map Figure 3.6-4 Liquefaction Hazard Figure 3.8-1 Potrero Site Map Figure 3.9-1 South Bay Basin Figure 3.9-2 East San Francisco Flood Plain Map Figure 3.10-1 San Francisco Port Jurisdiction Area Figure 3.10-2 Embarcadero Land Use Figure 3.10-3 Potrero Land Use Figure 3.10-4 Planning Areas Figure 3.10-5 Eastern Neighborhoods Streets and Open Space Concept Map Figure 3.10-6 BCDC San Francisco Waterfront Special Area Plan Map 4 Figure 3.10-7 BCDC San Francisco Waterfront Special Area Plan Map 6 Figure 3.12-1 Land Uses in Vicinity of Embarcadero Portion of Project Figure 3.12-2 Land Uses in Vicinity of Potrero Portion of Project Figure 3.17-1 Existing Combined Sewer Outflows in San Francisco |
||||||||
Chapter
4. Mandatory Findings of Significance and Cumulative and Growth-Inducing
Analysis Figure 4-1 Embarcadero-Potrero Proposed Projects |
||||||||
Chapter
5. Alternatives Figure 5-1 Alternatives Figure 5-2 Switchyard Alternatives |
||||||||
Chapter 6. List of Preparers | ||||||||
|
||||||||
This page contains tables and is best viewed with Firefox or Internet Explorer. Please report any problems to the Energy Division web coordinator. |
||||||||