STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION

Kirby Hills Natural Gas Storage Facility - Phase I

   
 

   
Proponent's Environmental Assessment, July 2005

These files are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC. Note: For best results in displaying the largest files (see sizes shown in parentheses below for files larger than 3MB), right-click the file's link, click "Save Target As" to download the file to your hard drive, then double-click the downloaded file to open it in Acrobat.
 
Front Matter and Contents
Executive Summary
1. Introduction
2. Project Description
3. Environmental Analysis
3.1  Aesthetics/Visual Resources
3.2  Air Quality
3.3  Biological Resources
3.4  Cultural Resources
3.5  Energy and Mineral Resources
3.6  Geology, Soils, and Paleontology
3.7  Hydrology and Water Quality
3.8  Land Use, Planning, and Agricultural Uses
3.9  Noise
3.10  Public Health and Safety
3.11  Public Services and Utilities
3.12  Transportation and Circulation
4. Citations
5. List of Preparers
Acronyms and Abbreviations
Glossary

Appendix A. Project Description Figures:
Part 1 (3.4MB)  Part 2 (3.9MB)  Part 3  Part 4 (3.8MB)
Appendix B. Landowner List
Appendix C. Construction and Operations Emission Estimates for the Kirby Hills Natural Gas Storage Project
   

This page contains tables and is best viewed with Mozilla Firefox or Internet Explorer. Please report any problems to the Energy Division web coordinator.

   
 
Project Home Page - CPUC Environmental Information - CPUC Home