Application
Appendix
A. Organizing Documents
Appendix B. Project
Plan
Appendix C. Programmatic
Agreement
Appendix D. Prepared
Testimony
Appendix E. Cost
Estimate
Appendix F.
Proposed Construction Schedule
Appendix G. EMF Management
Plan
Appendix H. Forms
of Notice
Appendix I. Financial
Statements
Appendix J.
Disclosure of Interests |
Chapter 1. Proponent's
Environmental Assessment Summary
1.1. Introduction
1.2. Major Conclusions of the PEA
1.3. Areas of Controversy
1.4. Issues to be Resolved
1.5. Inter-Agency Coordination and Public Outreach |
Chapter 2.
Project Purpose and Need
2.1. Overview |
Chapter 3. Project
Description (4.7MB)
3.1. Introduction
3.2. Project Location
3.3. Existing System
3.4. Project Objectives
3.5. Proposed Project
3.6. Project Components
3.7. Right-of-Way Requirements
3.8. Construction
3.9. Operation and Maintenance
3.10. Applicant Proposed Measures
3.11. Electric and Magnetic Fields Summary
Figure
3.1.1-4. TE/VS Corridor Maps (19.3MB)
Figure
3.1.1-5. 115 kV Corridor Plan
Figure
3.1.1-6. LEAPS Pumped Storage Component
Figure 3.6.1-7.
Lake 500 kV Switchyard
Figure
3.6.1-11. Santa Rosa Substation Site
Figure
3.6.1-16. Case Springs Substation
Figure 3.6.3-2.
Talega-Escondido 230 kV Line Upgrade Maps |
Chapter 4.
Environmental and Regulatory Setting (32.4MB)
4.1. General Environmental Setting
4.2. General Regulatory Setting
4.3. Aesthetics
4.4. Agricultural Resources
4.5. Air Quality
4.6. Biological Resources
4.7. Cultural Resources
4.8. Geology and Soils,
4.9. Hazards and Hazardous Materials
4.10. Hydrology and Water Quality
4.11. Land Use and Planning
4.12. Mineral Resources
4.13. Noise
4.14. Population and Housing
4.15. Public Services
4.16. Recreation
4.17. Transportation and Traffic
4.18. Utilities and Service Systems
4.19. Energy Resources |
Chapter 5.
Environmental Impact Assessment Summary
5.0. Introduction to Environmental Impact Assessment
Summary
5.1. Visual Resources
5.2. Agriculture Resources
5.3. Air Quality
5.4. Biological Resources
5.5. Cultural Resources
5.6. Geology, Soils, and Seismicity
5.7. Public Health and Safety
5.8. Water Resources
5.9. Land Use and Planning
5.10. Mineral Resources
5.11. Noise
5.12. Socioeconomics
5.13. Public Services and Utilities
5.14. Wilderness and Recreation
5.15. Transportation and Traffic
5.16. Fuels and Fire
5.17. Cumulative Analysis
5.18. Growth Inducing Impacts |
Chapter
6. Detailed Discussion of Significant Impacts (9.1MB)
6.1. Mitigation Measures Proposed to Minimize Significant
Effects
6.2. Description of Project Alternatives and Impact Analysis
6.3. Growth-Inducing Impacts |
Chapter
7. List of Potentially Affected Property Owners |
References |
Attachments
Attachment 1. Tower Placement, Data Information Tables and Location
Information
Attachment 2. 3M ACCR
Technical Information
Attachment 3.
Tower Sites Environmental and Engineering Assessments
Attachment 4. Articles, Conditions,
and Measures
Attachment 5. Applicant Proposed
Measures
Attachment 6. Related
Projects
Attachment 7. Environmental
Impact Assessment Summary Form*
Attachment 8. Import
Capabilities**
Attachment 9. Federal Communications
Attachment 10.
Utility Data Request Letter
Attachment
11. Mile-by-Mile Description |