CPUC/ANF Environmental Monitoring Activities Pacific Pipeline Construction Project |
Aspen Environmental Group | Saturday, January 02, 1999 |
The following is a brief summary of the environmental monitoring activities that were completed on January 02, 1999. This summary is based on reports directly received from the field and has not been edited. If you have any questions please contact (818) 597-3407. Please note the item number and the correction that should be made. This report is intended to serve as a communication document and as an instrument for quality control.
Construction Highlights
01/02/99 (Saturday)Segment 1 (Emidio to ANF) - Report for 2 January 1999: Construction crews were working south of the I-5/Tejon Bench bore laying pipe, crews were pushing pipe through the I-5/Tejon Bench bore from the west side (only one more joint until the pipe is through), pipe was also being installed at the Grapevine Creek bore (Stream Crossing #9). Hydrotest crew prepared for fill at Trib to Cuddy Creek. A memo was issued regarding an unprotected storm drain south of Trib to Cuddy Creek. Non-compliance #110011 was issued because spoils are entering Trib to Cuddy Creek and there are no erosion control devices in place.
Inspection Summar
In the past 24 hours, 1 inspection event(s) were reported for 1 spread(s). Of these inspections, 0 were non-compliance event(s). Also 0 non-compliance resolution report(s) was resolved.
Non-Compliance Reports (NCR's) Issued
Spread 1: NCR Report(s) Issued
NCR# 1990104 | Monitor's Name: Kris Thorne | Inspection Date: 1/2/99 | |
Inspection Code: 2 | From Trib to Cuddy Creek north to Grapevine Creek bore. | ||
Begin Station: 0 | End Station: 31 | Landowner: Private | Activity: Grading |
Non-Compliance Resolution Reports (NCRR's) Issued
No new non-compliance reports were issued during the last reporting period.
Summary of Follow-up Items for Today
No follow-up items were reported for today.