Daily Report

CPUC/ANF Environmental Monitoring Activities

Pacific Pipeline Construction Project

Aspen Environmental Group Saturday, January 02, 1999
   

The following is a brief summary of the environmental monitoring activities that were completed on January 02, 1999. This summary is based on reports directly received from the field and has not been edited. If you have any questions please contact (818) 597-3407. Please note the item number and the correction that should be made. This report is intended to serve as a communication document and as an instrument for quality control.

Construction Highlights

01/02/99 (Saturday)

Segment 1 (Emidio to ANF) - Report for 2 January 1999: Construction crews were working south of the I-5/Tejon Bench bore laying pipe, crews were pushing pipe through the I-5/Tejon Bench bore from the west side (only one more joint until the pipe is through), pipe was also being installed at the Grapevine Creek bore (Stream Crossing #9). Hydrotest crew prepared for fill at Trib to Cuddy Creek. A memo was issued regarding an unprotected storm drain south of Trib to Cuddy Creek. Non-compliance #110011 was issued because spoils are entering Trib to Cuddy Creek and there are no erosion control devices in place.

Inspection Summar

In the past 24 hours, 1 inspection event(s) were reported for 1 spread(s). Of these inspections, 0 were non-compliance event(s). Also 0 non-compliance resolution report(s) was resolved.

Non-Compliance Reports (NCR's) Issued

Spread 1: NCR Report(s) Issued

NCR# 1990104 Monitor's Name: Kris Thorne Inspection Date: 1/2/99  
Inspection Code: 2 From Trib to Cuddy Creek north to Grapevine Creek bore.
Begin Station: 0 End Station: 31 Landowner: Private Activity: Grading

Non-Compliance Resolution Reports (NCRR's) Issued

No new non-compliance reports were issued during the last reporting period.

Summary of Follow-up Items for Today

No follow-up items were reported for today.