The following is a brief summary of the environmental monitoring activities that were completed between January 20, 1999 1:00 and 1:00 on January 21, 1999. This summary is based on reports directly received from the field and has not been edited. If you have any questions please contact (818) 597-3407. Please note the item number and the correction that should be made. This report is intended to serve as a communication document and as an instrument for quality control.

Construction Highlights

01/20/99 (Wednesday)

Segment 1 (Emidio Pump Station to Copco Road): Report for 20 January 1999: Rain fell throughout the day on Segment 1. Backfill crews worked at Copco Road, Flying J, and Emidio Pump Station tie in locations. Welding and x-ray continued on the surplus pipe strung along Highway 166, including the welding of test heads for hydro testing of this pipe. Coating crews worked on the tie in locations at Grapevine Station. Clean up crews working on Tejon Ranch left early due to rainy conditions.

Segment 5 (Lynwood to Long Beach): Report for 1-20-99. Although rain hampered efforts today and many crews were unable to complete the day work was conducted at the following areas. Crews working at the Edison site placed the bottom vault box into the bore pit. Meanwhile, electrical work was conducted in the control room at Tosco while shoring and excavation of the bore pit continued. Segment 4B (Lynwod to El Segundo): Fiber optic splicing was conducted at Lynwood station while crews dressed the station site and removed debris to allow rock to be placed at El Segundo.

Inspection Summar

In the past 24 hours, 2 inspection event(s) were reported for 2 spread(s). Of these inspections, 0 were non-compliance event(s). Also 0 non-compliance resolution report(s) was resolved.

Non-Compliance Reports (NCR's) Issued

No new non-compliance reports were issued during the last reporting period.

Non-Compliance Resolution Reports (NCRR's) Issued

No new non-compliance reports were issued during the last reporting period.

Summary of Follow-up Items for Today

No follow-up items were reported for today.