Daily Report

CPUC/ANF Environmental Monitoring Activities

Pacific Pipeline Construction Project

Aspen Environmental Group Thursday, January 28, 1999
   

The following is a brief summary of the environmental monitoring activities that were completed between January 28, 1999 1:00 and 1:00 on January 29, 1999. This summary is based on reports directly received from the field and has not been edited. If you have any questions please contact (818) 597-3407. Please note the item number and the correction that should be made. This report is intended to serve as a communication document and as an instrument for quality control.

Construction Highlights

01/28/99 (Thursday)

Segment 1 (Emidio Pump Station to Copco Road): Report for 28 January 1999: General clean up occurred throughout the right of way today. Protective railing was placed along Peace Valley Road at the vent site on Tejon Summit. Backfill worked at Cuddy Creek Tributary and Grapevine Road. Work was done to replace a portion of the Tejon Ranch water line at the I-5/Tejon bore site. Erosion matting was done along B Road. Welders continued to cut up the pipe strung along Highway 166. Minor work occurred at Emidio and Grapevine Pump Stations.

Segment 5 (Lynwood to Long Beach): Report for 1-28-99. Crews drilled then placed rebar into the top of the vault box at the Edison bore pit near EMP 113.5. In addition, dry soil was imported to the site in order to achieve adequate compaction at the bore pit. Meanwhile, potholing activities took place near the future receiving pit for the Huntway bore. Similarly, crews potholed for several lines along the rail road tracks near the southern fence of Tosco. Bore crews lowered the sled and a section of pipe sleeve into the bore pit while crews graded and completed electrical work within the Tosco refinery.

Inspection Summar

In the past 24 hours, 2 inspection event(s) were reported for 2 spread(s). Of these inspections, 0 were non-compliance event(s). Also 0 non-compliance resolution report(s) was resolved.

Non-Compliance Reports (NCR's) Issued

No new non-compliance reports were issued during the last reporting period.

Non-Compliance Resolution Reports (NCRR's) Issued

No new non-compliance reports were issued during the last reporting period.

Summary of Follow-up Items for Today

No follow-up items were reported for today.

Back to Daily Reports

Back to MMCRP Home Page