Daily Report

CPUC/ANF Environmental Monitoring Activities

Pacific Pipeline Construction Project

Aspen Environmental Group Tuesday, February 02, 1999
   

The following is a brief summary of the environmental monitoring activities that were completed between February 02, 1999 1:00 and 1:00 on February 03, 1999. This summary is based on reports directly received from the field and has not been edited. If you have any questions please contact (818) 597-3407. Please note the item number and the correction that should be made. This report is intended to serve as a communication document and as an instrument for quality control.

Construction Highlights

02/02/99 (Tuesday)

Segment 1 (Emidio Pump Station to Copco Road): Report for 2 February 1999: Clean up of the right of way continued on Segment 1 today. This include the removal of spoil and rock from the end of Grapevine Road, as well as the trucking off of the surplus pipe strung along Highway 166. Restoration efforts began along Copco Road near the California Aqueduct.

Segment 5 (Lynwood to Long Beach): Report for 2-2-99. Crews began the final walk through of the Tosco station prior to line fill and checked electrical on the static mixer. The trench was backfilled after potholing was completed along the southern fence line with Tosco. Meanwhile, crews poured concrete around the vault and backfilled the receiving bore pit at the Edsison site. Segment 4B (Lynwood to El Segundo): Painting of the pipes and caulking between the brick walls continued at Lynwood station while crews set up pumps and holding tanks for the line fill at the El Segundo refinery.

Inspection Summar

In the past 24 hours, 2 inspection event(s) were reported for 2 spread(s). Of these inspections, 0 were non-compliance event(s). Also 0 non-compliance resolution report(s) was resolved.

Non-Compliance Reports (NCR's) Issued

No new non-compliance reports were issued during the last reporting period.

Non-Compliance Resolution Reports (NCRR's) Issued

No new non-compliance reports were issued during the last reporting period.

Summary of Follow-up Items for Today

No follow-up items were reported for today.

Back to Daily Reports

Back to MMCRP Home Page