Daily Report

CPUC/ANF Environmental Monitoring Activities

Pacific Pipeline Construction Project

Aspen Environmental Group Wednesday, February 03, 1999
   

The following is a brief summary of the environmental monitoring activities that were completed between February 03, 1999 1:00 and 1:00 on February 04, 1999. This summary is based on reports directly received from the field and has not been edited. If you have any questions please contact (818) 597-3407. Please note the item number and the correction that should be made. This report is intended to serve as a communication document and as an instrument for quality control.

Construction Highlights

02/03/99 (Wednesday)

Segment 1 (Emidio Pump Station to Copco Road): Report for 3 February 1999: The removal of rock and spoil from Grapevine Road continued. Surplus hydrotested pipe along Hwy 168 continued to be loaded onto trucks and hauled away for storage. Restoration and revegetation continued along Copco Road.

Segment 5 (Lynwood to Long Beach): Report for 2-3-99. Crews continued with minor electrical work within the Tosco refinery and began the bore for the Huntway segment. In addition, oil was filled from the Tosco refinery to the Lynwood station. Meanwhile, crews removed the forms from the Edison vault and began backfilling the receiving bore pit. At Lynwood station, crews coated pipe, painted and conducted a general clean up of the station site.

Inspection Summar

In the past 24 hours, 2 inspection event(s) were reported for 2 spread(s). Of these inspections, 0 were non-compliance event(s). Also 0 non-compliance resolution report(s) was resolved.

Non-Compliance Reports (NCR's) Issued

No new non-compliance reports were issued during the last reporting period.

Non-Compliance Resolution Reports (NCRR's) Issued

No new non-compliance reports were issued during the last reporting period.

Summary of Follow-up Items for Today

No follow-up items were reported for today.