The following is a brief summary of the environmental monitoring activities that were completed between February 10, 1999 1:00 and 1:00 on February 11, 1999. This summary is based on reports directly received from the field and has not been edited. If you have any questions please contact (818) 597-3407. Please note the item number and the correction that should be made. This report is intended to serve as a communication document and as an instrument for quality control.
Construction Highlights
02/10/99 (Wednesday)Segment 5 (Lynwood to Long Beach): Report for 2-10-99. Crews excavated and placed shoring boxes into the receiving pit south of the Wilmington refinery. Meanwhile, painting and insulation crews continued work on the above ground pipe within the Wilmington station. Northward, crews cored holes into the top of the vault box then centered the vault bottom in the bore pit at the Edison station site. Likewise, at Lynwood station crews worked to complete the rolling door while final electrical work still remains to be completed on the stations alarm system.
Inspection Summar
In the past 24 hours, 1 inspection event(s) were reported for 1 spread(s). Of these inspections, 0 were non-compliance event(s). Also 0 non-compliance resolution report(s) was resolved.
Non-Compliance Reports (NCR's) Issued
No new non-compliance reports were issued during the last reporting period.
Non-Compliance Resolution Reports (NCRR's) Issued
No new non-compliance reports were issued during the last reporting period.
Summary of Follow-up Items for Today
No follow-up items were reported for today.