The following is a brief summary of the environmental monitoring activities that were completed between February 16, 1999 1:00 and 1:00 on February 17, 1999. This summary is based on reports directly received from the field and has not been edited. If you have any questions please contact (818) 597-3407. Please note the item number and the correction that should be made. This report is intended to serve as a communication document and as an instrument for quality control.

Construction Highlights

02/16/99 (Tuesday)

Segment 5 (Lynwood to Long Beach): Report for 2-16-99. Crews backfilled a section of the bore pit, trenched 60' then welded a section of pipe within the Wilmington refinery for the Huntway line. In addition, crews fabricated a section of pipe for the tie-in to the Huntway station. Further, crews worked on station electrical, painted and insulated pipe while general punch list items were inspected for the Wilmington refinery. Meanwhile, crews placed supports under the pipe then built forms for a concrete casing at the Edison station site. At Lynwood station, crews installed station interior and exterior lighting and progressed with the stations alarm system.

Inspection Summar

In the past 24 hours, 1 inspection event(s) were reported for 1 spread(s). Of these inspections, 0 were non-compliance event(s). Also 0 non-compliance resolution report(s) was resolved.

Non-Compliance Reports (NCR's) Issued

No new non-compliance reports were issued during the last reporting period.

Non-Compliance Resolution Reports (NCRR's) Issued

No new non-compliance reports were issued during the last reporting period.

Summary of Follow-up Items for Today

No follow-up items were reported for today.