Daily Report

CPUC/ANF Environmental Monitoring Activities

Pacific Pipeline Construction Project

Aspen Environmental Group Friday, February 19, 1999
   

The following is a brief summary of the environmental monitoring activities that were completed between February 19, 1999 1:00 and 1:00 on February 20, 1999. This summary is based on reports directly received from the field and has not been edited. If you have any questions please contact (818) 597-3407. Please note the item number and the correction that should be made. This report is intended to serve as a communication document and as an instrument for quality control.

Construction Highlights

02/19/99 (Friday)

Segment 5 (Lynwood to Long Beach): Report for 2-19-99. Crews pulled the shoring boxes, lowered the vault top into place and continued backfilling the bore pit. Meanwhile crews progressed with coating and painting of above ground pipe within the Wilmington refinery. Crews working the Huntway segment lowered in a section of pipe, welded , x-rayed and coated south of Lomita St. In addition, during excavation of a bellhole crews uncovered an 8" Gatx jet fuel line.

Inspection Summar

In the past 24 hours, 1 inspection event(s) were reported for 1 spread(s). Of these inspections, 0 were non-compliance event(s). Also 0 non-compliance resolution report(s) was resolved.

Non-Compliance Reports (NCR's) Issued

No new non-compliance reports were issued during the last reporting period.

Non-Compliance Resolution Reports (NCRR's) Issued

No new non-compliance reports were issued during the last reporting period.

Summary of Follow-up Items for Today

No follow-up items were reported for today.

Back to Daily Reports

Back to MMCRP Home Page