Daily Report

CPUC/ANF Environmental Monitoring Activities

Pacific Pipeline Construction Project

Aspen Environmental Group Thursday, March 04, 1999
   

The following is a brief summary of the environmental monitoring activities that were completed between March 4, 1999 1:00 and 1:00 on March 5, 1999. This summary is based on reports directly received from the field and has not been edited. If you have any questions please contact (818) 597-3407. Please note the item number and the correction that should be made. This report is intended to serve as a communication document and as an instrument for quality control.

Construction Highlights

03/04/99 (Thursday)

Segment 5 (Lynwood to Long Beach): Report for 3-4-99. Crews conducted a general clean up of the right of way removing debris and excess spoils from the right of way along the southern extreme of the Huntway connection. Further, after welding, x-ray and coating crews completed work on a section of pipe, a side boom moved then lowered the 150' section into the ditch. Shortly there after, welders completed the weld in preparation for x-ray and coating. In addition, backfill and duct work progressed through out the day with crews nearing the half way point along the Huntway connection. Finally, water trucks kept dust to a minimum while traffic control crews effectively managed the high volume of truck traffic occurring along the right of way.

Inspection Summar

In the past 24 hours, 1 inspection event(s) were reported for 1 spread(s). Of these inspections, 0 were non-compliance event(s). Also 0 non-compliance resolution report(s) was resolved.

Non-Compliance Reports (NCR's) Issued

No new non-compliance reports were issued during the last reporting period.

Non-Compliance Resolution Reports (NCRR's) Issued

No new non-compliance reports were issued during the last reporting period.

Summary of Follow-up Items for Today

No follow-up items were reported for today.