The following is a brief summary of the environmental monitoring activities that were completed on December 24, 1998. This summary is based on reports directly received from the field and has not been edited. If you have any questions please contact (818) 597-3407. Please note the item number and the correction that should be made. This report is intended to serve as a communication document and as an instrument for quality control.

Construction Highlights

12/24/98 (Thursday)

Segment 1 (Emidio to Copco Road): Report for 24 December 1998: Backfill continued at the California Aqueduct bore site. Installation of casing continued at stream crossing 9 bore. Excavation of the bore pit on the southeast side of the Tejon Bench/I-5 bore continued.

Segment 2B (Castaic to Sylmar): Report for 12-24-98. General clean up of the right of way occurred today along the segment including Weldon Cyn and Calgrove Ave. In addition, fuel tanks were placed on the street at the Castaic yard while contaminated soil was removed from the segment 2 yard.

Segment 3C (Sylmar to San Fernando): Report for 12-24-98. De-watering of the northern segments and loading of the pipe occurred today at Balboa Blvd. In addition, crews continued to clean, grade and remove debris from the rail road right of way along the entire segment. At Balboa, crews welded the pipe segments after installing a cleaning pig. Segment 3A (San Fernando to Taylor Yard): Electrical crews worked at several vault sites while concrete was poured over the pipe at Victory St to protect the shallow pipe while forms were constructed at Hollywood Way for future concrete.

Inspection Summar

In the past 24 hours, 3 inspection event(s) were reported for 3 spread(s). Of these inspections, 0 were non-compliance event(s). Also 0 non-compliance resolution report(s) was resolved.

Non-Compliance Reports (NCR's) Issued

No new non-compliance reports were issued during the last reporting period.

Non-Compliance Resolution Reports (NCRR's) Issued

No new non-compliance reports were issued during the last reporting period.

Summary of Follow-up Items for Today

No follow-up items were reported for today.