STATE OF CALIFORNIA, PETE WILSON, Governor
    - PUBLIC UTILITES COMMISSION
 
    - 505 VAN NESS AVENUE
 
    - SAN FRANCISCO, CA 94102-3298
 
 
July 18, 1997
    - Dean Shauers, Project Manager
 
    - Pacific Pipeline System, Inc.
 
    - 12201 E. Arapahoe Road, C10
 
    - Englewood, CO 80112
 
 
RE: Variance Request Number 7
Dear Mr. Shauers:
We have reviewed the above-referenced variance
request, and our decision follows. In addition, we have been
informed that the Angeles National Forest concurs with our
decision on this matter.
Approved; however, the following measures shall
be implemented:
    - All applicable mitigation measures for the
        project shall be implemented at the subject locations. 
 
    - The following fueling kit shall be
        installed around each piece of equipment fueled within
        the 0.25 mile zone. The kit shall consist of an 8 by
        8-foot area of plastic sheeting placed underneath or
        adjacent to the vehicle and the refueling truck. A 3 by
        3-foot by 6-inch deep pan shall be placed underneath the
        vehicle being refueled. Each refueling truck shall also
        be equipped with automatic shutoff nozzles to prevent
        spillage from overtopping. In addition, absorbent
        material shall be placed around the filler pipe and the
        fueler shall be present throughout the entire fueling
        operation.
 
    - Refueling in the manner stipulated above
        shall only occur along the project ROW at Peace Valley
        Road, Lebec Road, the West Liebre Ridge reroute, and
        Marple Canyon where no live streams are involved.
        Refueling at these locations shall take place at the
        maximum distance feasible from the stream. In no case
        shall refueling take place within 200 feet of the banks
        of any stream.
 
    - Each refueling truck shall contain a fully
        stocked spill containment kit which includes absorbent
        pads, shovels, and appropriate spill containers.
 
    - Variance #7 allows for refueling and
        routine maintenance at the subject locations only if the
        measures stipulated above are followed. Storage of fuel
        or other hazard materials, or vehicle/equipment repair
        shall not be allowed under the provisions of this
        variance.
 
    - All drips, leaks, and/or spills from
        vehicles and/or equipment shall be excavated immediately
        and disposed of in appropriate, labeled containers.
 
    - Implementation of this variance in
        accordance with the provisions noted above shall be
        verified on a random basis by a CPUC/ANF Environmental
        Monitor.
 
Sincerely,

    - Martha J. Sullivan
 
    - Project Manager
 
 
    - cc: R. Borden, ANF
 
    - H. Rastegar, Aspen
 
Back to Variances Pages