These files are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC. Note: For best results in displaying the largest files (see sizes shown in parentheses below for files larger than 5 MB), right-click the file's link, click "Save Target As" to download the file to a folder on your hard drive, then browse to that folder and double-click the downloaded file to open it in Acrobat. |
|
This page was last updated: November 2026
Welcome to the California Public Utilities Commission (CPUC) website for the permitting and construction of AT&T's Riverside 1 Project Gas and Electric Company's (PG&E's) Project (Project). The Project involves the extension of 114 miles of fiber optics communications throughout portions of Riverside County, including the cities of Corona, Eastvale, Jurupa Valley, and Riverside. AT&T has indicated that they can begin work in Q4 2026 and expects to complete the construction within approximately 10 to 12 months. Fiber installation will begin after a CPUC authorized Notice to Proceed (NTP) is issued and multiple NTPs anticipated for segments of the Project. The Project was included in the approval of six projects in the California Public Utilities Commission (CPUC) Resolution T-17907 that authorized the release of Federal Funding Account (FFA) grant funding as a California Environmental Quality Act (CEQA) Exemption with conditions on March 19, 2026. The FFA, administered by the CPUC, is a $2 billion grant program for last-mile broadband infrastructure projects to connect unserved Californians in accordance with 2021’s Senate Bill 156 (Chapter 112, Statutes of 2021). CEQA compliance review was conducted in accordance with California Senate Bill (SB) 131 (Statutes 2025, Chapter 24) which allows for CEQA Statutory Exemption assuming that “the project incorporates, as a condition of approval, measures developed by the Public Utilities Commission, the Department of Transportation, or the city, county, or city and county responsible for the right-of-way to address potential environmental impacts. At minimum, the project shall be required to include monitors during construction activities and measures to avoid or address impacts to cultural and biological resources” (Public Resources Code Section 21080.51). These measures were included in CPUC Resolution T-17907. This website provides access Resolution T-17907 and public documents and information relevant to construction monitoring. An overview of the proposed Project is provided below. The following summarizes the CPUC compliance program, NTPs issued for construction, and monthly construction monitoring reports which document compliance with approved project environmental measures.
Construction Status and Mitigation Monitoring The CPUC and AT&T have prepared a Construction Monitoring, Compliance, and Reporting Program (CMCRP), which is available below. The CMCRP ensures compliance with the environmental measures adopted in Resolution T-17907. The CMCRP outlines the roles of the CPUC Environmental Monitors and AT&T compliance team and contractor(s), and defines the reporting relationships, roles and responsibilities, and procedures for environmental compliance on the Project. The CMCRP will be updated to reflect schedule changes and other revisions as needed. Notices to Proceed (NTPs) are reviewed and will be issued by CPUC by phase of the project as requested by AT&T. Issuance of NTPs is contingent upon AT&T's compliance with pre-construction requirements as specified by the approved project environmental measures. Table 1 below summarizes the NTPs issued by CPUC.
DESCRIPTION OF THE PROPOSED PROJECT AT&T’s Riverside 1 Project includes the installation of aerial fiber that would be placed on existing poles, where possible, which would include lashing fiber to existing AT&T strands and attachments. Where buried (i.e., existing conduit not present) or underground (i.e., existing conduit present) fiber would be installed, directional boring, microtrenching, and/or open trenching methods would be used. Vegetation clearance may be required at ground-disturbing work locations, including open excavations (e.g., trenching), proposed pole locations, proposed access points (handholes/vaults), and bore pits.
COMMENTS & QUESTIONS If you have comments, complaints, or questions regarding the Project, please contact us using the CPUC's Riverside 1 Project email as follows: Project e-mail:Ruchita.Acharya@cpuc.ca.gov
The CPUC's Project Manager is: Ruchita Acharya, CPUC Project Manager |
||||||||||||||||
|