Approved Variances Summary Table Sorted by Variance No. (descending order)
|
|
|
Variance 7&8 | San Gabriel River Crossing. | 04/30/99 |
Variance 6 | Allow for suspension of the SFPP Carson to Norwalk Pipeline on the existing Sante Fe Avenue roadway bridge over Compton Creek, instead of boring under the creek, Los Angeles County. | 04/19/99 |
Variance 5 | Allow for open cut construction (rather than boring) at two locations | 02/18/99 |
Variance 4 | Allow for open cut construction (rather than boring) through the railroad track crossing on Victoria Street, Los Angeles County | 02/11/99 |
Variance 3b | Allow for open cut construction (rather than boring) through the intersection of Alondra Boulevard and Lakewood Boulevard, City of Bellflower | 02/05/99 |
Variance 3a | Open Cut Crossings at Five Locations | 01/29/99 |
Variance 2 | Allow for a two-spread construction scenario for the SFPP Carson to Norwalk Pipeline Project. | 12/21/98 |
Variance 1 | Relocation of the project pipeline through the City of Paramount | 11/06/98 |