             Welcome to the California Public Utilities Commission (CPUC) website 
              for the California Environmental Quality Act (CEQA) review of the 
              proposed Sunrise Powerlink Transmission Line Project. Applications 
              for this project were submitted to the CPUC on December 14, 
              2005 (A.05-12-014) and August 4, 2006 (A.06-08-010). This site 
              provides access to public documents and information relevant to 
              the CEQA and National Environmental Policy Act (NEPA) review processes. 
              The CPUC voted on December 18, 2008 to approve the Final Environmentally 
              Superior Southern Route (see Decision D.08-12-058) 
              and a Notice of Determination was 
              submitted to the State Clearinghouse. The BLM issued a Record 
              of Decision approving the same route on January 20, 2009. 
             Background 
            SDG&E has filed an application with the CPUC to construct the 
              Sunrise Powerlink Project (SRPL). The CPUC is the CEQA lead agency 
              and the U.S. Bureau of Land Management (BLM) is the lead agency 
              under NEPA. The CPUC and BLM are preparing an Environmental Impact 
              Report (EIR, under CEQA) and an Environmental Impact Statement (EIS, 
              under NEPA), which will be published as a single joint document, 
              an EIR/EIS. 
            This project was approved by the California Independent System 
              Operator on August 3, 2006. The Proponent's Environmental Assessment 
              was filed with the CPUC on August 4, 2006 and is available 
              on SDG&E's 
              project website. 
            The CPUC maintains other web pages for documents related to its 
              proceeding on the SRPL, where it makes available documents filed 
              by parties to that proceeding. The web page for Application A.06-08-010 
              incorporates the earlier filing, and lists documents and rulings 
              filed in the proceedings. The CPUC also maintains a page of general 
              information on the SRPL project. 
            The SRPL Project, as proposed by SDG&E, includes a new, approximately 
              90-mile, 500 kV line from Imperial Valley Substation (in Imperial 
              County, near the City of El Centro) to a new Central East Substation 
              (in central San Diego County, south of the intersection of County 
              Highways S22 and S2). The 500 kV portion would 
              approximately follow the eastern boundary of BLM lands west of El 
              Centro and SR 78, and would pass through Anza-Borrego Desert 
              State Park. 
            The SRPL Project also proposes approximately 60 miles of 230 kV 
              transmission lines from the new Central East Substation to SDG&E's 
              existing Peñasquitos Substation (in the City of San 
              Diego). SDG&E proposes to construct two segments underground 
              (one segment south of Ramona and another in the community of Ranchos 
              Peñasquitos, San Diego). Figure 1 
              shows an overview of the proposed project route. 
            Final EIR/EIS 
            The Final EIR/EIS was released to the public on October 13, 
              2008. The Final EIR/EIS is available here 
              and is also available at numerous area libraries 
              and government offices. Copies of the Executive Summary of the 
              Final EIR/EIS along with a DVD of the complete document may be requested. 
              The CPUC and BLM also have a limited number of copies of the complete 
              four-volume Final EIR/EIS document available to the public. Requests 
              for documents should be made to (866) 711-3106 (phone or fax) or 
              via email to sunrise@aspeneg.com. 
            The Notice of Availability provides 
              further information on the approval processes for the CPUC and the 
              BLM. Pursuant to NEPA requirements, the Final EIR/EIS and Proposed 
              Land Use Plan Amendment will be available for review for 30 calendar 
              days from the date the Environmental Protection Agency (EPA) publishes 
              the Notice of Availability (NOA) in the Federal Register, which 
              is expected to occur on October 17, 2008. The review period 
              would end on November 15, 2008. 
             
            Copies of the Executive Summary of the Final EIR/EIS along with 
              a DVD of the complete document may be requested. The CPUC and BLM 
              also have a limited number of copies of the complete four-volume 
              Final EIR/EIS document available to the public. Requests for documents 
              should be made to (866) 711-3106 (phone or fax) or via email to 
              sunrise@aspeneg.com. 
            Draft EIR/EIS 
            The CPUC and BLM published the Draft EIR/EIS in January 2008. Please 
              note that the Final EIR/EIS (described above) includes the entire 
              text of the Draft EIR/EIS, modified where necessary in response 
              to comments on the Draft EIR/EIS. The original text of the Draft 
              EIR/EIS document is available here. 
            EIR/EIS Alternatives 
            Throughout 2007, the CPUC and BLM gathered information on alternatives 
              to the proposed Sunrise Powerlink Project through an extensive public 
              involvement process. Information and documents from that process 
              are available here. 
            Documents Available 
            In addition to the EIR/EIS, other documents that were published 
              during the CEQA and NEPA processes are available here. 
              Documents and letters that were compiled following publication of 
              the Final EIR/EIS, such as SDG&E Biological Assessment, USFWS 
              Biological Opinion, BLM Section 106 Programmatic Agreement, and 
              appeals to the BLM Interior Board of Land Appeals, are also included. 
             
            In response to concerns from the Lakeside community, a fact sheet 
              that summarizes past public notification and consideration of alternative 
              routes in the community of Lakeside is available here 
              (posted February 24, 2009). 
            
            Data Requests 
            The EIR/EIS Team submits Data Requests to SDG&E and other entities 
              when it needs specific information to support EIR/EIS preparation. 
              These requests are available here at 
              the time they are issued. 
            Requests for Technical Information 
              Related to the Draft EIR/EIS 
            During the 90-day public comment period on the Draft EIR/EIS, various 
              parties submitted requests for technical information related to 
              that document. The information provided has available here. 
             
            For Additional Information 
            To request additional information or to be added to the mailing 
              list, please contact us by email, fax, or phone, as follows: 
            
            The CPUC's Project Manager is: 
            Billie Blanchard, CPUC Project Manager 
              California Public Utilities Commission 
              505 Van Ness Avenue 
              San Francisco CA 94102 
              Tel. (415) 703-2068 
              Fax (415) 703-2200 
              Email:  bcb@cpuc.ca.gov
             
           |