             Welcome to the California Public Utilities Commission (CPUC) website 
              for the California Environmental Quality Act (CEQA) review of the 
              proposed Sunrise Powerlink Transmission Line Project. Applications 
              for this project were submitted to the CPUC on December 14, 
              2005 (A.05-12-014) and August 4, 2006 (A.06-08-010). This site 
              provides access to public documents and information relevant to 
              the CEQA and National Environmental Policy Act (NEPA) review processes. 
             Background 
            SDG&E has filed an application with the CPUC to construct the 
              Sunrise Powerlink Project (SRPL). The CPUC is the CEQA lead agency 
              and the U.S. Bureau of Land Management (BLM) is the lead agency 
              under NEPA. The CPUC and BLM are preparing an Environmental Impact 
              Report (EIR, under CEQA) and an Environmental Impact Statement (EIS, 
              under NEPA), which will be published as a single joint document, 
              an EIR/EIS. 
            This project was approved by the California Independent System 
              Operator on August 3, 2006. The Proponent's Environmental Assessment 
              was filed with the CPUC on August 4, 2006 and is available 
              on SDG&E's 
              project website. 
            The CPUC maintains other web pages for documents related to its 
              proceeding on the SRPL, where it makes available documents filed 
              by parties to that proceeding. The web page for Application A.06-08-010 
              incorporates the earlier filing, and lists documents and rulings 
              filed in the proceedings. The CPUC also maintains a page of general 
              information on the SRPL project. 
            The SRPL Project, as proposed by SDG&E, includes a new, approximately 
              90-mile, 500 kV line from Imperial Valley Substation (in Imperial 
              County, near the City of El Centro) to a new Central East Substation 
              (in central San Diego County, south of the intersection of County 
              Highways S22 and S2). The 500 kV portion would 
              approximately follow the eastern boundary of BLM lands west of El 
              Centro and SR 78, and would pass through Anza-Borrego Desert 
              State Park. 
            The SRPL Project also proposes approximately 60 miles of 230 kV 
              transmission lines from the new Central East Substation to SDG&E's 
              existing Peñasquitos Substation (in the City of San 
              Diego). SDG&E proposes to construct two segments underground 
              (one segment south of Ramona and another in the community of Ranchos 
              Peñasquitos, San Diego). Figure 1 
              shows an overview of the proposed project route. 
            Notice of Additional Public Participation 
              Hearings 
            The California Public Utilities Commission (CPUC) is holding two 
              more hearings in Borrego Springs to give the public and interested 
              parties an opportunity to speak directly to CPUC Commissioners and 
              the Administrative Law Judge about the proposed Sunrise Powerlink 
              Project and alternatives evaluated in the EIR/EIS. Two separate 
              hearings will be held on the same day: 
            
               
                | Date: | 
                May 12, 2008 | 
               
               
                | Times: | 
                1:00-5:00 p.m. and 6:30-9:30 p.m. | 
               
               
                | Location: | 
                Borrego Springs Resort, De Anza Room 
                  1112 Tilting T Drive, Borrego Springs, CA 92004 
                  (760) 767-5700 | 
               
             
            Comments made at these hearings will be considered by the CPUC 
              in its decision-making process but will not be considered as comments 
              on the Draft EIR/EIS. As described below, the comment period on 
              the Draft EIR/EIS closed on April 11, 2008. 
            Draft EIR/EIS 
            The Draft EIR/EIS was released to the public on January 3, 
              2008 and the public comment period ended on April 11, 2008. It is 
              available here and is also available 
              for review at numerous area libraries 
              and government offices. 
            Copies of the Executive Summary of the Draft EIR/EIS along with 
              a DVD of the complete document may be requested. The CPUC and BLM 
              also have a limited number of copies of the complete six-volume 
              Draft EIR/EIS document available to the public. Requests for documents 
              should be made to (866) 711-3106 (phone or fax) or via e-mail to 
              sunrise@aspeneg.com. 
            Resumen en Español. Un resumen del borrador Informe 
              de Impacto Ambiental/Declaración de Impacto Ambiental en 
              español está disponible aquí. 
            Informational Workshops. The CPUC and BLM held 9 informational 
              workshops during the week of January 28, 2008. 
            Public Participation Hearings. Five Public Participation 
              Hearings were held in February 2008 to receive oral and written 
              comments on the Draft EIR/EIS from interested parties. Transcripts 
              of these hearings are available at the links below: 
             
              San 
                Diego, 2/25/08 
                Pine 
                Valley, 2/25/08 
                Borrego 
                Springs, 2/26/08 
                Ramona, 
                2/26/08 
                Julian, 
                2/27/08  
             
            EIR/EIS Alternatives 
            Throughout 2007, the CPUC and BLM gathered information on alternatives 
              to the proposed Sunrise Powerlink Project through an extensive public 
              involvement process. Information and documents from that process 
              are available here. 
            Documents Available 
            In addition to the EIR/EIS, other documents that were published 
              during the CEQA and NEPA processes are available here. 
            Data Requests 
            The EIR/EIS Team submits Data Requests to SDG&E and other entities 
              when it needs specific information to support EIR/EIS preparation. 
              These requests are available here at 
              the time they are issued. 
            Requests for Technical Information 
              Related to the Draft EIR/EIS 
            During the 90-day public comment period on the Draft EIR/EIS, various 
              parties submitted requests for technical information related to 
              that document. The information provided has available here. 
             
            For Additional Information 
            To request additional information or to be added to the mailing 
              list, please contact us by email, fax, or phone, as follows: 
            
            The CPUC's Project Manager is: 
            Billie Blanchard, CPUC Project Manager 
              California Public Utilities Commission 
              505 Van Ness Avenue 
              San Francisco CA 94102 
              Tel. (415) 703-2068 
              Fax (415) 703-2200 