Appendix A. Maps / Drawings
Appendix B. Air Quality / Greenhouse Gases Tech Report (Revised Nov. 2023) (38MB)
Appendix C. Biological Resources Assessment (Revised Nov. 2023)
Appendix D. Cultural Resources Report (12MB)
Appendix E. Tribal Consultation Report
Appendix F. Phase I ESA (78MB)
Appendix G. Public Outreach (96MB)
Appendix H. Preliminary Construction FPP (Revised Nov. 2023)
Appendix I. Geotechnical Report
Appendix J. Paleo Inventory
Appendix K. Hazardous Materials Business Plan and Integrated Storm Water and Oil Spill Prevention, Control, and Countermeasure Plan
Appendix L. Hydrology Drainage Study
Appendix M. Noise Modeling
Appendix N. VCM Flow Data
Appendix O. Preliminary Health and Safety Plan (Revised Nov. 2023)
Appendix P. Technical Design Standards
Appendix Q. Pipeline Repair
Appendix R. Traffic Plan (New)
Amended Proponent's Environmental Assessment (November 21, 2023)
Response to PEA Completeness Review:
Cover Letter
Report
Appendix A-2: Conceptual Site Plan Supplemental EDC Alternative
|