STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION

PUC > Energy > Transmission and Environmental Review > Current Projects > CNF Home

San Diego Gas & Electric

Master Special Use Permit and Permit to Construct Power Line Replacement Projects

(Application No. A.12-10-009)

Last Update: September 5, 2014

NOTE: Linked files presented on this page are in PDF format. To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your computer. For faster results in displaying the larger files, right-click the file's link, click "Save Target As" to download the file to your hard drive, then double-click the downloaded file.

Each of the linked PDF files includes bookmarks for ease of navigating directly to a specific section of the Draft EIR/EIS.

 

 

Draft Environmental Impact Report / Environmental Impact Statement (September 5, 2014)

Contents

Part 1 (Front Matter through Section C)

Cover

Title Page

Coversheet

Table of Contents

ES       EXECUTIVE SUMMARY

A.        INTRODUCTION/OVERVIEW

B.        PROJECT DESCRIPTION

C.        ALTERNATIVES DEVELOPMENT AND SCREENING

Part 2 (Section D.1 through Section D.4)

D.      ENVIRONMENTAL ANALYSIS

D.1 Introduction to Environmental Analysis

D.2 Visual Resources

D.3 Air Quality

D.4 Biological Resources

Part 3 (Section D.5 through Section L)

D.5 Cultural and Paleontological Resources

D.6 Greenhouse Gases

D.7 Public Health and Safety

D.8 Fire and Fuels Management

D.9 Hydrology and Water Quality

D.10 Land Use and Planning

D.11 Noise

D.12 Public Services and Utilities

D.13 Recreation

D.14 Transportation and Traffic

D.15 Electromagnetic Fields

E.        COMPARISON OF ALTERNATIVES

F.         CUMULATIVE SCENARIO AND IMPACTS

G.        REQUIRED CEQA/NEPA TOPICS

H.        MITIGATION MONITORING, COMPLIANCE, AND REPORTING PROGRAM

I.          PUBLIC PARTICIPATION

J.         DISTRIBUTION OF DEIR/DEIS

K.        REPORT PREPARATION

L.         INDEX

APPENDICES

BIO-1 Supplementary Special-Status Plants

BIO-2 Special-Status Plant Species Potential to Occur in Project Study Area

BIO-3 Supplementary Special-Status Wildlife

BIO-4 Special-Status Wildlife Species Potential to Occur in Project Study Area

BIO-5 LMP Consistency Evaluation

BIO-6 Special-Status Plant and Wildlife Species Documented Status along Lines not part of the Power Line Replacement Project to be covered under the MSUP

BIO-7 Biological Evaluation/Biological Assessment Example

CUL-1 Power Line Replacement Projects Archaeological Resources (Confidential)

J-1 Distribution List

LU-1A Regional Policies, Plans, and Regulations

LU-1B Land Use Consistency Tables

 

Please report any problems to the Energy Division web coordinator.

  Related Links: