STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION

PUC > Energy > Transmission and Environmental Review > Current Projects > CNF Home

San Diego Gas & Electric

Master Special Use Permit and Permit to Construct Power Line Replacement Projects

(Application No. A.12-10-009)

Last Update: July 10, 2015

NOTE: Linked files presented on this page are in PDF format. To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your computer. For faster results in displaying the larger files, right-click the file's link, click "Save Target As" to download the file to your hard drive, then double-click the downloaded file.

Each of the linked PDF files includes bookmarks for ease of navigating directly to a specific section of the Final EIR/EIS.

 

   

Final Environmental Impact Report / Environmental Impact Statement (June 2015)

Volume 1, Part 1 – Revised EIR/EIS

Volume 1, which contains the Final EIR/EIS and appendices, is completely reprinted from the Draft EIR/EIS. Changes made since public review are signified as a replacement, addition, or revision to existing text. Revisions to existing text are signified by strikeout (i.e., strikeout) where text is removed, and by underlined text (i.e., underline) where text is added for clarification. Changes have been made in response to comments on the Draft EIR/EIS and through ongoing consultation with responsible, trustee, and cooperating government agencies. Revisions were made to update and/or clarify information presented in the Draft EIR/EIS.

Contents
Cover
Title Pages
Coversheet
Interested Party Letter
Table of Contents

ESEXECUTIVE SUMMARY
A.INTRODUCTION/OVERVIEW
B.PROJECT DESCRIPTION
C.ALTERNATIVES DEVELOPMENT AND SCREENING
D.ENVIRONMENTAL ANALYSIS
 
D.1Introduction to Environmental Analysis
D.2Visual Resources
D.3Air Quality
D.4Biological Resources
D.5Cultural and Paleontological Resources
D.6Greenhouse Gases
D.7Public Health and Safety
D.8Fire and Fuels Management
D.9Hydrology and Water Quality
D.10Land Use and Planning
D.11Noise
D.12Public Services and Utilities
D.13Recreation
D.14Transportation and Traffic
D.15Electromagnetic Fields
E.COMPARISON OF ALTERNATIVES
F.CUMULATIVE SCENARIO AND IMPACTS
G.REQUIRED CEQA/NEPA TOPICS
H.MITIGATION MONITORING, COMPLIANCE, AND REPORTING PROGRAM
I.PUBLIC PARTICIPATION
J.DISTRIBUTION OF DEIR/DEIS
K.REPORT PREPARATION
L.INDEX

Volume 1, Part 2 – Appendices

BIO-1Supplementary Special-Status Plants
BIO-2Special-Status Plant Species Potential to Occur in Project Study Area
BIO-3Supplementary Special-Status Wildlife
BIO-4Special-Status Wildlife Species Potential to Occur in Project Study Area
BIO-5LMP Consistency Evaluation
BIO-6Special-Status Plant and Wildlife Species Documented Status along Lines not part of the Power Line Replacement Project to be covered under the MSUP
BIO-7Biological Evaluation/Biological Assessment Example
CUL-1Power Line Replacement Projects Archaeological Resources (Confidential)
J-1Distribution List for the Draft EIR/EIS
J-2Distribution List for the Draft EIR/EIS
LU-1ARegional Policies, Plans, and Regulations
LU-1BLand Use Consistency Tables

Volume 2 – Responses to Comments

Contents
Cover
Title Page
1INTRODUCTION TO VOLUME 2, RESPONSES TO COMMENTS
2LIST OF COMMENTERS AND RESPONSES
3COMMENT LETTERS AND RESPONSES