Files linked on this page are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC. Note: For best results in displaying the largest files (see sizes shown in parentheses below for files larger than 3.0 MB), right-click the file's link, click "Save Target As" to download the file to a folder on your hard drive, then browse to that folder and double-click the downloaded file to open it in Acrobat
Welcome to the California Public Utilities Commission (CPUC) website for the California Environmental Quality Act (CEQA) review of proposed construction of the Eldorado to Ivanpah Transmission Line Upgrade Project (Ivanpah). An application for this project was submitted to the CPUC on May 28, 2009 (Application A.09-05-027).This site provides access to public documents and information relevant to the CEQA review process.

Background  

Southern California Edison (SCE) has filed an application with the CPUC to construct Ivanpah. The CPUC is the CEQA lead agency and the BLM is the NEPA lead agency.

Ivanpah, as proposed by SCE, includes transmission upgrades to interconnect renewable energy projects, including the DPT1 Solar Project, in the Mojave Desert area spanning the California/Nevada border.

The Ivanpah Project’s major components include the following:

  • Construction a new Ivanpah substation in San Bernardino County, California;
  • Removal of 36 miles of 115 kV lines and replacement with 220 kV lines for the Eldorado portion of the existing line;
  • Replacement of an existing transformer at the El Dorado station in Clark County, Nevada;
  • Installation of associated telecommunication infrastructure; and
  • Upgrades to ensure system protection and reliability.

Figure 1: Proposed Route and Alternatives shows an overview of the Project.

Application and Proponent’s Environmental Assessment (PEA)

The PEA was submitted May 28, 2009 and is available here.

Other Documents Available

The Notice of Intent, Scoping Report, Addendum to the Scoping Report, Notice of Availability, and Initial Study will be published here, when available.

Environmental Impact Report (EIR)


Draft EIR/EIS
The Draft Environmental Impact Report/Environmental Impact Statement will be published here, when available.

Final EIR
The Final Environmental Impact Report/Environmental Impact Statement will be published here, when available.

Commission Decision (If applicable)

Construction Progress and Mitigation Monitoring

Reports issued by the CPUC, reports on construction progress, and reports issued at part of the Mitigation Monitoring Program will be published here, when available.

For Additional Information

The CPUC, through its Environmental Review Team, is conducting an environmental review of the project. To request additional information or to be added to the mailing list, please contact us by email, fax, or phone, as follows:

Project email: Ivanpah@ene.com
Project voicemail: 877-478-4686
Project fax: (415) 981-0101


The CPUC’s Project Manager is:

Tom Flynn, CPUC Energy Division California
Public Utilities Commission
770 L Street, Suite 1050
Sacramento, CA 95814
Tel. (415) 703-1637


The BLM’s Project Manager is:

Tom Hurshman
Right-of-Way Project Manager
Bureau of Land Management
Phone: 970-240-5345
Fax: 970-240-5368
    Web Info

This page is best viewed with Mozilla Firefox or Internet Explorer. Please report any problems to the Energy Division web coordinator.

     
Project Home Page - CPUC Environmental Information - CPUC Home