PDF:
Files linked on this page are in Portable Document Format (PDF). To view them, you will need to
download the free Adobe Acrobat Reader
if it is not already installed on your PC.
LARGE FILES:
Files 3 MB or larger have sizes shown in parentheses. For best results when displaying large files,
right-click the link and click "Save Target As". This will download the file to your computer.
Browse to the save location and double-click the file to open it in Acrobat.
STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION
Southern California Edison
Mesa 500-kV Substation Project
(Application No. A.15-03-003)
Last Update: Ocotber 12, 2017
Si usted necesita más información en español, por favor, llame al (855) 520-6799, o presione aquí.
Mitigation Monitoring Plans
Landscape and Aesthetic Treatment Plan (pending)
Graffiti Prevention and Abatement Plan
Habitat Restoration and Mitigation Plan (includes Southern California Black Walnut Restoration Plan) (pending)
Noxious and Invasive Weed Control Plan
Worker Environmental Awareness Program
Nesting Bird Management Plan
Avian Protection Plan
Paleontological Resources Management Plan
Cultural Resources Management Plan
Contaminated Soil Contingency Plan
Well Management Plan
Noise Control Plan
Traffic Control Plan