STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION

Pacific Gas and Electric Company's North San Jose Capacity Project Environmental Review

TABLE OF CONTENTS

Download to view documents in Portable Document Format (PDF). Text files are viewable as either htm or pdf files. The pdf files show the documents in their entirety including tables and figures and can be downloaded. Figures are saved as gif files and range from 19k to 235k files. Set your browser to white background to view figures.

The Mitigated Negative Declaration (85K) and the Initial Study separated into the Project Description (425K) and the Environmental Checklist (190K)can be downloaded in their entirety. For viewing purposes, the Initial Study has been separated into sections, according to the Table of Contents below. Comments on the Draft Mitigated Negative Declaration and Responses to Comments and the Mitigation Monitoring Program can be downloaded here.

ENVIRONMENTAL CHECKLIST (24K)

I. Land Use and Planning (9K)
II. Population and Housing (4K)
III. Geologic Problems (16K)
IV. Water (16K)
V. Air Quality (9K)
VI. Transportation / Circulation (11K)
VII. Biological Resources (5K)
VIII. Energy and Mineral Resources (3K)
IX. Hazards (16K)
X. Noise (6K)
XI. Public Services (7K)
XII. Utilities and Service Systems (6K)
XIII. Aesthetics (9K)
XIV. Cultural Resources (3K)
XV. Recreation (2K)
XVI. Mandatory Findings of Significance (8K)

REFERENCES (9K)

  
TOP North San Jose Capacity Project Main Page PG&E Substation Projects Main Page CPUC Home Page