56.2    Use.

 

Where mechanical loads imposed on poles, towers or structures are greater than can be safely supported, additional strength shall be provided by the use or other suitable construction.  Where necessary, guys shall be used wherever conductor stresses are unbalanced, as at dead-ends or angles.

 

Where guys are used with poles or similar structures capable of considerable deflection before failure, they shall be able to support the entire stress, the pole below the point of guy attachment acting merely as a strut.

 