General Order 95
   
 Appendix G
   
Typical Illustrative Diagrams of Rules
These diagrams illustrate the requirements of certain 
 rules and are to be used as a guide only for the application of such rules. 
 Under no conditions shall these diagrams be given precedence over the rules 
 as written.
   
     
| Figure No. | Subject | 
| Conflicting Lines | |
| Co–linear Lines (Overbuilds) | |
| Co–linear Lines | |
| Sag–Normal and Apparent | |
| Clearance of Wires above Railroad Tracks, Highways, etc. | |
| Clearance of Wires at Point of Crossing | |
| Vertical Separation of Wires on Different Crossarms of the Same Pole | |
| Vertical Separation–Cables and Racks–Joint Poles | |
| Vertical Separation–Line and Buck Arms Construction | |
| Vertical Separation–Combination Line and Buck Arm Construction | |
| Horizontal Conductor Spacing | |
| Deleted by Resolution E–3076 on March 9, 1988 | |
| Incorporated into Text by Resolution SU–5 on May 22, 1990 | |
| Incorporated into Text by Resolution SU–40 on October 9, 1996 | |
| Incorporated into Text by Resolution SU–6 on November 21, 1990. 1 G-16 | |
| Climbing Space–Communication Conductors on Line Arms and Buck Arms | |
| Climbing Space–Communication Conductors Not on Crossarms | |
| Climbing Space–Communication Service Drops Not on Crossarms | |
| Supply Service Drops 0 - 750 Volts on Clearance Arms and Attachments | |
| Supply Service Drops 0 - 750 Volts on Pole Top Extensions Crossing Class “C” Line | |
| Supply Service Drop Clearance from Messenger Supported Conductors | |
| Incorporated into Text by Resolution SU–40 on October 9, 1996 | |
| Exposed Communication Guys | |
| Guys in Proximity to Poles and Conductors of 35,500 Volts or Less | |
| Incorporated into Text by Resolution SU–10 on January 21, 1992 | |
| Guy Sectionalizing - Communication Lines 1 G–27 | |
| Guy Sectionalizing - Jointly Poles | |
| Guy Sectionalizing - Anchor Guys | |
| Incorporated into Text by Resolution SU–10 on January 21, 1992 | |
| Guy Sectionalizing - Sidewalk and Truss Guys | |
| Guys Exposed to Supply Conductors of More Than 22,500 Volts or in Proximity to Supply Conductors More Than 35,500 Volts | |
| Incorporated into Text by Resolution SU–10 on January 21, 1992 | |
| Incorporated into Text by Resolution SU–25 on January 19, 1994 | |
| Delted by Resolution SU–25 on January 19, 1994 | |
| Incorporated into Text by Resolution SU–40 on October 9, 1996. | |
| Incorporated into Text by Resolution SU–25 on January 19, 1994 | |
| Incorporated into Text by Resolution SU–40 on October 9, 1996. | |
| Incorporated into Text by Resolution SU–10 on January 21, 1992 | |
| Span Wire Insulators for Trolley Conductors | |
| Span Wire Insulators for Trolley Conductors | |
| Span Wire Insulators for Trolley Conductors | |
| Backbone and Pull–off Insulation | |
| Trolley Bracket Insulation | |
| Hardwood Ground Moulding | |
| Plastic U–Shaped Ground Moulding | |
| Deleted by Resolution SU–25 on January 19, 1994 | |
| Clearance of Wires and Equipment on Poles | |
| Incorporated into Text by Resolution SU–6 on November 21, 1990 | |
| Guying Terms | |
| Quadrant or Side of Pole for Uncovered Runs or Risers | |
| Incorporated into Text by Resolution SU–6 on November 21, 1990 |