Original General Order 95
Appendix 
G
Typical Illustrative Diagrams of 
Rules
| Conflicting Lines | |
| Co-linear Lines (Overbuilds) | |
| Co-linear Lines | |
| Sag—Normal or Apparent | |
| Sag—Apparent | |
| Clearance of Wires above Ground, Etc | |
| Clearance of Wires at Point of Crossing | |
| Vertical Separation of Wires on Different Crossarms | |
| Vertical Separation--Racks and Cables | |
| Conductor Separation--Line and Buck Arms | |
| Conductor Separation--Combination Line and Buck Arms | |
| Conductor Pin Spacing and Pole Clearance | |
| Horizontal Dead Ends 0-7500 V | |
| Horizontal Dead En8s More Than 7500 V | |
| Climbing Space--Vertical Dead Ends | |
| Climbing Space--Line Arms Only | |
| Climbing Space--Line and Buck Arms 0-750 V | |
| Climbing Space--Line and Buck Arms 750-20,000 V | |
| Climbing Space--Combination Arms 0-750 V Quadrant | |
| Climbing Space--Combination Arms 750-7500 V Quadrant | |
| Climbing Space--Combination Arms 2 feet spacing | |
| Climbing Space--Low Voltage Racks | |
| Low Voltage Rack Under Transformer | |
| Climbing Space--Communication Line Arms | |
| Climbing Space--Communication Line and Buck Arms | |
| Climbing Space--Communication Not on Crossarms | |
| Climbing Space--Communication Service Drops | |
| Supply Service Drops on Clearance Arms | |
| Supply Service Drops on Pole Top Extensions | |
| Supply Service Drop Clearance from Cables | |
| Supply Service Drops From Guarded Racks | |
| Exposed Communication Guys | |
| Guys in Proximity | |
| Guy Sectionalizing--Supply Lines | |
| Guy Sectionalizing--Communication Lines | |
| Guy Sectionalizing-Joint Poles | |
| Guy Sectionalizing--Anchor Guys | |
| Guy Sectionalizing--Arm and Branch Guys | |
| Guy Sectionalizing--Sidewalk and Truss Guys | |
| Guys Exposed to Supply of More Than 20,000 Volts | |
| Location of Supply Cables | |
| Traffic Signal Installations | |
| Street Light Installations | |
| Grounding of Transformer Windings | |
| Rack Conductor Clearances from Pole | |
| Risers Covering and Terminal Clearance | |
| Trolley Spans of 100 Feet or Less | |
| Trolley Spans Exceeding 100 Feet | |
| Trolley Lines Under Bridges | |
| Broken Trolley Suspensions | |
| Broken Trolley Fastening | |
| Feeder Span Wire Insulation | |
| Span Wire Insulation | |
| Feeder Span Wire Insulation | |
| Backbone Insulation | |
| Trolley Bracket Insulation | |
| Hardwood Ground Moulding | |
| Pipe or Cable Covering | |
| Clearance of Wires and Equipment | |
| Pole Clearance--Communication Wires | |
| Guying Terms | |
| Quadrant or Side of Pole for Uncovered Runs or Risers |