Notice of Availability
VOLUME I
Title Page
|
| |
| Executive Summary |
| ES.1 Introduction / Background |
| ES.2 Alternatives |
| ES.3 Environmental Impacts and Mitigation
Measures |
| ES.4 Summary Comparison of the Proposed
Project and Alternatives |
| ES.5 Impact Summary Tables |
| Fig.
ES-1 Project Location |
| Fig.
ES-2 SONGS Site Plan |
| Fig.
ES-3 Photographs of SONGS 2 and 3 |
| |
| A.
Introduction |
| A.1 Overview and History of SONGS |
| A.2 Purpose and Need |
| A.3 Coordination of Industry Resources |
| A.4 Nuclear Regulatory Commission |
| A.5 CPUC Jurisdiction |
| A.6 Agency Use of this Document |
| A.7 Reader's Guide to This EIR |
| A.8 References |
| Fig. A-1 Typical
Nuclear Power Plant Steam Supply System |
| |
| B.
Project Description |
| B.1 Overview of Proposed Project |
| B.2 Project Background |
| B.3 Project Components |
| B.4 Decommissioning |
| B.5 Applicant-Proposed Measures |
| B.6 References |
| Fig. B-1
Project Location |
| Fig. B-2
SONGS Site Plan |
| Fig. B-3
Photographs of SONGS 2 and 3 |
| Fig. B-4
Original Steam Generator - Dimensions and Operating Parameters
|
| Fig. B-5
Del Mar Boat Basin RSG Offloading Location |
| Fig.
B-6a Proposed RSG Transport Route (5.8 MB) |
| Fig.
B-6b Proposed RSG Transport Route (6.8 MB) |
| Fig.
B-6c Proposed RSG Transport Route (6.4 MB) |
| Fig.
B-6d Proposed RSG Transport Route (6.4 MB) |
| Fig. B-7
Conceptual Mat Placement for Two Inches of Water Flow |
| Fig. B-8
Conceptual Mat Placement for Four Inches of Water Flow |
| |
| C.
Alternatives |
| C.1 Applicant-Proposed Options |
| C.2 Alternatives Development and Screening
Process |
| C.3 Alternatives Screening Methodology
|
| C.4 Alternatives Evaluated in this EIR
|
| C.5 Alternatives Eliminated from Full
EIR Evaluation |
| C.6 No Project Alternative |
| C.7 References |
| Fig.
C-1a Alternative Transport Routes (5.9 MB) |
| Fig.
C-1b Alternative Transport Routes (6.9 MB) |
| Fig.
C-1c Alternative Transport Routes (6.6 MB) |
| Fig.
C-1d Alternative Transport Routes (6.4 MB) |
| Fig. C-2
Conceptual Drawing of Transport Over the Santa Margarita Bridge
|
| Fig. C-3
Possible Onsite OSG Storage Facility Locations |
| Fig. C-4
Locations Associated with Alternatives Eliminated |
| Fig. C-5
Natural Gas Pipeline Infrastructure in Southern California |
| Fig. C-6
Transmission Infrastructure in Southern California |
| |
| D.1
Introduction to Environmental Analysis |
| |
| D.2
Air Quality |
| |
| D.3
Biological Resources |
| Fig.
D.3-1 Proposed Project and Alternative Transport Routes Photo
Locations |
| Fig.
D.3-2 Photographs - Boat Basin and Bulkhead |
| Fig.
D.3-3 Photographs - Segment A (Camp Del Mar / Beach Transition) |
| Fig.
D.3-4 Photographs - Segment B (Santa Margarita River Estuary
and Nesting Habitat) |
| Fig.
D.3-5 Photographs - Segment C (Beach Military Road) |
| Fig.
D.3-6 Photographs - Segment D (Red Beach / Dirt Road Transition) |
| Fig.
D.3-7 Photographs - Segment E (Dirt Road Parallel to I-5) |
| Fig.
D.3-8 Photographs - Segment F (Dirt Road and I-5
Transition) |
| Fig.
D.3-9 Photographs - Segment G (Dirt Road / Old Highway 101) |
| Fig.
D.3-10 Photographs - Segment H (Dirt Road / Old Highway 101
Transition "Y" Turn) |
| |
| D.4 Cultural
Resources |
| |
| D.5
Geology, Soils, and Paleontology |
| Fig.
D.5-1 SONGS Local Geology |
| Fig.
D.5-2 Aerial Infrared Photograph Showing Existing Landslides
along San Onofre Bluffs |
| |
| D.6
Hazardous Materials |
| |
| D.7
Hydrology and Water Quality |
| Fig.
D.7-1 Map of Waterways in the Project Vicinity |
| |
| D.8
Land Use, Recreation, and Military Operations |
| Fig.
D.8-1 Notable Land Uses in the Vicinity of the Proposed Project
|
| |
| D.9
Noise and Vibration |
| Fig.
D.9-1 Typical Range of Common Sounds Heard in the Environment |
| |
| D.10
Public Services and Utilities |
| |
| D.11
Socioeconomics |
| |
| D.12
System and Transportation Safety |
| Fig.
D.12-1 SONGS Emergency Planning Zone Map |
| Fig. D.12-2 Sources of Radiation
Exposure (figure embedded in text) |
| |
| D.13
Traffic and Circulation |
| Fig.
D.13-1 Project Area Roadway System |
| |
| D.14
Visual Resources |
| Fig.
D.14-1 Landscape Units, and KOPs within the Proposed Project's
Viewshed |
| Fig.
D.14-2 Landscape Unit 1: Coastal Marine Terrace, Bluffs, and
Beaches |
| Fig.
D.14-3 KOP 1: San Onofre State Beach |
| Fig.
D.14-4 KOP 2: Interstate 5 Vista Point; MCBCP Facilities within
Landscape Unit 1 |
| Fig.
D.14-5 Landscape Unit 2: Santa Margarita Mountains; Landscape
Unit 3: Santa Margarita River |
| Fig.
D.14-6 KOP 3: Camp Del Mar |
| Fig.
D.14-7 KOP 4: Interstate 5 |
| Fig.
D.14-8 KOP 5: SONGS Site and Facilities |
| Fig.
D.14-9 KOP 4: Interstate 5 / Las Pulgas Road Transition |
| Fig.
D.14-10 KOP 1: San Onofre State Beach / Landscape Beds |
| Fig.
D.14-11 KOP 4: Interstate 5 / Segments L, N, Q, R |
| |
| E.
Comparison of Alternatives |
| E.1 Comparison Methodology |
| E.2 Environmentally Superior Alternative |
| E.3 No Project Alternative vs. the Environmentally
Superior Alternative |
| |
| F.
Other CEQA Considerations |
| F.1 Growth Inducing Effects |
| F.2 Significant Irreversible Changes |
| F.3 Cumulative Scenario |
| F.4 Cumulative Impact Analysis |
| F.5 References |
| |
| G.
NRC License Renewal |
| G.1 SCE's Position on NRC License Renewal |
| G.2 NRC Licensing Process |
| G.3 Status of License Renewal Applications |
| G.4 Issues Relevant to SONGS 2 & 3 License
Renewal |
| G.5 References |
| |
| H.
Mitigation Monitoring and Reporting |
| H.1 Introduction to MMCRP |
| H.2 Roles and Responsibilities |
| H.3 General Monitoring Procedures |
| H.4 Mitigation Compliance Plan |
| H.5 Condition Effectiveness Review |
| H.6 Mitigation Monitoring Program Tables |
| |
| I.
Public Participation |
| I.1 EIR Scoping Process |
| I.2 Public Notification |
| I.3 Final EIR Release |
| |
| J.
Report Preparation |
| J.1 EIR Preparers |
| J.2 EIR Information Contacts |
| J.3 List of Definitions and Acronyms |
| |
| Appendices |
| Appendix 1. Notice
of Preparation |
| Appendix 2.
Biological Resources |
| Appendix 3.
Cultural Resources |
| Appendix
4. Summary of Pertinent Federal Regulations |
| |
VOLUME II
Title Page |
| |
| Introduction
to Volume II |
| Table 1. Commenters and Comment Set Numbers |
| Master Responses to Major Comments |
| Master Response MR-1: Baseline |
| Master Response MR-2: NRC License Renewal |
| Master Response MR-3: NRC vs. CPUC Jurisdiction |
| |
| Comments and Responses to Comments |
| Comments Received from Public
Agencies |
| Comment Set A - State of California, Department of Transportation
(Caltrans District 12) |
| Comment Set B - U.S. Marine Corps Base Camp Pendleton |
| Comment Set C - County of Orange, Resources & Development Management
Department |
| Comment Set D - State of California, Department of Transportation
(Caltrans District 11) |
| Comment Set E - California Coastal Commission |
| Comment Set F - City of San Clemente Planning Division |
| Comment Set G - State of California, Department of Fish and Game |
| Comment Set H - Native American Heritage Commission |
| Comment Set I - State of California, Department of Parks and Recreation,
Orange Coast District |
| |
| Comments Received
from Organizations and Companies |
| Comment Set CC1 - Physicians for Social Responsibility |
| Comment Set CC2 - The Utility Reform Network (TURN) |
| Comment Set CC3 - Los Osos Community Advisory Council |
| Comment Set CC4 - Alliance
for Nuclear Responsibility |
| Comment Set CC5 - California
Earth Corps |
| Comment Set CC6 - CREED |
| |
| Comments Received at Public Workshops |
| Comment Set
PM1 - Public Workshop, 2:00 p.m. May 12, 2005 |
| Comment Set
PM2 - Public Workshop, 7:00 p.m. May 12, 2005 |
| |
| Comments Received from Private Individuals |
| Comment Sets 1-4 |
| Comment Sets 5-9 |
| Comment Sets 10-12 |
| Comment Sets 13-15 |
| Comment Set 16: Part 1
Part 2
Part 3
Part 4
Part 5 (responses)
|
| Comment Sets 17-20 |
| |
| Comments Received from the Applicant (Southern California Edison) |
| Comment Set SCE: Part 1
Part 2 Part 3
Part 4 Part 5 (responses)
|