|   Notice of Availability | 
        
         
            | 
        
 
            
             Abstract | 
        
         
            | 
        
 
          |  Executive 
            Summary | 
        
 
          |   | 
           
             ES.1. Introduction/Background 
              ES.2. Summary Description of Proposed Project and Project Alternatives 
              ES.3. Summary of Impacts and Mitigation Measures 
              ES.4. Summary Comparison of Alternatives 
              Figure ES-1. Regional Location 
              Map (10.2 MB) 
              Figure ES-2. Antelope-Pardee 
              500-kV Proposed and Alternative Routes
               
            | 
        
 
            | 
        
 
          | A. | 
          Introduction | 
        
 
          |   | 
          A.1. Background 
            A.2. Proposed Project/Action and Alternatives 
            A.3. Purpose and Need 
            A.4. The Antelope Transmission Project 
            A.5. Agency Use of this Document 
            A.6. Overview of the Environmental Review Process 
            A.7. Reader's Guide to this Document | 
        
 
            | 
        
 
          | B. | 
          Description 
            of Proposed Project/Action and Alternatives | 
        
 
          |   | 
          B.1. Introduction 
            B.2. Description of the Proposed Project/Action 
            B.3. Project Alternatives Screening Overview 
            B.4. Alternatives Descriptions 
            B.5. Cumulative Impacts Scenario 
            Figure B.2-1. Regional Location 
            Map 
            Figure B.2-2a. Proposed Project 
            (Map 1 of 5) 
            Figure B.2-2b. Proposed Project 
            (Map 2 of 5) 
            Figure B.2-2c. Proposed Project 
            (Map 3 of 5) 
            Figure B.2-2d. Proposed Project 
            (Map 4 of 5) 
            Figure B.2-2e. Proposed Project 
            (Map 5 of 5) 
            Figure B.2-3. Example of 220-kV 
            Double-circuit Tubular Steel Pole (Mile 0 to Mile 0.1) 
            Figure B.2-4. Typical 500-kV 
            Single-circuit Tower 
            Figure B.2-5. Typical 500-kV 
            Double-circuit Tower 
            Figure B.2-6. Proposed New ROW 
            Configuration for Proposed Project Mile 0 to Mile 0.1 
            Figure B.2-7. Proposed New ROW 
            Configuration for Proposed Project Mile 0.1 to Mile 1.1 
            Figure B.2-8. Existing and Proposed 
            ROW Configuration for Proposed Project Mile 1.1 to Mile 5.7 
            Figure B.2-9. Existing and Proposed 
            ROW Configuration for Proposed Project Mile 5.7 to Mile 18.6 
            Figure B.2-10. Proposed New 
            ROW Configuration for Proposed Project Mile 18.6 to Mile 20.3 
            Figure B.2-11. Existing and 
            Proposed ROW Configuration for Proposed Project Mile 20.3 to Mile 
            22.3 
            Figure B.2-12. Existing and 
            Proposed ROW Configuration for Proposed Project Mile 22.3 to Mile 
            25.6 
            Figure B.2-13. Antelope Substation 
            with Proposed Project Modifications 
            Figure B.2-14. Pardee Substation 
            with Proposed Project Modifications 
            Figure B.2-15. Typical Guard 
            Structure 
            Figure B.4-1a. Alternative 
            1: Underground Segment in the ANF 
            Figure B.4-1b. Alternative 
            1: Underground Segment in Santa Clarita 
            Figure B.4-2. Typical Solid 
            Dielectric Cable Cross-Section. 
            Figure B.4-3. Plan View of Underground 
            Transmission in the ANF 
            Figure B.4-4. Underground Transmission 
            Cross-section in the ANF (3.8 MB) 
            Figure B.4-5. Underground Transmission 
            Along Forest Service Access Road 
            Figure B.4-6. Underground Transmission 
            Cross-section in Streets 
            Figure B.4-7. Plan View of Underground 
            Transmission in Streets 
            Figure B.4-8. Prototypical Transition 
            Station 
            Figure B.4-9. Alternative 2 
            Alignment 
            Figure B.4-10. Alternative 3 
            Proposed ROW Configuration for Mile 20.3 and Mile 22.3 
            Figure B.4-11. Alternative 3 
            Proposed ROW Configuration for Mile 22.3 and Mile 25.6 
            Figure B.4-12. Alternative 4: 
            Haskell Canyon Re-Route 
            Figure B.4-13. Alternative 5 
            Alignment 
            Figure B.5-1a. Cumulative 
            Projects (Northern Section) 
            Figure B.5-1b. Cumulative 
            Projects (Southern Section) (2nd page) | 
        
 
            | 
        
 
          | C. | 
          Environmental Analysis | 
        
 
            | 
        
 
          | C.1 | 
          Introduction 
            to Environmental Analysis | 
        
 
          |   | 
          C.1.1. Section Content and 
            Organization 
            C.1.2. Environmental Analysis Methodology 
            C.1.3. Significance Categories  | 
        
 
            | 
        
 
          | C.2 | 
          Air 
            Quality | 
        
 
          |   | 
          C.2.1. Affected Environment 
            C.2.2. Regulatory Framework 
            C.2.3. Significance Criteria 
            C.2.4. Applicant-Proposed Measures 
            C.2.5. Impact Analysis: Proposed Project/Action 
            C.2.6. Alternative 1: Partial Undergrounding of Antelope-Pardee Transmission 
            Line 
            C.2.7. Alternative 2: Antelope-Pardee East Mid-Slope 
            C.2.8. Alternative 3: Antelope-Pardee Single-Circuit 500-kV Towers 
            between Haskell Canyon and Pardee Substation 
            C.2.9. Alternative 4: Antelope-Pardee Re-Routing of New Right-of-Way 
            along Haskell Canyon 
            C.2.10. Alternative 5: Antelope-Pardee Sierra Pelona Reroute 
            C.2.11. No Project/Action Alternative 
            C.2.12. Impact and Mitigation Summary 
            C.2.13. Cumulative Effects 
            Figure C.2-1. Air Basin/Air 
            District Jurisdiction Map in Project Area 
            Figure C.2-2. Normalized Maximum Short-term Historical Air Pollutant 
            Concentrations in Lancaster (figure embedded in text) 
            Figure C.2-3. Normalized Maximum Short-term Historical Air Pollutant 
            Concentrations in Santa Clarita (figure embedded in text) 
            Figure C.2-4. Normalized Ozone Air Quality Maximum Concentrations 
            (1985-2004) (figure embedded in text) 
            Figure C.2-5. Ozone: Number of Days Exceeding the CAAQS for 1-Hr and 
            NAAQS for 8-Hr (1985-2004) (figure embedded in text) 
            Figure C.2-6. Normalized PM10 Air Quality Maximum Concentrations (1989-2004) 
            (figure embedded in text) 
            Figure C.2-7. PM10 24-Hour - Number of Days Exceeding the CAAQS (1989-2004) 
            (figure embedded in text) | 
        
 
            | 
        
 
          | C.3 | 
          Biological 
            Resources | 
        
 
          |   | 
          C.3.1. Affected Environment 
            C.3.2. Regulatory Framework 
            C.3.3. Significance Criteria 
            C.3.4. Applicant-Proposed Measures 
            C.3.5. Impact Analysis: Proposed Project/Action 
            C.3.6. Alternative 1: Partial Undergrounding of Antelope-Pardee Transmission 
            Line 
            C.3.7. Alternative 2: Antelope-Pardee East Mid-Slope 
            C.3.8. Alternative 3: Antelope-Pardee Single-Circuit 500-kV Towers 
            between Haskell Canyon and Pardee Substation 
            C.3.9. Alternative 4: Antelope-Pardee Rerouting of New Right-of-way 
            along Haskell Canyon 
            C.3.10. Alternative 5: Antelope-Pardee Sierra Pelona Reroute 
            C.3.11. No Project/Action Alternative 
            C.3.12. Impact and Mitigation Summary 
            C.3.13. Cumulative Effects 
            Figure C.3-1A. Vegetation 
            Communities (proposed line Mile 0-9) 
            Figure C.3-1B. Vegetation 
            Communities (proposed line Mile 9-17) 
            Figure C.3-1C. Vegetation 
            Communities (proposed line Mile 16-25.59) 
            Figure C.3-2. Proposed Alignment 
            Photographs 
            Figure C.3-3. Proposed Alignment 
            Photographs 
            Figure C.3-4. Proposed Alignment 
            Photographs 
            Figure C.3-7A. Vegetation 
            Communities Map Alternative 2 and the Proposed Route 
            Figure C.3-7B. Vegetation 
            Communities Map Alternatives 2, 4, 5 and the Proposed Route 
            Figure C.3-10A. Vegetation 
            Communities Map Alternative 5 and the Proposed Route 
            Figure C.3-10B. Vegetation 
            Communities Map Alternative 5 
            Figure C.3-10C. Vegetation 
            Communities Map Alternative 5 
            Figure C.3-10D. Vegetation 
            Communities Map Alternatives 1, 2, 4, 5, and the Proposed Route | 
        
 
            | 
        
 
          | C.4 | 
          Cultural 
            Resources | 
        
 
          |   | 
          C.4.1. Affected Environment 
            C.4.2. Regulatory Framework 
            C.4.3. Significance Criteria 
            C.4.4. Applicant-Proposed Measures 
            C.4.5. Impact Analysis: Proposed Project/Action 
            C.4.6. Alternative 1: Partial Undergrounding of Antelope-Pardee Transmission 
            Line 
            C.4.7. Alternative 2: Antelope-Pardee East Mid-Slope 
            C.4.8. Alternative 3: Antelope-Pardee Single-Circuit 500-kV Towers 
            between Haskell Canyon and Pardee Substation 
            C.4.9. Alternative 4: Antelope-Pardee Rerouting of New Right-of-way 
            along Haskell Canyon 
            C.4.10. Alternative 5: Antelope-Pardee Sierra Pelona Reroute 
            C.4.11. No Project/Action Alternative 
            C.4.12. Impact and Mitigation Summary 
            C.4.13. Cumulative Effects | 
        
 
            | 
        
 
          | C.5 | 
          Geology, 
            Soils, and Paleontology | 
        
 
          |   | 
          C.5.1. Affected Environment 
            C.5.2. Regulatory Framework 
            C.5.3. Significance Criteria 
            C.5.4. Applicant-Proposed Measures 
            C.5.5. Impact Analysis: Proposed Project/Action 
            C.5.6. Alternative 1: Partial Undergrounding of Antelope-Pardee Transmission 
            Line 
            C.5.7. Alternative 2: Antelope-Pardee East Mid-Slope 
            C.5.8. Alternative 3: Antelope-Pardee Single-Circuit 500-kV Towers 
            between Haskell Canyon and Pardee Substation 
            C.5.9. Alternative 4: Antelope-Pardee Rerouting of New Right-of-way 
            along Haskell Canyon 
            C.5.10. Alternative 5: Antelope-Pardee Sierra Pelona Reroute 
            C.5.11. No Project/Action Alternative 
            C.5.12. Impact and Mitigation Summary 
            C.5.13. Cumulative Effects 
            Figure C.5-1. Regional Geologic 
            Map 
            Figure C.5-2. Regional Faults 
            and Historic Earthquakes 
            Figure C.5-3. Regional Earthquake 
            Fault Zones | 
        
 
            | 
        
 
          | C.6 | 
          Public 
            Health and Safety | 
        
 
          |   | 
          C.6.1. Affected Environment 
            C.6.2. Regulatory Framework 
            C.6.3. Significance Criteria 
            C.6.4. Applicant-Proposed Measures 
            C.6.5. Impact Analysis: Proposed Project/Action 
            C.6.6. Alternative 1: Partial Undergrounding of Antelope-Pardee Transmission 
            Line 
            C.6.7. Alternative 2: Antelope-Pardee East Mid-Slope 
            C.6.8. Alternative 3: Antelope-Pardee Single-Circuit 500-kV Towers 
            between Haskell Canyon and Pardee Substation 
            C.6.9. Alternative 4: Antelope-Pardee Rerouting of New Right-of-way 
            along Haskell Canyon 
            C.6.10. Alternative 5: Antelope-Pardee Sierra Pelona Reroute 
            C.6.11. No Project/Action Alternative 
            C.6.12. Impact and Mitigation Summary 
            C.6.13. Cumulative Effects 
            Figure C.6-1. Mile 0 to Mile 5.7 (Area 1) Calculated Magnetic Field 
            Levels for Existing and Proposed Project Scenarios (figure embedded 
            in text) 
            Figure C.6-2. Mile 5.7 to Mile 18.6 (Area 2) Calculated Magnetic Field 
            Levels for Existing and Proposed Project Scenarios (figure embedded 
            in text) 
            Figure C.6-3. Mile 18.6 to Mile 20.3 (Area 3) Calculated Magnetic 
            Field Levels for Proposed Project Scenario (figure embedded in text) 
            Figure C.6-4. Mile 20.3 to Mile 22.3 (Area 4) Calculated Magnetic 
            Field Levels for Existing and Proposed Project Scenarios (figure embedded 
            in text) 
            Figure C.6-5. Mile 22.3 to Mile 25.6 (Area 5) Calculated Magnetic 
            Field Levels for Existing and Proposed Project Scenarios (figure embedded 
            in text) | 
        
 
            | 
        
 
          | C.7 | 
          Forest 
            Management Activities | 
        
 
          |   | 
          C.7.1. Affected Environment 
            C.7.2. Regulatory Framework 
            C.7.3. Significance Criteria 
            C.7.4. Applicant-Proposed Measures 
            C.7.5. Impact Analysis: Proposed Project/Action 
            C.7.6. Alternative 1: Partial Undergrounding of Antelope-Pardee Transmission 
            Line 
            C.7.7. Alternative 2: Antelope-Pardee East Mid-Slope 
            C.7.8. Alternative 3: Antelope-Pardee Single-Circuit 500-kV Towers 
            between Haskell Canyon and Pardee Substation 
            C.7.9. Alternative 4: Antelope-Pardee Rerouting of New Right-of-way 
            along Haskell Canyon 
            C.7.10. Alternative 5: Antelope-Pardee Sierra Pelona Reroute 
            C.7.11. No Project/Action Alternative 
            C.7.12. Impact and Mitigation Summary 
            C.7.13. Cumulative Effects 
            Figure C.7-1. Fire History 
            Map 
            Figure C.7-2. Fuelbreak Map | 
        
 
            | 
        
 
          | C.8 | 
          Hydrology 
            and Water Quality | 
        
 
          |   | 
          C.8.1. Affected Environment 
            C.8.2. Regulatory Framework 
            C.8.3. Significance Criteria 
            C.8.4. Applicant-Proposed Measures 
            C.8.5. Impact Analysis: Proposed Project/Action 
            C.8.6. Alternative 1: Partial Undergrounding of Antelope-Pardee Transmission 
            Line 
            C.8.7. Alternative 2: Antelope-Pardee East Mid-Slope 
            C.8.8. Alternative 3: Antelope-Pardee Single-Circuit 500-kV Towers 
            between Haskell Canyon and Pardee Substation 
            C.8.9. Alternative 4: Antelope-Pardee Rerouting of New Right-of-way 
            along Haskell Canyon 
            C.8.10. Alternative 5: Antelope-Pardee Sierra Pelona Reroute 
            C.8.11. No Project/Action Alternative 
            C.8.12. Impact and Mitigation Summary 
            C.8.13. Cumulative Effects 
            Figure C.8-1. Surface Hydrology: 
            Proposed Project 
            Figure C.8-2. FEMA Designed 
            Flood Hazard Areas (100-Year Flood Zones): Proposed Project 
            Figure C.8-3. Groundwater Basins: 
            Proposed Project 
            Figure C.8-4. Hydrologic Sub-Areas 
            for the Proposed Project and Alternatives | 
        
 
            | 
        
 
          | C.9 | 
          Land Use 
            and Public Recreation  | 
        
 
          |   | 
          C.9.1. Affected Environment 
            C.9.2. Regulatory Framework 
            C.9.3. Significance Criteria 
            C.9.4. Applicant-Proposed Measures 
            C.9.5. Impact Analysis: Proposed Project/Action 
            C.9.6. Alternative 1: Partial Undergrounding of Antelope-Pardee Transmission 
            Line 
            C.9.7. Alternative 2: Antelope-Pardee East Mid-Slope 
            C.9.8. Alternative 3: Antelope-Pardee Single-Circuit 500-kV Towers 
            between Haskell Canyon and Pardee Substation 
            C.9.9. Alternative 4: Antelope-Pardee Rerouting of New Right-of-way 
            along Haskell Canyon 
            C.9.10. Alternative 5: Antelope-Pardee Sierra Pelona Reroute 
            C.9.11. No Project/Action Alternative 
            C.9.12. Impact and Mitigation Summary 
            C.9.13. Cumulative Effects 
            Figure C.9-1. Jurisdictions 
            and Notable Land Uses Along Project and Alternative Routes 
            Figure C.9-2. Important Farmland 
            in the North and South Areas 
            Figure C.9-3. Important Farmland 
            in the Leona Valley and Bouquet Canyon Areas | 
        
 
            | 
        
 
          | C.10 | 
          Noise | 
        
 
          |   | 
          C.10.1. Affected Environment 
            C.10.2. Regulatory Framework 
            C.10.3. Significance Criteria 
            C.10.4. Applicant-Proposed Measures 
            C.10.5. Impact Analysis: Proposed Project/Action 
            C.10.6. Alternative 1: Partial Undergrounding of Antelope-Pardee Transmission 
            Line 
            C.10.7. Alternative 2: Antelope-Pardee East Mid-Slope 
            C.10.8. Alternative 3: Antelope-Pardee Single-Circuit 500-kV Towers 
            between Haskell Canyon and Pardee Substation 
            C.10.9. Alternative 4: Antelope-Pardee Rerouting of New Right-of-way 
            along Haskell Canyon 
            C.10.10. Alternative 5: Antelope-Pardee Sierra Pelona Reroute 
            C.10.11. No Project/Action Alternative 
            C.10.12. Impact and Mitigation Summary 
            C.10.13. Cumulative Effects 
            Figure C.10-1. Typical Range 
            of Common Sounds Heard in the Community Noise Environment 
            Figure C.10-2. Typical Noise 
            Levels of Varying Types of Land Use 
            Figure C.10-3a. Noise Sensitive 
            Receptor Locations (Northern Portion) (5.1 MB) 
            Figure C.10-3b. Noise Sensitive 
            Receptor Locations (Southern Portion) 
            Figure C.10-4. Noise Sensitive 
            Receptor Locations for Alternative 1 in the Santa Clarita Area (4.0 MB) 
            Figure C.10-5a. Noise Sensitive 
            Receptor Locations for Alternative 5 (Northern Portion) 
            Figure C.10-5b. Noise Sensitive 
            Receptor Locations for Alternative 5 (Southern Portion) | 
        
 
            | 
        
 
          | C.11 | 
          Public 
            Services | 
        
 
          |   | 
          C.11.1. Affected Environment 
            C.11.2. Regulatory Framework 
            C.11.3. Significance Criteria 
            C.11.4. Applicant-Proposed Measures 
            C.11.5. Impact Analysis: Proposed Project/Action 
            C.11.6. Alternative 1: Partial Undergrounding of Antelope-Pardee Transmission 
            Line 
            C.11.7. Alternative 2: Antelope-Pardee East Mid-Slope 
            C.11.8. Alternative 3: Antelope-Pardee Single-Circuit 500-kV Towers 
            between Haskell Canyon and Pardee Substation 
            C.11.9. Alternative 4: Antelope-Pardee Rerouting of New Right-of-way 
            along Haskell Canyon 
            C.11.10. Alternative 5: Antelope-Pardee Sierra Pelona Reroute 
            C.11.11. No Project/Action Alternative 
            C.11.12. Impact and Mitigation Summary 
            C.11.13. Cumulative Effects | 
        
 
            | 
        
 
          | C.12 | 
          Socioeconomics | 
        
 
          |   | 
          C.12.1. Affected Environment 
            C.12.2. Regulatory Framework 
            C.12.3. Significance Criteria 
            C.12.4. Applicant-Proposed Measures 
            C.12.5. Impact Analysis: Proposed Project/Action 
            C.12.6. Alternative 1: Partial Undergrounding of Antelope-Pardee Transmission 
            Line 
            C.12.7. Alternative 2: Antelope-Pardee East Mid-Slope 
            C.12.8. Alternative 3: Antelope-Pardee Single-Circuit 500-kV Towers 
            between Haskell Canyon and Pardee Substation 
            C.12.9. Alternative 4: Antelope-Pardee Rerouting of New Right-of-way 
            along Haskell Canyon 
            C.12.10. Alternative 5: Antelope-Pardee Sierra Pelona Reroute 
            C.12.11. No Project/Action Alternative 
            C.12.12. Impact and Mitigation Summary 
            C.12.13. Cumulative Effects | 
        
 
            | 
        
 
          | C.13 | 
          Traffic 
            and Transportation | 
        
 
          |   | 
          C.13.1. Affected Environment 
            C.13.2. Regulatory Framework 
            C.13.3. Significance Criteria 
            C.13.4. Applicant-Proposed Measures 
            C.13.5. Impact Analysis: Proposed Project/Action 
            C.13.6. Alternative 1: Partial Undergrounding of Antelope-Pardee Transmission 
            Line 
            C.13.7. Alternative 2: Antelope-Pardee East Mid-Slope 
            C.13.8. Alternative 3: Antelope-Pardee Single-Circuit 500-kV Towers 
            between Haskell Canyon and Pardee Substation 
            C.13.9. Alternative 4: Antelope-Pardee Rerouting of New Right-of-way 
            along Haskell Canyon 
            C.13.10. Alternative 5: Antelope-Pardee Sierra Pelona Reroute 
            C.13.11. No Project/Action Alternative 
            C.13.12. Impact and Mitigation Summary 
            C.13.13. Cumulative Effects 
            Figure C.13-1. Traffic Map 
            for Lancaster/Palmdale 
            Figure C.13-2. Traffic Map for 
            Angeles National Forest 
            Figure C.13-3. Traffic Map for 
            Santa Clarita 
            Figure C.13-4. Alternative 5 
            Road Crossings | 
        
 
            | 
        
 
          | C.14 | 
          Utilities 
            and Service Systems | 
        
 
          |   | 
          C.14.1. Affected Environment 
            C.14.2. Regulatory Framework 
            C.14.3. Significance Criteria 
            C.14.4. Applicant-Proposed Measures 
            C.14.5. Impact Analysis: Proposed Project/Action 
            C.14.6. Alternative 1: Partial Undergrounding of Antelope-Pardee Transmission 
            Line 
            C.14.7. Alternative 2: Antelope-Pardee East Mid-Slope 
            C.14.8. Alternative 3: Antelope-Pardee Single-Circuit 500-kV Towers 
            between Haskell Canyon and Pardee Substation 
            C.14.9. Alternative 4: Antelope-Pardee Rerouting of New Right-of-way 
            along Haskell Canyon 
            C.14.10. Alternative 5: Antelope-Pardee Sierra Pelona Reroute 
            C.14.11. No Project/Action Alternative 
            C.14.12. Impact and Mitigation Summary 
            C.14.13. Cumulative Effects | 
        
 
            | 
        
 
          | C.15 | 
          Visual Resources | 
        
 
          |   | 
          C.15.1. Affected Environment 
            C.15.2. Regulatory Framework 
            C.15.3. Significance Criteria 
            C.15.4. Applicant-Proposed Measures 
            C.15.5. Impact Analysis: Proposed Project/Action 
            C.15.6. Alternative 1: Partial Undergrounding of Antelope-Pardee Transmission 
            Line 
            C.15.7. Alternative 2: Antelope-Pardee East Mid-Slope 
            C.15.8. Alternative 3: Antelope-Pardee Single-Circuit 500-kV Towers 
            between Haskell Canyon and Pardee Substation 
            C.15.9. Alternative 4: Antelope-Pardee Rerouting of New Right-of-way 
            along Haskell Canyon 
            C.15.10. Alternative 5: Antelope-Pardee Sierra Pelona Reroute 
            C.15.11. No Project/Action Alternative 
            C.15.12. Impact and Mitigation Summary 
            C.15.13. Cumulative Effects 
            Figure C.15-1. Desired Landscape 
            Character and Scenic Integrity Objectives Map 
            Figure C.15-2. Key Observation 
            Positions Map 
            Figure C.15-3A. Existing Visual 
            Condition for KOP 1 
            Figure C.15-3B. Visual Simulation 
            for KOP 1 (2nd page) 
            Figure C.15-4A. Existing Visual 
            Condition for KOP 2 
            Figure C.15-4B. Visual Simulation 
            for KOP 2 (2nd page) 
            Figure C.15-4C. Visual Simulation 
            of TSP at KOP 2 (3rd page) 
            Figure C.15-5A. Existing Visual 
            Condition for KOP 3 
            Figure C.15-5B. Visual Simulation 
            for KOP 3 (2nd page) 
            Figure C.15-6A. Existing Visual 
            Condition for KOP 4 
            Figure C.15-6B. Visual Simulation 
            for KOP 4 (2nd page) 
            Figure C.15-6C. Visual Simulation 
            of TSP at KOP 4 (3rd page) 
            Figure C.15-7A. Existing Visual 
            Condition for KOP 5 
            Figure C.15-7B. Visual Simulation 
            for KOP 5 (2nd page) 
            Figure C.15-7C. Visual Simulation 
            of Transition Station as seen from KOP 5 (3rd page) 
            Figure C.15-7D. Visual Simulation 
            of Alternative 2 as seen from KOP 5 (4th page) 
            Figure C.15-8A. Existing Visual 
            Condition for KOP 6 
            Figure C.15-8B. Visual Simulation 
            for KOP 6 (2nd page) 
            Figure C.15-8C. Visual Simulation 
            of TSP at KOP 6 (3rd page) 
            Figure C.15-9A. Existing Visual 
            Condition for KOP 7 
            Figure C.15-9B. Visual Simulation 
            for KOP 7 (2nd page) 
            Figure C.15-10A. Existing Visual 
            Condition for KOP 8 
            Figure C.15-10B. Visual Simulation 
            for KOP 8 (2nd page) 
            Figure C.15-10C. Visual Simulation 
            of Transition Station as seen from KOP 8 (3rd page) 
            Figure C.15-10D. Visual Simulation 
            of Alternative 2 as seen from KOP 8 (4th page) 
            Figure C.15-11A. Existing Visual 
            Condition for KOP 9 
            Figure C.15-11B. Visual Simulation 
            for KOP 9 (2nd page) 
            Figure C.15-12A. Existing Visual 
            Condition for KOP 10 
            Figure C.15-12B. Visual Simulation 
            for KOP 10 (2nd page) 
            Figure C.15-12C. Visual Simulation 
            of TSP at KOP 10 (3rd page) 
            Figure C.15-12D. Visual Simulation 
            of Alternative 3 as seen from KOP 10 (4th page) 
            Figure C.15-13A. Existing Visual 
            Condition for KOP 11 
            Figure C.15-13B. Visual Simulation 
            for KOP 11 (2nd page) 
            Figure C.15-13C. Visual Simulation 
            of TSP at KOP 11 (3rd page) 
            Figure C.15-13D. Visual Simulation 
            of Alternative 3 as seen from KOP 11 (4th page) 
            Figure C.15-14A. Existing Visual 
            Condition for KOP 12 
            Figure C.15-14B. Visual Simulation 
            for KOP 12 (2nd page) 
            Figure C.15-14C. Visual Simulation 
            of TSP at KOP 12 (3rd page) 
            Figure C.15-15A. Existing Visual 
            Condition for KOP 13 
            Figure C.15-15B. Visual Simulation 
            for KOP 13 (2nd page) 
            Figure C.15-16A. Existing Visual 
            Condition for KOP 14 
            Figure C.15-16B. Visual Simulation 
            for KOP 14 (2nd page) 
            Figure C.15-17A. Existing Visual 
            Condition for KOP 4-1 
            Figure C.15-17B. Visual Simulation 
            for KOP 4-1 (2nd page) 
            Figure C.15-18A. Existing Visual 
            Condition for KOP 5-1 
            Figure C.15-18B. Visual Simulation 
            for KOP 5-1 (2nd page) 
            Figure C.15-19A. Existing Visual 
            Condition for KOP 5-2 
            Figure C.15-19B. Visual Simulation 
            for KOP 5-2 (2nd page) 
            Figure C.15-20A. Existing Visual 
            Condition for KOP 5-3 
            Figure C.15-20B. Visual Simulation 
            for KOP 5-3 (2nd page) 
            Figure C.15-21A. Existing Visual 
            Condition for KOP 5-4 
            Figure C.15-21B. Visual Simulation 
            for KOP 5-4 (2nd page) 
            Figure C.15-22A. Existing Visual 
            Condition for KOP 5-5 
            Figure C.15-22B. Visual Simulation 
            for KOP 5-5 (2nd page) 
            Figure C.15-23A. Existing Visual 
            Condition for KOP 5-6 
            Figure C.15-23B. Visual Simulation 
            for KOP 5-6 (2nd page) 
            Figure C.15-24A. Existing Visual 
            Condition for KOP 5-7 
            Figure C.15-24B. Visual Simulation 
            for KOP 5-7 (2nd page) 
            Figure C.15-25A. Existing Visual 
            Condition for KOP 5-8 
            Figure C.15-25B. Visual Simulation 
            for KOP 5-8 (2nd page) 
            Figure C.15-26A. Existing Visual 
            Condition for KOP 5-9 
            Figure C.15-26B. Visual Simulation 
            for KOP 5-9 (2nd page) 
            Figure C.15-27A. Existing Visual 
            Condition for KOP 5-10 
            Figure C.15-27B. Visual Simulation 
            for KOP 5-10 (2nd page) 
            Figure C.15-28A. Existing Visual 
            Condition for KOP 5-11 
            Figure C.15-28B. Visual Simulation 
            for KOP 5-11 (2nd page) 
            Figure C.15-29A. Existing Visual 
            Condition for KOP 5-12 
            Figure C.15-29B. Visual Simulation 
            for KOP 5-12 (2nd page) 
            Figure C.15-30A. Existing Visual 
            Condition for KOP 5-13 
            Figure C.15-30B. Visual Simulation 
            for KOP 5-13 (2nd page) | 
        
 
            | 
        
 
          | D. | 
          Comparison 
            of Alternatives  | 
        
 
          |   | 
          D.1. Introduction 
            D.2. Summary of Alternatives 
            D.3. Alternatives Comparison Matrix 
            D.4. Comparison of Alternatives 
            D.5. CEQA Environmentally Superior Alternative 
            D.6. NEPA Lead Agency Preferred Alternative | 
        
 
            | 
        
 
          | E. | 
          Other Federal 
            Requirements and CEQA Considerations | 
        
 
          |   | 
          E.1. Long-Term Implications 
            E.2. Compliance with Applicable Federal Environmental Regulations 
            and Policies 
            E.3. The PdV Wind Energy Project 
            Figure E.3-1. PdV Wind Energy 
            Project Location | 
        
 
            | 
        
 
          | F. | 
          Public 
            Participation and Notification | 
        
 
          |   | 
          F.1. Notices of Preparation/Intent 
            F.2. Scoping Process 
            F.3. Notices of Completion and Availability 
            F.4. Draft EIR/EIS Public Hearings/Meetings 
            F.5. Document Repository Sites 
            F.6. Document Distribution List | 
        
 
            | 
        
 
          | G. | 
          References 
            and Organizations/Persons Consulted | 
        
 
          |   | 
          G.1. References 
            G.2. Organizations and Persons Consulted | 
        
 
            | 
        
 
          | H. | 
          Glossary 
            and Acronyms | 
        
 
          |   | 
          H.1. Glossary of Terms 
            H.2. Acronyms | 
        
 
            | 
        
 
          | I. | 
          List of 
            Preparers | 
        
 
            | 
        
 
          | J. | 
          Index | 
        
 
            | 
        
 
          | APPENDICES | 
        
 
          Appendix 
            1. Alternatives Screening Report: 
            Figure 1A. 
            General Cable Cross-section 
            Figure 
            1B. 
            Typical High Pressure Oil-Filled Pipe Type (HPOFPT) Cable Cross-section 
            Figure 
            1C. 
            Typical Solid Dielectric Cable Cross-section 
            Figure 2A. Antelope-Pardee 
            Partial Underground Alternative in the ANF 
            Figure 
            2B. Antelope-Pardee Partial 
            Underground Alternative in Santa Clarita 
            Figure 
            3A. Mid-Slope Alternative 
            Option A - Eastside of Del Sur Ridge 
            Figure 
            3B. Example of View from Bouquet Canyon Road with Relocation of 
            Towers East of Del Sur Ridge.  
            Figure 
            3C. Mid-Slope Alternative 
            Option A - Westside of Del Sur Ridge 
            Figure 3D. Example of View 
            from San Francisquito Canyon Road with Relocation of Towers West of 
            Del Sur Ridge  
            Figure 4. Typical 220-kV Double-Circuit 
            Lattice Tower  
            Figure 5. Cross-section of 
            the View of the Right-of-way between Mile 20.3 and Mile 25.6 
            Figure 6. Typical 500-kV Single-Circuit 
            Tubular Steel Pole 
            Figure 
            7. 
            Typical 500-kV Double-Circuit Tubular Steel Pole 
            Figure 
            8. 
            Re-Routing of New ROW in Santa Clarita Alternative 
            Figure 
            9. 
            Parallel LADWP ROW Alternative and Antelope-Vincent 500-kV Line in 
            Existing Antelope-Vincent Corridor 
            Figure 
            10. 
            Antelope-Vincent 500-kV Line in New Corridor Alternative 
            (3.8 MB) 
            Figure 
            11. 
            Antelope-Pardee 500-kV Line in New Corridor Alternative  
            Appendix 2. Notice 
            of Preparation, Notice of Intent, and Federal Register Notice 
            Appendix 3. Air Quality Calculations 
            Appendix 4. Biological Resources 
            Data 
            Appendix 5. Responses from the Native 
            American Heritage Commission and Native American Contacts 
            (3.1 MB) 
            Appendix 6. Proposed Project and Alternative Route Maps: 
            Proposed 
            Project, Map 1 of 4 
            Proposed Project, 
            Map 2 of 4 
            Proposed Project, 
            Map 3 of 4 
            Proposed Project, 
            Map 4 of 4 
            Alternative 1, Map 1 of 
            2 
            Alternative 1, Map 2 of 
            2 
            Alternative 2, Map 1 of 
            2 
            Alternative 2, Map 2 of 
            2 
            Alternative 3, Map 1 of 
            1 
            Alternative 4, Map 1 of 
            1 
            Alternative 5, Map 1 of 
            5 
            Alternative 5, Map 2 of 
            5 
            Alternative 5, Map 3 of 
            5 
            Alternative 5, Map 4 of 
            5 
            Alternative 5, Map 5 of 
            5  
             Appendix 7. Farmland 
            Conversion Impact Rating (Form AD 1006) 
             | 
        
 
            |