Notice of Availability 
            Title Page | 
        
		
	     
          |   | 
        
				
         
          | Executive Summary | 
        
         
          | ES.1  Introduction / Background | 
        
 
          | ES.2  Alternatives | 
        
 
          | ES.3  Environmental Impacts and Mitigation 
            Measures | 
        
 
          | ES.4  Summary Comparison of the Proposed 
            Project and Alternatives | 
        
 
          | ES.5  Impact Summary Tables | 
        
 
          | Fig. ES-1  
            Project Location | 
        
 
          | Fig. ES-2  
            SONGS Site Plan | 
        
 
          | Fig. ES-3  
            Photographs of SONGS 2 and 3 | 
        
 
          |    | 
        
 
          |  A.  
            Introduction | 
        
 
          | A.1  Overview and History of SONGS | 
        
 
          | A.2  Purpose and Need | 
        
 
          | A.3  Coordination of Industry Resources | 
        
 
          | A.4  Nuclear Regulatory Commission | 
        
 
          | A.5  CPUC Jurisdiction | 
        
 
          | A.6  Agency Use of this Document | 
        
 
          | A.7  Reader's Guide to This EIR | 
        
 
          | A.8  References | 
        
 
          | Fig. A-1  Typical 
            Nuclear Power Plant Steam Supply System | 
        
 
          |    | 
        
 
          |  B.  
            Project Description | 
        
 
          | B.1  Overview of Proposed Project | 
        
 
          | B.2  Project Background | 
        
 
          | B.3  Project Components | 
        
 
          | B.4  Decommissioning | 
        
 
          | B.5  Applicant-Proposed Measures | 
        
 
          | B.6  References | 
        
 
          | Fig. B-1 
             Project Location  | 
        
 
          | Fig. B-2 
             SONGS Site Plan  | 
        
 
          | Fig. B-3 
             Photographs of SONGS 2 and 3  | 
        
 
          | Fig. B-4 
             Original Steam Generator - Dimensions and Operating Parameters 
             | 
        
 
          | Fig. B-5 
             Del Mar Boat Basin RSG Offloading Location  | 
        
 
          | Fig. B-6a 
             Proposed RSG Transport Route (5.8 MB) | 
        
 
          | Fig. B-6b 
             Proposed RSG Transport Route (6.8 MB) | 
        
 
          | Fig. B-6c 
             Proposed RSG Transport Route (6.4 MB) | 
        
 
          | Fig. B-6d 
             Proposed RSG Transport Route (6.4 MB) | 
        
 
          | Fig. B-7 
             Conceptual Mat Placement for Two Inches of Water Flow  | 
        
 
          | Fig. B-8 
             Conceptual Mat Placement for Four Inches of Water Flow  | 
        
 
          |    | 
        
 
          |  C.  
            Alternatives | 
        
 
          | C.1  Applicant-Proposed Options  | 
        
 
          | C.2  Alternatives Development and Screening 
            Process  | 
        
 
          | C.3  Alternatives Screening Methodology 
           | 
        
 
          | C.4  Alternatives Evaluated in this EIR 
           | 
        
 
          | C.5  Alternatives Eliminated from Full 
            EIR Evaluation  | 
        
 
          | C.6  No Project Alternative  | 
        
 
          | C.7  References | 
        
 
          | Fig. C-1a 
             Alternative Transport Routes (5.9 MB) | 
        
        
 
          | Fig. C-1b 
             Alternative Transport Routes (6.9 MB) | 
        
        
 
          | Fig. C-1c 
             Alternative Transport Routes (6.6 MB) | 
        
        
 
          | Fig. C-1d 
             Alternative Transport Routes (6.4 MB) | 
        
        
 
          | Fig. C-2 
             Conceptual Drawing of Transport Over the Santa Margarita Bridge 
             | 
        
 
          | Fig. C-3 
             Potential Onsite OSG Storage Facility Locations | 
        
 
          | Fig. C-4 
             Alternatives Eliminated from Full EIR Evaluation | 
        
 
          | Fig. C-5 
             Natural Gas Pipeline Infrastructure in Southern California | 
        
 
          | Fig. C-6 
             Transmission Infrastructure in Southern California  | 
        
 
          |    | 
        
 
          |  D.1  
            Introduction to Environmental Analysis | 
        
        
 
          |  D.1.1  Introduction / Background | 
        
        
 
          |  D.1.2  Environmental Assessment Methodology | 
        
        
 
          |  D.1.3  References | 
        
        
 
          |    | 
        
 
          |  D.2  
            Air Quality | 
        
        
 
          |  D.2.1  Environmental Setting for the 
            Proposed Project | 
        
        
 
          |  D.2.2  Applicable Regulations, Plans, 
            and Standards | 
        
        
 
          |  D.2.3  Environmental Impacts and Mitigation 
            Measures for the Proposed Project | 
        
        
 
          |  D.2.4  Environmental Impacts and Mitigation 
            Measures for the Alternatives | 
        
        
 
          |  D.2.5  Environmental Impacts of the No 
            Project Alternative | 
        
        
 
          |  D.2.6  Mitigation Monitoring, Compliance, 
            and Reporting Table | 
        
        
 
          |  D.2.7  References | 
        
        
 
          |    | 
        
 
          |  D.3  
            Biological Resources | 
        
        
 
          |  D.3.1  Environmental Setting for the 
            Proposed Project | 
        
        
 
          |  D.3.2  Applicable Regulations, Plans, 
            and Standards | 
        
        
 
          |  D.3.3  Environmental Impacts and Mitigation 
            Measures for the Proposed Project | 
        
        
 
          |  D.3.4  Environmental Impacts and Mitigation 
            Measures for the Alternatives | 
        
        
 
          |  D.3.5  Environmental Impacts of the No 
            Project Alternative | 
        
        
 
          |  D.3.6  Mitigation Monitoring, Compliance, 
            and Reporting Table | 
        
        
 
          |  D.3.7  References | 
        
        
 
          | Fig. D.3-1 
             Proposed Project and Alternative Transport Routes Photo Locations | 
        
 
          | Fig. D.3-2 
             Photographs - Boat Basin and Bulkhead | 
        
 
          | Fig. D.3-3 
             Photographs - Segment A (Camp Del Mar / Beach Transition) | 
        
 
          | Fig. D.3-4 
             Photographs - Segment B (Santa Margarita River Estuary and Nesting 
            Habitat) | 
        
 
          | Fig. D.3-5 
             Photographs - Segment C (Beach Military Road) | 
        
 
          | Fig. D.3-6 
             Photographs - Segment D (Red Beach / Dirt Road Transition) | 
        
 
          | Fig. D.3-7 
             Photographs - Segment E (Dirt Road Parallel to I-5) | 
        
 
          | Fig. D.3-8 
             Photographs - Segment F (Dirt Road and I-5 Transition) | 
        
 
          | Fig. D.3-9 
             Photographs - Segment G (Dirt Road / Old Highway 101 Transition) | 
        
 
          | Fig. D.3-10 
             Photographs - Segment H (Dirt Road / Old Highway 101 Transition 
            "Y" Turn) | 
        
 
          |    | 
        
 
          |  D.4  Cultural 
            Resources | 
        
        
 
          |  D.4.1  Environmental Setting for the 
            Proposed Project | 
        
        
 
          |  D.4.2  Applicable Regulations, Plans, 
            and Standards | 
        
        
 
          |  D.4.3  Environmental Impacts and Mitigation 
            Measures for the Proposed Project | 
        
        
 
          |  D.4.4  Environmental Impacts and Mitigation 
            Measures for the Alternatives | 
        
        
 
          |  D.4.5  Environmental Impacts of the No 
            Project Alternative | 
        
        
 
          |  D.4.6  Mitigation Monitoring, Compliance, 
            and Reporting Table | 
        
        
 
          |  D.4.7  References | 
        
        
 
          |    | 
        
 
          |  D.5  
            Geology, Soils, and Paleontology | 
        
        
 
          |  D.5.1  Environmental Setting for the 
            Proposed Project | 
        
        
 
          |  D.5.2  Applicable Regulations, Plans, 
            and Standards | 
        
        
 
          |  D.5.3  Environmental Impacts and Mitigation 
            Measures for the Proposed Project | 
        
        
 
          |  D.5.4  Environmental Impacts and Mitigation 
            Measures for the Alternatives | 
        
        
 
          |  D.5.5  Environmental Impacts of the No 
            Project Alternative | 
        
        
 
          |  D.5.6  Mitigation Monitoring, Compliance, 
            and Reporting Table | 
        
        
 
          |  D.5.7  References | 
        
        
 
          | Fig. D.5-1  SONGS 
            Local Geology  | 
        
 
          | Fig. D.5-2 
             Aerial Infrared Photograph Showing Existing Landslides Along 
            San Onofre Bluffs  | 
        
 
          |    | 
        
 
          |  D.6  
            Hazardous Materials | 
        
        
 
          |  D.6.1  Environmental Setting for the 
            Proposed Project | 
        
        
 
          |  D.6.2  Applicable Regulations, Plans, 
            and Standards | 
        
        
 
          |  D.6.3  Environmental Impacts and Mitigation 
            Measures for the Proposed Project | 
        
        
 
          |  D.6.4  Environmental Impacts and Mitigation 
            Measures for the Alternatives | 
        
        
 
          |  D.6.5  Environmental Impacts of the No 
            Project Alternative | 
        
        
 
          |  D.6.6  Mitigation Monitoring, Compliance, 
            and Reporting Table | 
        
        
 
          |  D.6.7  References | 
        
        
 
          |    | 
        
 
          |  D.7  
            Hydrology and Water Quality | 
        
        
 
          |  D.7.1  Environmental Setting for the 
            Proposed Project | 
        
        
 
          |  D.7.2  Applicable Regulations, Plans, 
            and Standards | 
        
        
 
          |  D.7.3  Environmental Impacts and Mitigation 
            Measures for the Proposed Project | 
        
        
 
          |  D.7.4  Environmental Impacts and Mitigation 
            Measures for the Alternatives | 
        
        
 
          |  D.7.5  Environmental Impacts of the No 
            Project Alternative | 
        
        
 
          |  D.7.6  Mitigation Monitoring, Compliance, 
            and Reporting Table | 
        
        
 
          |  D.7.7  References | 
        
        
 
          | Fig. D.7-1 
             Map of Waterways in the Project Vicinity  | 
        
        
 
          |    | 
        
 
          |  D.8  
            Land Use, Recreation, and Military Operations | 
        
 
          |  D.8.1  Environmental Setting for the 
            Proposed Project | 
        
 
          |  D.8.2  Applicable Regulations, Plans, 
            and Standards | 
        
 
          |  D.8.3  Environmental Impacts and Mitigation 
            Measures for the Proposed Project | 
        
 
          |  D.8.4  Environmental Impacts and Mitigation 
            Measures for the Alternatives | 
        
 
          |  D.8.5  Environmental Impacts of the No 
            Project Alternative | 
        
 
          |  D.8.6  Mitigation Monitoring, Compliance, 
            and Reporting Table | 
        
 
          |  D.8.7  References | 
        
 
          | Fig. D.8-1 
             Notable Land Uses in the Vicinity of the Proposed Project  | 
        
        
 
          |    | 
        
 
          |  D.9  
            Noise and Vibration | 
        
 
          |  D.9.1  Environmental Setting for the 
            Proposed Project | 
        
 
          |  D.9.2  Applicable Regulations, Plans, 
            and Standards | 
        
 
          |  D.9.3  Environmental Impacts and Mitigation 
            Measures for the Proposed Project | 
        
 
          |  D.9.4  Environmental Impacts and Mitigation 
            Measures for the Alternatives | 
        
 
          |  D.9.5  Environmental Impacts of the No 
            Project Alternative | 
        
 
          |  D.9.6  Mitigation Monitoring, Compliance, 
            and Reporting Table | 
        
 
          |  D.9.7  References | 
        
 
          |  Fig. D.9-1 
             Typical Range of Common Sounds Heard in the Environment | 
        
        
 
          |    | 
        
 
          |  D.10  
            Public Services and Utilities | 
        
        
 
          |  D.10.1  Environmental Setting for the 
            Proposed Project | 
        
        
 
          |  D.10.2  Applicable Regulations, Plans, 
            and Standards | 
        
        
 
          |  D.10.3  Environmental Impacts and Mitigation 
            Measures for the Proposed Project | 
        
        
 
          |  D.10.4  Environmental Impacts and Mitigation 
            Measures for the Alternatives | 
        
        
 
          |  D.10.5  Environmental Impacts of the 
            No Project Alternative | 
        
        
 
          |  D.10.6  Mitigation Monitoring, Compliance, 
            and Reporting Table | 
        
        
 
          |  D.10.7  References | 
        
        
 
          |    | 
        
 
          |  D.11  
            Socioeconomics | 
        
        
 
          |  D.11.1  Environmental Setting for the 
            Proposed Project | 
        
        
 
          |  D.11.2  Applicable Regulations, Plans, 
            and Standards | 
        
        
 
          |  D.11.3  Environmental Impacts and Mitigation 
            Measures for the Proposed Project | 
        
        
 
          |  D.11.4  Environmental Impacts and Mitigation 
            Measures for the Alternatives | 
        
        
 
          |  D.11.5  Environmental Impacts of the 
            No Project Alternative | 
        
        
 
          |  D.11.6  Mitigation Monitoring, Compliance, 
            and Reporting Table | 
        
        
 
          |  D.11.7  References | 
        
        
 
          |    | 
        
 
          |  D.12  
            System and Transportation Safety | 
        
        
 
          |  D.12.1  Environmental Setting for the 
            Proposed Project | 
        
        
 
          |  D.12.2  Applicable Regulations, Plans, 
            and Standards | 
        
        
 
          |  D.12.3  Environmental Impacts and Mitigation 
            Measures for the Proposed Project | 
        
        
 
          |  D.12.4  Environmental Impacts and Mitigation 
            Measures for the Alternatives | 
        
        
 
          |  D.12.5  Environmental Impacts of the 
            No Project Alternative | 
        
        
 
          |  D.12.6  Mitigation Monitoring, Compliance, 
            and Reporting Table | 
        
        
 
          |  D.12.7  References | 
        
        
 
          | Fig. D.12-1 
             SONGS Emergency Planning Zone Map  | 
        
 
          | Fig. D.12-2  Sources of Radiation 
            Exposure  (figure embedded in text) | 
        
        
 
          |    | 
        
 
          |  D.13  
            Traffic and Circulation | 
        
        
 
          |  D.13.1  Environmental Setting for the 
            Proposed Project | 
        
        
 
          |  D.13.2  Applicable Regulations, Plans, 
            and Standards | 
        
        
 
          |  D.13.3  Environmental Impacts and Mitigation 
            Measures for the Proposed Project | 
        
        
 
          |  D.13.4  Environmental Impacts and Mitigation 
            Measures for the Alternatives | 
        
        
 
          |  D.13.5  Environmental Impacts of the 
            No Project Alternative | 
        
        
 
          |  D.13.6  Mitigation Monitoring, Compliance, 
            and Reporting Table | 
        
        
 
          |  D.13.7  References | 
        
        
 
          |  Fig. D.13-1 
             Project Area Roadway System | 
        
 
          |    | 
        
 
          |  D.14  
            Visual Resources | 
        
        
 
          |  D.14.1  Environmental Setting for the 
            Proposed Project | 
        
        
 
          |  D.14.2  Applicable Regulations, Plans, 
            and Standards | 
        
        
 
          |  D.14.3  Environmental Impacts and Mitigation 
            Measures for the Proposed Project | 
        
        
 
          |  D.14.4  Environmental Impacts and Mitigation 
            Measures for the Alternatives | 
        
        
 
          |  D.14.5  Environmental Impacts of the 
            No Project Alternative | 
        
        
 
          |  D.14.6  Mitigation Monitoring, Compliance, 
            and Reporting Table | 
        
        
 
          |  D.14.7  References | 
        
        
 
          |  Fig. D.14-1 
             Landscape Units, and KOPs within the Proposed Project's Viewshed | 
        
 
          |  Fig. D.14-2  
            Landscape Unit 1: Coastal Marine Terrace, Bluffs, and Beaches | 
        
 
          |  Fig. D.14-3  
            KOP 1: San Onofre State Beach | 
        
 
          |  Fig. 
            D.14-4  KOP 2: Interstate 5 Vista Point; MCBCP Facilities within 
            Landscape Unit 1 | 
        
 
          |  Fig. D.14-5  
            Landscape Unit 2: Santa Margarita Mountains; Landscape Unit 3: Santa 
            Margarita River | 
        
 
          | Fig. D.14-6 
             KOP 3: Camp Del Mar | 
        
 
          | Fig. D.14-7  
            KOP 4: Interstate 5 | 
        
 
          | Fig. D.14-8  
            KOP 5: SONGS Site and Facilities | 
        
 
          | Fig. D.14-9  
            KOP 4: Interstate 5 / Las Pulgas Road Transition | 
        
 
          | Fig. D.14-10  
            KOP 1: San Onofre State Beach / Landscape Beds | 
        
 
          | Fig. D.14-11  
            KOP 4: Interstate 5 / Segments L, N, Q, R | 
        
 
          |    | 
        
 
          |  E.  
            Comparison of Alternatives | 
        
 
          |  E.1  Comparison Methodology | 
        
 
          |  E.2  Environmentally Superior Alternative | 
        
 
          |  E.3  No Project Alternative vs. the Environmentally 
            Superior Alternative | 
        
 
          |    | 
        
 
          |  F.  
            Other CEQA Considerations | 
        
 
          |  F.1  Growth Inducing Effects | 
        
 
          |  F.2  Significant Irreversible Changes | 
        
 
          |  F.3  Cumulative Scenario | 
        
 
          |  F.4  Cumulative Impact Analysis | 
        
 
          |  F.5  References | 
        
 
          |    | 
        
 
          |  G.  
            NRC License Renewal | 
        
 
          |  G.1  SCE's Position on NRC License Renewal | 
        
 
          |  G.2  NRC Licensing Process | 
        
 
          |  G.3  Status of License Renewal Applications | 
        
 
          |  G.4  References | 
        
 
          |    | 
        
 
          |  H.  
            Mitigation Monitoring and Reporting | 
        
 
          |  H.1  Introduction to MMCRP | 
        
 
          |  H.2  Roles and Responsibilities | 
        
 
          |  H.3  General Monitoring Procedures | 
        
 
          |  H.4  Mitigation Compliance Plan | 
        
 
          |  H.5  Condition Effectiveness Review | 
        
 
          |  H.6  Mitigation Monitoring Program Tables | 
        
 
          |    | 
        
 
          |  I.  
            Public Participation | 
        
 
          |  I.1  EIR Scoping Process | 
        
 
          |  I.2  Public Notification | 
        
 
          |    | 
        
 
          |  J.  
            Report Preparation | 
        
 
          |  J.1  EIR Preparers | 
        
 
          |  J.2  EIR Information Contacts | 
        
 
          |  J.3  List of Definitions and Acronyms | 
        
 
          |    | 
        
 
          | Appendices | 
        
 
          |  Appendix 1.  Notice 
            of Preparation | 
        
 
          |  Appendix 2.  
            Biological Resources | 
        
 
          | Appendix 3.  
            Cultural Resources | 
        
 
          |  Appendix 4.  
            Summary of Pertinent Federal Regulations | 
        
 
          |    |