             Proponent's Environmental Assessment - April 
              2010 
              Cover Page 
              Title Page 
              Table of Contents 
              Glossary of Acronyms 
              Index to CPUC 
              PEA Requirements 
            | 
        
         
          | Executive 
            Summary | 
        
         
          1. Project 
            Description 
            Figure 
            1-1. Project Overview Map  
            Figure 
            1-2. Proposed Substation Site Aerial Map  
            Figure 
            1-3. Fulton-Fitch Mountain Distribution Planning Area Location 
            Map  
            Figure 
            1-4. Typical Three-Bank Substation Layout  
            Figure 
            1-5. Typical Three-Bank Substation Profile  
            Figure 1-6. 
            Typical Tubular Steel Pole  
            Figure 1-7. 
            Reconductoring of 12 kV Distribution Lines 
            Figure 
            1-8. Typical Joint Trench Configuration  | 
        
         
          2. Alternatives 
            Analysis 
            Figure 
            2-1. Alternative Sites Location Map  
            Figure 2-2. 
            Land Use Designations  
            Figure 2-3. Site A Alternative 
             
            Figure 2-4. Site C Alternative | 
        
         
          | 3. Environmental 
            Impacts Summary | 
        
         
          4. Aesthetics 
            Figure 
            4-1. Photo Viewpoint Locations  
            Figure 4-2. Photographs of the 
            Project Area and Vicinity 
            Figure 4-3a. Existing View from 
            Mitchell Lane 
            Figure 4-3b. Visual Simulation 
            from Mitchell Lane (4.7MB) 
            Figure 4-4a. Existing View from 
            Cameron Drive 
            Figure 4-4b. Visual Simulation 
            from Cameron Drive 
            Figure 4-5a. Existing View from 
            Eagle Drive 
            Figure 4-5b. Visual Simulation 
            from Eagle Drive | 
        
         
          | 5. Air Quality  | 
        
         
          | 6. Biological 
            Resources  | 
        
         
          | 7. Cultural Resources 
             | 
        
         
          | 8. Geology, Soils, Mineral 
            Resources, and Paleontology | 
        
         
          | 9. Hazardous 
            Materials  | 
        
         
          10. 
            Hydrology and Water Quality 
            Figure 
            10-1. Hydrology  | 
        
         
          11. Land Use and 
            Planning, Recreation, and Agricultural Resources 
            Figure 
            11-1. General Plan Map  | 
        
         
          | 12. Noise  | 
        
         
          | 13. Population and Housing 
             | 
        
         
          | 14. Transportation 
            and Traffic  | 
        
         
          15. Growth-Inducing 
            Cumulative Impacts 
            Figure 
            15-1. Planned Projects  | 
        
         
            
            Attachments | 
        
         
          |  
             Attachment 
              A. Windsor Town Support Letter 
              Attachment 
              B. Air Quality Construction Phase Analysis, Supporting Data 
               
              Attachment 
              C. Calculations for Operations Emissions Estimates 
              Attachment 
              D. Native American Consultation 
              Attachment 
              E. Environmental Database Resources  
              Attachment F. Electric and 
              Magnetic Fields 
              Attachment 
              G. Properties within 300 Feet of the Project Site 
           | 
        
         
            
            Supplement to Proponent's 
            Environmental Assessment - May 2011 
            Cover, 
            Contents, Glossary, Acronyms  
            Executive Summary  
            1. Alternatives Analysis  
            2. Site 8 Project Description 
             
            3. Site 8 Environmental 
            Impact Assessment  
            4. Site 3 Project Description 
            5. Site 3 Environmental 
            Impact Assessment  
            Attachment A - Avoidance and Protection 
            Measures  
            Attachment B - Summary of Construction-Phase 
            Emissions, Site 8 
            Attachment C - Summary of Construction-Phase 
            Emissions, Site 3 |