CPUC Seal  

STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION

Pacific Gas & Electric Company's Hollister 115 kV Power Line Reconductoring Project

(Application A.09-11-016)

 

Draft Initial Study / Mitigated Negative Declaration

acrobat

Files linked on this page are in Portable Document Format (PDF). To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your PC. Note: For best results in displaying the largest files (see sizes shown in parentheses below for files larger than 3.0 MB), right-click the file's link, click "Save Target As" to download the file to a folder on your hard drive, then browse to that folder and double-click the downloaded file to open it in Acrobat.

 

Full Document (4.12mb)

Executive Summary

Table of Contents

1. Environmental Determination

2. Project Description

3. Environmental Checklist and Discussion

  3.1 Aesthetics
3.2 Agricultural and Forestry Resources
3.3 Air Quality and Greenhouse Gas Emissions
3.4 Biological Resources
3.5 Cultural Resources
3.6 Geology, Soils, and Seismicity
3.7 Hazards and Hazardous Materials
3.8 Hydrology and Water Quality
3.9 Land Use and Planning
3.10 Mineral Resources
3.11 Noise
3.12 Population and Housing
3.13 Public Services
3.14 Recreation
3.15 Transportation and Traffic
3.16 Utilities and Service Systems
3.17 Mandatory Findings of Significance

 

4. Report Preparers

5. Mitigation Monitoring, Reporting, and Compliance Program

Appendices

A. Electric and Magnetic Fields

B. Air Quality

C. Aesthetics Methodology

D. Mailing List and Certificate of Service

Website info

This page contains tables and is best viewed with Firefox or Internet Explorer.
Please report any problems to the .

   
   
 

Project Home Page - CPUC Environmental Information - CPUC Home - Top