Notice of Availability
VOLUME I
Title
Page
|
| |
| Executive
Summary |
| ES.1. Introduction/Background |
| ES.2. Alternatives |
| ES.3. Environmental Impacts and Mitigation
Measures |
| ES.4. Summary Comparison of the Proposed
Project and Alternatives |
| ES.5. Impact Summary Tables |
| ES.6. References |
| Fig.
ES-1. Regional Project Location |
| Fig.
ES-2. Proposed Project |
| Fig.
ES-3. Diablo Canyon Power Plant |
| Fig.
ES-4. Proposed Project Alternatives |
| |
| A.
Introduction |
| A.1. Overview and History of DCPP |
| A.2. Purpose and Need |
| A.3. Coordination of Industry Resources |
| A.4. Nuclear Regulatory Commission |
| A.5. CPUC Jurisdiction |
| A.6. Agency Use of this Document |
| A.7. Reader's Guide to This EIR |
| A.8. References |
| Fig.
A-1. Typical Nuclear Power Plant Steam Supply System |
| Fig. A-2. Steam Generator Tube Degradation
Mechanisms (figure embedded in text) |
| |
| B.
Project Description |
| B.1. Overview of Proposed Project |
| B.2. Project Background |
| B.3. Project Components |
| B.4. Project Schedule, Equipment and
Personnel Requirements |
| B.5. Decommissioning |
| B.6. Project Description Measures or
Activities to Prevent Environmental Impacts |
| B.7. References |
| Fig.
B-1. Regional Project Location |
| Fig.
B-2. Proposed Project |
| Fig.
B-3. Diablo Canyon Power Plant |
| Fig. B-4. Steam Generator - Dimensions
and Operating Parameters (figure embedded in text) |
| Fig.
B-5. Port San Luis |
| Fig. B-6. Barge Route through Moorings
into Port San Luis (figure embedded in text) |
| Fig.
B-7. Photos of Steam Generator Barges |
| Fig. B-8. Plan View of "Live Offload"
Barge Docking at Port San Luis (figure embedded
in text) |
| Fig. B-9. Barge and Ground Transporter
Drawing (figure embedded in text) |
| Fig.
B-10. Photos of Steam Generator Offloading |
| Fig.
B-11. Port San Luis Area |
| Fig. B-12. Steam Generator on Runway
Moving through the Equipment Hatch from the Containment Structure
onto the Auxiliary Building Roof (figure embedded
in text) |
| Fig. B-13. Steam Generator Lifted from
Place and onto the Runway Moving through the Equipment Hatch from
the Containment Structure onto the Auxiliary Building Roof (figure
embedded in text) |
| Fig. B-14. Steam Generator Passing over
the Auxiliary Building (figure embedded in text) |
| Fig. B-15. Steam Generator Lowered onto
the Transporter Outside of the Auxiliary Building (figure
embedded in text) |
| Fig. B-16. Additional Workforce during
Proposed Project (figure embedded in text) |
| |
| C.
Alternatives |
| C.1. Applicant Proposed Options |
| C.2. Alternatives Development and Screening
Process |
| C.3. Alternatives Screening Methodology |
| C.4. Alternatives Evaluated in this
EIR |
| C.5. Alternatives Evaluated and Eliminated |
| C.6. No Project Alternative |
| C.7. References |
| Fig.
C-1. Proposed Project Alternatives |
| Fig.
C-2. Potential Alternatives in the Port San Luis Vicinity |
| Fig.
C-3. Potential Alternatives from Port San Luis to DCPP Facility |
| Fig.
C-4. Potential Alternatives in the DCPP Vicinity |
| Fig.
C-5. Potential Alternatives Northwest of DCPP Facility |
| Fig.
C-6. Natural Gas Pipeline Infrastructure in California |
| Fig.
C-7. Transmission Infrastructure in California |
| |
| D.1.
Introduction to Environmental Analysis |
| |
| D.2.
Air Quality |
| |
| D.3.
Biological Resources |
| Fig.
D.3-1. Native and Introduced Vegetation Adjacent to the
RSG Offloading Alternative and Transport Route |
| |
| D.4.
Cultural Resources |
| Fig.
D.4-1. Area of Potential Effects (APE) |
| |
| D.5.
Geology, Soils, and Paleontology |
| Fig.
D.5-1. View of Hill 914 and Green Peak |
| Fig.
D.5-2. Geologic Formations and Mapped Landslide Areas |
| Fig.
D.5.3. Example of Rockfall near Atascadero |
| Fig.
D.5.4. Example of Rockfall near Santa Rita |
| |
| D.6.
Hazardous Materials |
| |
| D.7.
Hydrology and Water Quality |
| Fig.
D.7-1. Drainageway Crossings Along RSG Transport Route |
| |
| D.8.
Land Use, Recreation, and Agriculture |
| Fig.
D.8-1. Diablo Canyon Power Plant Property Map |
| Fig.
D.8-2. Land Use, Recreation, and Agriculture Study Area |
| Fig.
D.8-3. Land Use Designations |
| Fig.
D.8-4. Recreational Facilities |
| Fig.
D.8-5. Important Farmland |
| Fig.
D.8-6. Williamson Act Lands |
| |
| D.9.
Noise and Vibration |
| Fig. D.9-1. Typical Range of Common
Sounds Heard in the Environment (figure embedded
in text) |
| |
| D.10.
Public Services and Utilities |
| |
| D.11.
Socioeconomics |
| |
| D.12.
System and Transportation Safety |
| Fig.
D.12-1. DCPP Emergency Planning Zone (EPZ) Map |
| Fig. D.12-2. Sources of Radiation Exposure
(figure embedded in text) |
| Fig. D.12-3. Barge Transport in Port
San Luis (figure embedded in text) |
| |
| D.13.
Traffic and Circulation |
| Fig.
D.13-1. Project Area Roadway System |
| |
| D.14.
Visual Resources |
| Fig.
D.14-1. Project Viewshed: Seen Areas, Landscape Units, and
KOPs |
| Fig.
D.14-2. San Luis Obispo Bay, Offloading Location, and Harford
Pier and Landing |
| Fig.
D.14-3. Coastal Hills |
| Fig.
D.14-4. Diablo Canyon Power Plant |
| Fig.
D.14-5. Open Water Viewpoints |
| |
| E.
Comparison of Alternatives |
| E.1. Comparison Methodology |
| E.2. Environmentally Superior Alternative |
| E.3. No Project Alternative vs. the
Environmentally Superior Alternative |
| |
| F.
Other CEQA Considerations |
| F.1. Growth Inducing Effects |
| F.2. Significant Irreversible Changes |
| F.3. Cumulative Scenario |
| F.4. Cumulative Impact Analysis |
| F.5. References |
| |
| G.
NRC License Renewal |
| G.1. PG&E's Position on NRC License
Renewal |
| G.2. NRC Licensing Process |
| G.3. Status of License Renewal Applications |
| G.4. Issues Relevant to DCPP License
Renewal |
| G.5. References |
| |
| H.
Mitigation Monitoring and Reporting |
| H.1. Introduction to MMCRP |
| H.2. Roles and Responsibilities |
| H.3. General Monitoring Procedures |
| H.4. Mitigation Compliance Plan |
| H.5. Condition Effectiveness Review |
| H.6. Mitigation Monitoring Program Tables |
| |
| I.
Public Participation |
| I.1. EIR Scoping Process |
| I.2. Public Notification |
| I.3. Final EIR Release |
| |
| J.
Report Preparation |
| J.1. EIR Preparers |
| J.2. EIR Information Contacts |
| J.3. List of Definitions and Acronyms |
| |
| Appendices |
| Appendix 1. Notice
of Preparation |
| Appendix
2. Biological Resources |
| Appendix
3. Summary of Pertinent Federal Regulations |
| |
VOLUME II
Title Page |
| |
| Introduction
to Volume II |
| Table 1. Commenters and Comment Set Numbers |
| Master Responses to Major Comments |
| Master Response MR-1: Baseline |
| Master Response MR-2: NRC License Renewal |
| Master Response MR-3: NRC vs. CPUC Jurisdiction |
| Master Response MR-4: RWQCB Consent Judgment |
| |
| Comments and Responses to Comments |
| Comments Received from
Public Agencies |
Comment Set A - Port San Luis Harbor District
Comment Set B - CDF/San Luis Obispo County Fire Department
Comment Set C - San Luis Obispo County Department of Planning &
Building |
| |
| Comments Received from
Public Agencies, cont. |
Comment Set D - California State Lands Commission
Comment Set E - California Coastal Commission
Comment Set F - San Luis Obispo County Air Pollution Control District |
| |
| Comments Received
from Organizations and Companies |
Comment Set CC1 - Arroyo Grande Valley Chamber of Commerce
Comment Set CC2 - Sierra Club
Comment Set CC3 - San Luis Obispo County Green Party
Comment Set CC4 - Avila Valley Advisory Council
Comment Set CC5 - Alliance for Nuclear Responsibility |
| |
| Comments Received from Organizations and Companies, cont. |
Comment Set CC6 - San Luis Obispo Mothers for Peace, Sierra Club,
Public Citizen, and Environment California (the "Joint Parties"):
Part 1
Part 2
Part 3
Part 4
Part 5 (6.6MB)
Part 6 (responses) |
| |
| Comments Received from
Organizations and Companies, cont. |
| Comment Set CC7 - Southern California Edison Company |
| |
| Comments Received at Public Workshops |
| Comment Set
PM1 - Public Meeting, San Luis Obispo, 5:30 p.m. April 19,
2005 |
| Comment Set
PM2 - Public Meeting, San Luis Obispo, 1:00 p.m. April 20,
2005 |
| |
| Comments Received from Private Individuals |
| Part 1
Part 2
Part 3 |
| |
| Comments Received from the Applicant (PG&E) |
| Part 1
Part 2
Part 3
Part 4
Part 5 (6.2MB)
Part 6
Part 7
Part 8 (responses) |