July 18, 1997
- Dean Shauers, Project Manager
- Pacific Pipeline System, Inc.
- 12201 E. Arapahoe Road, C10
- Englewood, CO 80112
RE: Variance Request Number 7
Dear Mr. Shauers:
We have reviewed the above-referenced variance
request, and our decision follows. In addition, we have been
informed that the Angeles National Forest concurs with our
decision on this matter.
Approved; however, the following measures shall
be implemented:
- All applicable mitigation measures for the
project shall be implemented at the subject locations.
- The following fueling kit shall be
installed around each piece of equipment fueled within
the 0.25 mile zone. The kit shall consist of an 8 by
8-foot area of plastic sheeting placed underneath or
adjacent to the vehicle and the refueling truck. A 3 by
3-foot by 6-inch deep pan shall be placed underneath the
vehicle being refueled. Each refueling truck shall also
be equipped with automatic shutoff nozzles to prevent
spillage from overtopping. In addition, absorbent
material shall be placed around the filler pipe and the
fueler shall be present throughout the entire fueling
operation.
- Refueling in the manner stipulated above
shall only occur along the project ROW at Peace Valley
Road, Lebec Road, the West Liebre Ridge reroute, and
Marple Canyon where no live streams are involved.
Refueling at these locations shall take place at the
maximum distance feasible from the stream. In no case
shall refueling take place within 200 feet of the banks
of any stream.
- Each refueling truck shall contain a fully
stocked spill containment kit which includes absorbent
pads, shovels, and appropriate spill containers.
- Variance #7 allows for refueling and
routine maintenance at the subject locations only if the
measures stipulated above are followed. Storage of fuel
or other hazard materials, or vehicle/equipment repair
shall not be allowed under the provisions of this
variance.
- All drips, leaks, and/or spills from
vehicles and/or equipment shall be excavated immediately
and disposed of in appropriate, labeled containers.
- Implementation of this variance in
accordance with the provisions noted above shall be
verified on a random basis by a CPUC/ANF Environmental
Monitor.
Sincerely,
- Martha J. Sullivan
- Project Manager
- cc: R. Borden, ANF
- H. Rastegar, Aspen