Cover |
|
Contents |
|
A.
Mitigated Negative Declaration |
Introduction
Project Description
Alternatives
Environmental Determination |
|
B. Initial Study |
B.1
Project Description |
B.1.1. Project Title
B.1.2. Project Sponsor's Name and Address
B.1.3. Lead Agency Name and Address
B.1.4. Lead Agency Contact Person and Phone Number
B.1.5. Project Location
B.1.6. Surrounding Land Uses and Setting
B.1.7. General Plan Designation
B.1.8. Zoning
B.1.9. Project Overview
B.1.10. Project Components
B.1.11. Project Construction Methods
B.1.12. Operations and Maintenance
B.1.13. Applicant Proposed Measures
B.1.14. EMF Summary
B.1.15. Other Public Agencies Whose Approval is Required
Fig. B.1-1. Regional Map
Fig. B.1-2. Project Area
Fig. B.1-3. Proposed Substation
Site and Subtransmission Route
Fig. B.1-4. SCE Rector System
within Electrical Needs Area
Fig. B.1-5. Substation Capacity
and Peak Demand in Electrical Needs Area
Fig. B.1-6. Proposed Substation
Site Diagram
Fig. B.1-7. Proposed Project
Underground Subtransmission Route
Fig. B.1-8. Tubular Steel Pole
for Transition to Underground Subtransmission Route
Fig. B.1-9. Proposed Fiber Optic
Cable Installation
Fig. B.1-10. Site Access
Fig. B.1-11. Proposed Pulling
Sites for Subtransmission Line Construction |
B.2.
Environmental Determination |
B.2.1. Environmental Factors Potentially
Affected
B.2.2. Environmental Determination |
B.3
Environmental Analysis and Mitigation |
B.3.1. Aesthetics
B.3.2. Agricultural Resources
B.3.3. Air Quality
B.3.4. Biological Resources
B.3.5. Cultural Resources
B.3.6. Geology and Soils
B.3.7. Hazards and Hazardous Materials
B.3.8. Hydrology and Water Quality
B.3.9. Land Use and Planning
B.3.10. Mineral Resources
B.3.11. Noise
B.3.12. Population and Housing
B.3.13. Public Services
B.3.14. Recreation
B.3.15. Transportation/Traffic
B.3.16. Utilities and Service Systems
B.3.17. Mandatory Findings of Significance |
Figs.
B.3-1 and B.3-2 |
|
Fig. B.3-1. Looking East from
North Mooney Boulevard Extension toward Substation Site
Fig. B.3-2. Looking West from North Mooney Boulevard Extension
away from Substation Site |
Figs.
B.3-3 and B.3-4 |
|
Fig. B.3-3. Looking East on Riggin
Avenue from North Mooney Boulevard Intersection
Fig. B.3-4. Looking Northwest from Riggin Avenue toward Substation
Site |
Fig.
B.3-5. Location of Key Observation Point 1, Looking Northwest
from Riggin Avenue |
Figs.
B.3-6A and B.3-6B |
|
Fig. B.3-6A. KOP 1: Looking Northwest
from Riggin Avenue toward Substation Site
Fig. B.3-6B. Simulation of New Substation Looking Northwest
from Riggin Avenue |
Figs.
B.3-7A and B.3-7B |
|
Fig. B.3-7A. KOP 2: Looking Northeast
from Riggin Avenue toward Substation Site
Fig. B.3-7B. Simulation of New TSP Riser and Substation Looking
Northeast from Riggin Avenue |
Figs.
B.3-8A and B.3-8B |
|
Fig. B.3-8A. Alternative Substation
Site in 2006 without Substation
Fig. B.3-8B. Simulation of Alternative Substation Site |
|
|
C.
Mitigation Monitoring Plan |
|
D.
Responses to Comments |
|
Appendix 1.
List of Preparers |
Appendix 2. References |
Appendix 3. Public
Notification Materials |
|