Cover |
Title Page
and Table of Contents |
A.
Final Mitigated Negative Declaration
Introduction
Project Description
Alternatives
Environmental Determination |
B. Initial Study |
B.1
Project Description
B.1.1 Project Title
B.1.2 Project Sponsor's Name and Address
B.1.3 Lead Agency Name and Address
B.1.4 Lead Agency Contact Person and Phone Number
B.1.5 Project Location
B.1.6 Surrounding Land Uses and Setting
B.1.7 General Plan Designation
B.1.8 Zoning
B.1.9 Project Overview
B.1.10 Project Components
B.1.11 Project Construction Methods
B.1.12 Operations and Maintenance
B.1.13 Applicant Proposed Measures
B.1.14 EMF Summary
B.1.15 Other Public Agencies Whose Approval is Required
Figure B-1. Regional
Map
Figure B-2. Project Area
Figure B-3. Proposed Substation General Arrangement (embedded
in document)
Figure B-4. Profile Drawing of 115 kV Switchrack and Bus Structures
(embedded in document)
Figure B-5. Single Tubular Steel Pole (embedded in
document)
Figure B-6a. Tubular Steel Pole Drop-Down Structure #1 (embedded
in document)
Figure B-6b. Tubular Steel Pole Drop-Down Structure #2 (embedded
in document)
Figure B-7. Typical TSP Structures (embedded in document) |
B.2
Environmental Determination
B.2.1 Environmental Factors Potentially Affected
B.2.2 Environmental Determination |
B.3
Environmental Analysis and Mitigation
B.3.1 Aesthetics
B.3.2 Agricultural Resources
B.3.3 Air Quality
B.3.4 Biological Resources
B.3.5 Cultural Resources
B.3.6 Geology and Soils
B.3.7 Hazards and Hazardous Materials
B.3.8 Hydrology and Water Quality
B.3.9 Land Use and Planning
B.3.10 Mineral Resources
B.3.11 Noise
B.3.12 Population and Housing
B.3.13 Public Services
B.3.14 Recreation
B.3.15 Transportation/Traffic
B.3.16 Utilities and Service Systems
B.3.17 Mandatory Findings of Significance
Figure B-8. View to East along Seventh Standard Road (embedded
in document)
Figure B-9. View to Northeast from Shane Street (embedded
in document)
Figure B-10. View to East along Seventh Standard Road (embedded
in document)
Figure B-11. View to West along Seventh Standard Road (embedded
in document)
Figure B-12. Existing View
along Seventh Standard Road and Simulation
Figure B-13. Land Ownership
Figure B-14. Existing Land
Use
Figure B-15. Zoning
Figure B-16. Planned Land
Use
Figure B-17. Proposed Land
Use
Figure B-18. Existing Sensitive
Receptors |
C. Mitigation Monitoring
Plan |
D. Reponses to Comments
Introduction
Comment Set A - Bakersfield
Development Services Department (6.8MB)
Comment Set B - City
of Shafter
Comment Set C - Pacific
Gas & Electric Company |
Appendices |
Appendix 1.
List of Preparers
Appendix 2. References
Appendix 3. Public
Notice Materials |