|  
             These files are in Portable Document Format (PDF). 
              To view them, you will need to download the free Adobe 
              Acrobat Reader if it is not already installed on your PC. 
              Note: For faster results in displaying the largest files 
              (see sizes in parentheses for files over 5.0MB), right-click 
              the file's link, click "Save Target As" to download 
              the file to your hard drive, then double-click the downloaded file. 
              The most recent documents 
              appear at the top of this list.  
            404 
              Nationwide Permit 
              U.S. Department of the Army, 1/7/11 
            Construction 
              Fire Plan: Fire Plan and Project Activity Levels 
              SDG&E, 1/13/11 
            Reinitiated 
              Biological Opinion 
              U.S. Fish & Wildlife Service, 11/10/10 
            Clean Water 
              Act Section 401 Certification 
              State Water Resources Control Board, 11/9/10 
            Restoration 
              Plan for Sensitive Vegetation (Habitat Restoration Plan) 
              ICF & Chambers, 11/5/10; compliance with 
              Mitigation Measure B-1a 
            
            Arroyo 
              Toad Relocation Plan 
              Recon, 11/4/10; compliance with Mitigation Measure 
              B-7j 
            
            Rare 
              and Invasive Weed Report, Rough Acres Construction Yard 
              Recon, 11/3/10; compliance with Mitigation Measures 
              B-3a and B-5a 
            Suncrest 
              Substation Screening Plan 
               SDG&E, 11/04/10; compliance with Mitigation 
              Measure V-7b 
            Suncrest 
              Substation Lighting Mitigation Plan 
              SDG&E, 10/26/10; compliance with Mitigation Measure V-1b 
            Suncrest 
              Substation Surface Treatment Plan 
              SDG&E, 10/25/10; compliance with Mitigation Measure V-7a 
            Suncrest 
              Substation Construction Lighting Mitigation Plan 
              SDG&E, 10/19/10; compliance 
              with Mitigation Measure V-1b 
            Habitat Mitigation and Monitoring 
              Plans (5 mitigation parcels) 
              WRA, November 2010; compliance with Mitigation Measure 
              B-2a 
               - Chocolate 
              Canyon 
               - Desert 
              Cahuilla 
                - Lightner 
              (11.9MB) 
               - Long 
              Potrero 
               - Suckle 
            
            Revise 
              Project Elements to Minimize Land Use Conflicts 
              SDG&E, 10/5/10; compliance with Mitigation Measure 
              L-2b 
            Raven Control 
              Plan 
              SDG&E, October 2010; compliance with Mitigation Measure B-11a 
            
            Powered 
              Haulage Estimated Acoustical Impact Potential 
              (9.3MB) 
              Investigative Science and Engineering, Inc., 9/29/10; 
              compliance with Mitigation Measure N-1a 
            Habitat 
              Acquisition Plan and Habitat Management Plan 
              SDG&E, 9/21/10; compliance with Mitigation 
              Measure B-1a 
            
            Weed Control 
              Plan (25.4MB) 
               RECON Environmental, 9/2/10; compliance with 
              Mitigation Measure B-3a 
            Bighorn 
              Sheep Monitoring Plan 
              Davenport Biological Services, 8/23/10; compliance 
              with Mitigation Measure B-7c 
            
            Scour Analysis 
              (73.6MB) 
              URS, 7/12/10; compliance with Mitigation Measure H-6a 
              and APMs WQ-APM-1, WQ-APM-2, WQ-APM-4, 
              and WQ-APM-10 
            Historical Properties Management Plan: 
              ASM Affiliates, Inc., July 2010 
              Final 
              Historical Properties Management Plan 
              Appendix 
              A: Programmatic Agreement 
              Appendix 
              B: Mitigation Monitoring, Compliance, and Reporting Program, 
              with appendices (24.9MB) 
              Appendix 
              C: Research Design 
              Appendix 
              D: Impacts Analysis 
              - Summary 
              Table of Archaeological Sites Identified within the SRPL Survey 
              Corridor with Assigned Dates 
              - Table 
              1: Proposed Eligibility Testing Methods and Data Potential Matrix 
              for Sunrise Sites Subject to Impacts 
              - Table 
              2: Proposed Environmentally Sensitive Area (ESA) and Monitoring 
              Mitigation for the SRPL FESSR 
              Appendix 
              E: Evaluation and Monitoring Methods 
              Appendix 
              F: Curation Agreement - to be included at a later date 
              Appendix 
              G: Native American Graves Protection and Repatriation Act (NAGPRA) 
              Regulations 
              Appendix 
              H: Resumes of Preparers 
              Appendix 
              I: Native American Consultation 
            Final 
              Paleontological Monitoring Treatment Plan 
              (9.1MB) 
              Department of PaleoServices, San Diego Natural History 
              Museum, 6/17/10; compliance with Mitigation Measures PAL-1a 
              and PAL-1b 
            Fire 
              Mitigation Funds Utilization Plan 
              SDG&E, 6/1/10; compliance with Mitigation Measures 
              F-1e and F-3a 
            Sampling 
              and Testing Plan 
              SDG&E, 3/24/10; compliance with Mitigation Measures 
              P-2a and P-7a and APM HS-APM-5 
             
            Hazard 
              Communication Plan 
              SDG&E, 3/21/10; compliance with Mitigation 
              Measure P-1a and APMs HS-APM-1 and HS-APM-3 
            Construction 
              Notification Plan 
              SDG&E, 3/1/10; compliance with Mitigation Measures 
              L-1a, S-2a, and F-3b, and APMs LU-APM-1 
              and LU-APM-4 
            Creek Crossing Scour and Erosion Protection Plan 
              SDG&E, Initial 
              Submittal, 2/22/10; compliance with Mitigation Measure H-8a 
               
              SDG&E, Response, 
              4/16/10; compliance with Mitigation Measure H-8a 
              SDG&E, Response, 
              6/10/10; compliance with Mitigation Measure H-8a  
            Construction 
              Emissions Monitoring Plan 
              SDG&E, 1/21/10; compliance with Mitigation Measures 
              AQ-1b and AQ-1h, and APMs AQ-APM-4 and 
              AQ-APM-5 
            Mountain Springs Grade Storm 
              Water Pollution Prevention Plan 
              TRC, 12/15/09; compliance with Mitigation Measures 
              H-1a, H-1b, and H-6a, and APMs WQ-APM-4 and WQ-APM-14 
            Addendum No. 3 
              to Phase I Environmental Site Assessment 
              Geosyntec Consultants, 12/3/09; compliance with 
              Mitigation Measures P-2a and P-7a and 
              APM HS-APM-5 (16.3MB) 
            Construction 
              Fire Prevention Plan 
              SDG&E, 12/1/09; compliance with Mitigation 
              Measure F-1a 
            California 
              Department of Fish & Game Notification of Lake or Streambed 
              Alteration Application 
              WRA Environmental Consultants, 11/30/09 
              Attachments (717 files) - View a list 
              of attachments available by email or mailed CD. 
            Dust 
              Control Plan 
              Sempra Energy, 11/09; compliance with Mitigation Measure AQ-1a 
              and APMs AQ-APM-1, AQ-APM-2, and AQ-APM-3 
              Cover Letter 
              Appendix 
              A - Final Environmentally Superior Southern Route Construction Mapbook 
              (60.9MB) 
              Appendix 
              B - Water Sites Mapbook (6.8MB) 
              Appendix 
              C - Dust Control Plan Form 
              Appendix 
              D - Daily Log 
            State Water Resources 
              Control Board Section 401 Water Quality Certification Application 
              WRA Environmental Consultants, 10/8/09 
              Attachments (716 files) - View 
              a list of attachments available by email or mailed CD. 
            U.S. Army Corps of Engineers Section 404 Permit Application: 
              Permit Application 
              NWP 12 
              Nationwide Permit Pre-Construction 
              Notification (PCN) Form 
              WRA Environmental Consultants, 9/28/09 
              Attachments (529 files) - View a list 
              of attachments available by email or mailed CD. 
            SDG&E 
              Revised and Updated Preliminary Jurisdiction Determination Report 
              WRA Environmental Consultants, 7/23/09 
              Appendices & Attachments (319 files) - View 
              a list of appendices/attachments available by email or mailed 
              CD. 
            Desert 
              Pavement Protection Plan 
              Burns & McDonnell Engineering Company, Inc., 
              7/09; compliance with Mitigation Measure G-2a 
            SDG&E 
              Air Quality Mitigation Program for Construction Air Emissions, including 
              emission calculations 
              SDG&E, 6/9/09; compliance with Mitigation Measure 
              AQ-1h 
            Subsurface 
              Utility Report #5 - Sunrise Powerlink Alpine Boulevard Project 
              GeoSyntec Consultants, 4/14/09 
            Subsurface 
              Utility Report #1 - Sunrise Powerlink Coastal Link Project 
              GeoSyntec Consultants, 2/20/08 
             |