| Welcome to the California Public Utilities Commission (CPUC) website 
              for the California Environmental Quality Act (CEQA) review of the 
              proposed Sunrise Powerlink Transmission Line Project. Applications 
              for this project were submitted to the CPUC on December 14, 
              2005 (A.05-12-014) and August 4, 2006 (A.06-08-010). This site 
              provides access to public documents and information relevant to 
              the CEQA and National Environmental Policy Act (NEPA) review processes. 
             Background SDG&E has filed an application with the CPUC to construct the 
              Sunrise Powerlink Project (SRPL). The CPUC is the CEQA lead agency 
              and the U.S. Bureau of Land Management (BLM) is the lead agency 
              under NEPA. This project was approved by the California Independent 
              System Operator on August 3, 2006. The Proponent's Environmental 
              Assessment was filed with the CPUC on August 4, 2006 and is 
              available on SDG&E's 
              project website. The CPUC maintains other webpages for documents related to its 
              proceeding on the SRPL, where it makes available documents filed 
              by parties to that proceeding. The two webpages for Applications 
              A.06-0-8010 
              and A.05-12-014 
              list documents and rulings filed in the proceedings. The CPUC also 
              maintains a page of general 
              information on the SRPL project. The SRPL Project, as proposed by SDG&E, includes a new, approximately 
              90-mile 500 kV line from Imperial Valley Substation (in Imperial 
              County, near the City of El Centro) to a new Central East Substation 
              (in central San Diego County, south of the intersection of County 
              Highways S-22 and S-2). The 500 kV portion 
              would approximately follow the eastern boundary of BLM lands west 
              of El Centro and SR 78, and would pass through Anza-Borrego 
              Desert State Park. The SRPL Project also proposes approximately 60 miles of 230 kV 
              transmission lines from the new Central East Substation to SDG&E's 
              existing Peñasquitos Substation (in the City of San 
              Diego). SDG&E proposes to construct two segments underground 
              (one segment south of Ramona and another in the community of Ranchos 
              Peñasquitos, San Diego). Figure 1 
              shows an overview of the proposed project route. Data Requests The EIR/EIS Team will submit Data Requests to SDG&E when it 
              needs specific information to support EIR/EIS preparation. These 
              requests will be made available here at the time they are issued. 
              Data requests submitted to SDG&E to date are: Data Request No. 1 (September 27, 
              2006)
 
 Public Scoping Meetings On August 31, 2006, the BLM published its Notice 
              of Intent to prepare an Environmental Impact Statement in the 
              Federal Register (Volume 71, No. 169, page 51848). On September 
              15, 2006, the CPUC issued a Notice of 
              Preparation/Notice of Public Scoping Meetings for an Environmental 
              Impact Report/Environmental Impact Statement. In October 2006, the 
              CPUC and BLM will hold a series of public scoping meetings to take 
              public comment on the scope and content of the environmental document. 
              The schedule for these meetings appears below. 
               
                | Public Scoping Meetings |   
                | Location | Day/Date/Time | Directions |   
                | El CentroImperial County
 Board of Supervisors
 940 West Main Street
 Suite 219
 El Centro CA 92243
 
 | MondayOct. 2, 2006
 
 4:30-8:00pm
 | From the west, take I-8 
                  to Exit 114 directly onto northbound Imperial Ave. After 1.6 
                  miles on Imperial Ave., turn right on W. Main Street. The Board 
                  of Supervisors building is across from the courthouse. From the north, take Hwy 86 south into El Centro and 
                  turn left on W. Main Street. The Board of Supervisors building 
                  is across from the courthouse.
 |   
                | RamonaCharles Nunn
 Performing Arts Center
 1521 Hanson Lane
 Ramona CA 92065
 
 | TuesdayOct. 3, 2006
 
 4:00-6:00pm
 7:00-9:00pm
 | From the south, take I-15 
                  to Scripps Poway Pkwy (S4) eastbound. After about 8 miles turn 
                  left on SR 67 and continue into Ramona, following directions 
                  below. From east or west on SR 67 (also Main Street) in Ramona, 
                  turn southeast onto Hunter St. At the end of the street, take 
                  a sharp left onto Rowley Ave. Take the first right onto Ramona 
                  St, then the first left on Hanson Lane. The PAC is 0.5 miles 
                  further on the left, next to the high school.
 |   
                | Borrego SpringsBorrego Springs Resort
 1112 Tilting T Drive
 Borrego Springs CA 92004
 
 |  WednesdayOct. 4, 2006
 
 2:00-4:30pm
 6:00-8:30pm
 | From the west, take S22 which turns 
                    right onto Palm Canyon Dr. Proceed 1.4 miles. At the turnaround, 
                    turn right (south) onto Borrego Springs Road and drive south 
                    1.8 miles. Turn left on Tilting T drive and follow its curves 
                    for 1.3 miles.From the east, take S22 which turns west in Borrego 
                    Springs as Palm Canyon Drive. Turn left on Borrego Valley 
                    Rd and your first right onto Tilting T Drive.
 
 Enter through the Borrego Springs Resort 
                    arches. The meeting room is in the main building.
 |   
                | San DiegoMission 
                    ValleyHilton Hotel
 901 Camino Del Rio S
 (near intersection of
 I-8 and SR 163)
 San Diego CA 92108
 
 | ThursdayOct. 5, 2006
 
 2:00-5:00pm
 | From north or south on SR 163, 
                  take the I 8 East and exit immediately onto Mission Center Rd 
                  toward Camino del Rio South. After almost a mile, the road curves 
                  sharply to the right onto Camino del Rio S. From the west on I-8, take exit 5 toward Auto Circle/Mission 
                  Center Rd. At the end of the ramp, turn right onto Camino del 
                  Rio S.
 |   
                | San DiegoRancho 
                    PeñasquitosDoubletree Golf Resort
 14455 Peñasquitos Drive
 San Diego CA 92129
 
 | Thursday
 Oct. 5, 2006
 6:30-9:00pm
 
 | From the north, take I-15 
                  to Exit 21/Carmel Mountain Road. Turn right (west) at the end 
                  of the exit ramp, then take the first right. The Doubletree 
                  is immediately on the right. From the south, take I-15 to Exit 21/Carmel Mountain 
                  Road. Turn left (west) at the end of the exit ramp, then take 
                  the first right. The Doubletree is immediately on the right.
 |  Documents Available SDG&E's 
              Application and Proponent's Environmental Assessment (August 4, 
              2006). Notice of Intent 
              (August 31, 2006) Notice of Preparation (NOP) (September 
              15, 2006)Note: Files displaying the figures for 
              the NOP are large and may display slowly. For faster results in 
              displaying these files, right-click the file's link, click "Save 
              Target As" to download the file to your hard drive, then double-click 
              the downloaded file.
 NOP Figure 
              1. Proposed Project Overview (12.0 MB)
 NOP Figure 2. Imperial Valley 
              Link (16.6 MB)
 NOP Figure 3. Anza-Borrego Link 
              (3.0 MB)
 NOP Figure 4A. Central Link 
              (6.2 MB)
 NOP Figure 4B. Proposed Central 
              East Substation (4.2 MB)
 NOP Figure 5A. Inland Valley 
              Link (21.7 MB)
 NOP Figure 5B. Detail of Ramona 
              Area (22.4 MB)
 NOP Figure 6A. Coastal Link 
              (19.3 MB)
 NOP Figure 6B. Rancho Peñasquitos 
              Detail (22.0 MB)
 NOP Figure 7. SDG&E Alternatives 
              Fully Evaluated and Carried Forward in PEA (17.0 MB)
 NOP Figure 8. SDG&E Alternatives 
              Considered and Eliminated (17.8 MB)
 For Additional Information To request additional information or to be added to the mailing 
              list, please contact us by email, fax, or phone, as follows: The CPUC's Project Manager is: Billie Blanchard, CPUC Project Manager 
              California Public Utilities Commission 
              505 Van Ness Avenue 
              San Francisco CA 94102 
              Tel. (415) 703-2068 
              Fax (415) 703-2200 
              Email: bcb@cpuc.ca.gov |