             Welcome to the California Public Utilities Commission (CPUC) website 
              for the California Environmental Quality Act (CEQA) review of the 
              proposed Sunrise Powerlink Transmission Line Project. Applications 
              for this project were submitted to the CPUC on December 14, 
              2005 (A.05-12-014) and August 4, 2006 (A.06-08-010). This site 
              provides access to public documents and information relevant to 
              the CEQA and National Environmental Policy Act (NEPA) review processes. 
             Background 
            SDG&E has filed an application with the CPUC to construct the 
              Sunrise Powerlink Project (SRPL). The CPUC is the CEQA lead agency 
              and the U.S. Bureau of Land Management (BLM) is the lead agency 
              under NEPA. This project was approved by the California Independent 
              System Operator on August 3, 2006. The Proponent's Environmental 
              Assessment was filed with the CPUC on August 4, 2006 and is 
              available on SDG&E's 
              project website. 
            The CPUC maintains other web pages for documents related to its 
              proceeding on the SRPL, where it makes available documents filed 
              by parties to that proceeding. The two web pages for Applications 
              A.06-0-8010 
              and A.05-12-014 
              list documents and rulings filed in the proceedings. The CPUC also 
              maintains a page of general 
              information on the SRPL project. 
            The SRPL Project, as proposed by SDG&E, includes a new, approximately 
              90-mile, 500 kV line from Imperial Valley Substation (in Imperial 
              County, near the City of El Centro) to a new Central East Substation 
              (in central San Diego County, south of the intersection of County 
              Highways S22 and S2). The 500 kV portion 
              would approximately follow the eastern boundary of BLM lands west 
              of El Centro and SR 78, and would pass through Anza-Borrego 
              Desert State Park. 
            The SRPL Project also proposes approximately 60 miles of 230 kV transmission 
            lines from the new Central East Substation to SDG&E's existing 
            Peñasquitos Substation (in the City of San Diego). SDG&E 
            proposes to construct two segments underground (one segment south 
            of Ramona and another in the community of Ranchos Peñasquitos, 
            San Diego). Figure 1 shows 
            an overview of the proposed project route. 
            Second Round of Scoping 
              on Alternatives 
            The CPUC and BLM will hold public meetings from February 5 through 
              February 9, 2007 in order to hear input on alternatives to the Sunrise 
              Powerlink Project. The meeting schedule is presented in the table 
              below. This notice lists all alternatives that were considered by 
              the EIR/EIS team and states whether each alternative is recommended 
              for detailed EIR/EIS analysis or for elimination. 
             
              Notice of Second Round of 
                Scoping Meetings on Alternatives to the Proposed Sunrise Powerlink 
                Project 
               Figure 
                1. Sunrise Powerlink Project Overview 
                Figure 2. Imperial Valley Link 
                Alternatives 
                Figure 3. Anza-Borrego Link 
                Alternatives  
                Figure 4. Central Link Alternatives 
                Figure 5. Inland Valley Link 
                Alternatives 
                Figure 6. Coastal Link Alternatives 
                Retained 
                Figure 7. Coastal Link Alternatives 
                Eliminated 
                Figure 8. Southwest Powerlink 
                Alternatives 
                Figure 9. Non-Wires Alternatives 
                Figure 10. System Alternatives 
                 
             
            At the scoping meetings, the CPUC and BLM will ask for public input 
              regarding the preliminary determinations on alternatives. In addition, 
              written comments may be submitted. All comments must be received 
              or postmarked by February 24, 2007. You may submit comments 
              in a variety of ways: (1) by U.S. Mail, (2) by electronic 
              mail, (3) by fax, or (4) by attending a Public Scoping 
              Meeting (see times and locations in the table below) and making 
              a verbal statement or handing in written comments at the scoping 
              meetings. 
            
               
                |  
                   Sunrise Powerlink - Public Meetings on 
                    Alternatives 
                 | 
               
               
                |  
                   Location 
                 | 
                 
                   Day, Date, Time 
                 | 
                 
                   Directions 
                 | 
               
               
                |  
                   El Centro 
                    Imperial County  
                    Board of Supervisors 
                    940 West Main St, Suite 219 
                    El Centro, CA 92243  
                 | 
                 
                   Monday, 
                    Feb. 5, 2007 
                    12:30 to 2:00 p.m.  
                 | 
                From the west, take I-8 
                  to Exit 114 directly onto northbound Imperial Ave. After 1.6 
                  miles on Imperial Ave, turn right on West Main St. The 
                  Board of Supervisors building is across from the courthouse. 
                  From the north, take Hwy 86 south into El Centro and 
                  turn left on West Main St. The Board of Supervisors building 
                  is across from the courthouse. | 
               
               
                |  
                   San Diego-Rancho Peñasquitos 
                    Doubletree Golf Resort 
                    14455 Peñasquitos Drive 
                    San Diego, CA 92129 
                 | 
                 
                   Monday 
                    Feb. 5, 2007 
                    7:30 to 9:30 p.m. 
                 | 
                From the north, take I-15 
                  to Exit 21/Carmel Mountain Rd. Turn right (west) at the end 
                  of the exit ramp, then take the first right. The Doubletree 
                  is immediately on the right. 
                  From the south, take I-15 to Exit 21/Carmel Mountain Rd. 
                  Turn left (west) at the end of the exit ramp, then take the 
                  first right. The Doubletree is immediately on the right. | 
               
               
                |  
                   Julian 
                    Wynola Pizza Express  
                    (The Red Barn) 
                    4355 Highway 78  
                    Julian, CA 92036  
                    (760) 765-3636 
                 | 
                 
                   Tuesday 
                    Feb. 6, 2007 
                    2:00 to 4:00 p.m. 
                 | 
                From the west or north (Santa 
                  Ysabel and Warner Springs), take Hwy 78 through Santa Ysabel 
                  toward Julian. Wynola Pizza Express is on the left just north 
                  of the Wynola Rd intersection (3 miles from the Hwy 78/79 
                  intersection). 
                  From the east (Julian or Borrego Springs), take Hwy 78 
                  for 3.7 miles toward Santa Ysabel to Wynola Pizza Express, on 
                  the right side of the highway. | 
               
               
                |  
                   Ramona 
                    San Vicente Inn 
                    (San Vicente Room) 
                    24157 San Vicente Rd 
                    Ramona, CA 92065 
                    (760) 789-8290 
                 | 
                 
                   Tuesday 
                    Feb. 6, 2007 
                    7:00 to 9:00 p.m. 
                 | 
                From the west, take Hwy 
                  67 North and continue as it becomes Main St for 0.4 mi. Turn 
                  right at Dye Rd and continue for 1.8 mi. Dye Rd turns left and 
                  becomes Ramona St, continue for 0.4 mi. Turn right at Warnock 
                  Dr for 0.7 mi. Turn right at San Vicente Rd; continue for 4.6 
                  miles. Pass the tennis courts to the parking lot on your right. 
                  From the east,  take SR 78 through central Ramona and 
                  turn south onto 10th St. 10th becomes San Vicente Rd; continue 
                  6.6 mi. from Main St to San Vicente Inn on your right. | 
               
               
                |  
                   Boulevard 
                    Boulevard Fire Department 
                    39223 Highway 94 
                    Boulevard, CA 91905 
                    (619) 766-4633 
                 | 
                 
                   Wednesday 
                    Feb. 7, 2007 
                    1:00 to 3:00 p.m. 
                 | 
                From the east or west, 
                  take I-8 to the Hwy 94/Boulevard exit. Turn south on Hwy 94, 
                  then right on Old Highway 80. At the fork of Old Highway 80 
                  and Hwy 94 (Campo Rd), take the left fork along Campo Rd 
                  to the Fire Department. | 
               
               
                |  
                   Alpine  
                    Alpine Community Center (Sage Room) 
                    1830 Alpine Boulevard 
                    Alpine, CA 91901 
                    (619) 445-7330 
                 | 
                 
                   Wednesday 
                    Feb. 7, 2007 
                    6:30 to 8:30 p.m. 
                 | 
                From the west, take I-8 
                  to Tavern Rd exit. Turn right (south) on Tavern, then left on 
                  Alpine Boulevard, 0.2 miles to the Alpine Community Center on 
                  the left side of the street. 
                  From the east, take I-8 to Tavern Rd exit. Turn left 
                  (south) on Tavern, then left on Alpine Blvd, 0.2 miles to the 
                  Alpine Community Center on the left side of the street. | 
               
               
                |  
                   Borrego Springs 
                    Borrego Springs Resort 
                    1112 Tilting T Drive 
                    Borrego Springs, CA 92004 
                    (760) 767-5700 
                 | 
                 
                   Thursday 
                    Feb. 8, 2007 
                    2:30 to 4:00 p.m. 
                 | 
                From the west, take S22, 
                  which turns to the right and becomes Palm Canyon Dr. Proceed 
                  1.4 miles. At the turnaround, turn right (south) onto Borrego 
                  Springs Rd and drive south 1.8 miles. Turn left on Tilting T 
                  drive and follow its curves for 1.3 miles. 
                  From the east, take S22 which turns west in Borrego Springs 
                  as Palm Canyon Dr. Turn left on Borrego Valley Rd 
                  and your first right onto Tilting T Dr. 
                  Enter through the Borrego Springs Resort arches. The meeting 
                  room is in the main building. | 
               
               
                |  
                   Temecula 
                    City Hall (Council Chambers) 
                    43200 Business Park Drive 
                    Temecula, CA 92590 
                    (951) 693-3961 
                 | 
                 
                   Friday 
                    Feb. 9, 2007 
                    1:00 to 3:00 p.m. 
                 | 
                From the north, take I-15 
                  to Rancho California Rd in Temecula, then turn right. Continue 
                  until the third right on Business Park Dr. 
                  From the south, take I-15 to Rancho California Rd in 
                  Temecula, then turn left. Continue until the third right on 
                  Business Park Dr. | 
               
             
            How to Submit Scoping Comments 
            By Mail: If you send comments by U.S. mail, please use first-class 
              mail and be sure to include your name and a return address. Please 
              send written comments to: 
            Billie Blanchard, CPUC / Lynda Kastoll, BLM 
              c/o Aspen Environmental Group 
              235 Montgomery Street, Suite 935 
              San Francisco, CA 94104-3002  
             
             By Electronic Mail: E-mail communications are welcome; however, 
              please remember to include your name and return address in the e-mail 
              message. E-mail messages should be sent to sunrise@aspeneg.com. 
            By Fax: You may fax your comment letter to our information 
              line at (866) 711-3106. Please remember to include your name and 
              return address in the fax, to write legibly, and use black or blue 
              ink. 
            September/October 2006 Scoping 
            On August 31, 2006, the BLM published its Notice 
              of Intent to prepare an Environmental Impact Statement in the 
              Federal Register (Volume 71, No. 169, page 51848). On 
              September 15, 2006, the CPUC issued a Notice 
              of Preparation/Notice of Public Scoping Meetings for an Environmental 
              Impact Report/Environmental Impact Statement. In early October 2006, 
              the CPUC and BLM held a series of seven public scoping meetings 
              in Imperial and San Diego Counties to take public comment on the 
              scope and content of the environmental document. The scoping comment 
              period ended on October 20, 2006. 
            A Scoping Report (Part 1) was 
              prepared and was sent to all repositories on November 29, 
              2006; see the list of available documents below. The Scoping Report 
              includes a copy of every letter submitted, as well as transcripts 
              of the public scoping meetings and summaries of issues raised during 
              scoping. 
            A second Scoping Report will be prepared in March 2007, summarizing 
              all comments received (including oral comments made at the Public 
              Meetings on Alternatives). This report will be posted on this website 
              and copies will be placed in local document 
              repository sites. 
            Documents Available 
            The following documents are available 
              at 28 libraries and offices in the 
              project area. 
              SDG&E's 
              Application and Proponent's Environmental Assessment (August 4, 
              2006). 
              Notice of Intent 
              (August 31, 2006) 
              Notice of Preparation 
              (NOP) (September 15, 2006) 
             
               
                Figure 1. 
                  Proposed Project Overview 
                  Figure 2. Imperial Valley 
                  Link 
                  Figure 3. Anza-Borrego Link 
                  Figure 4A. Central Link 
                  Figure 4B. Proposed Central 
                  East Substation 
                  Figure 5A. Inland Valley 
                  Link 
                  Figure 5B. Detail of Ramona 
                  Area 
                  Figure 6A. Coastal Link 
                  Figure 6B. Rancho Peñasquitos 
                  Detail 
                  Figure 7. SDG&E Alternatives 
                  Fully Evaluated and Carried Forward in PEA 
                  Figure 8. SDG&E Alternatives 
                  Considered and Eliminated 
               
             
              Scoping Report, Part 1 
              (November 29, 2006)  
            Data Requests 
            The EIR/EIS Team will submit Data Requests to SDG&E when it 
              needs specific information to support EIR/EIS preparation. These 
              requests will be made available here at the time they are issued. 
              Data requests submitted to SDG&E to date are provided below. 
              Responses to these data requests can be found at SDG&E's 
              website. 
             
              Data Request No. 1 (September 
                27, 2006) 
                Data Request No. 2 (November 15, 
                2006)  
                Data Request No. 3 (November 21, 
                2006) 
                Data Request No. 4 (December 6, 
                2006) 
                Data Request No. 5 (January 8, 
                2007) 
                Data Request No. 6 (January 26, 
                2007) 
                Data Request No. 7 (February 1, 
                2007)  
             
            For Additional Information 
            To request additional information or to be added to the mailing 
              list, please contact us by email, fax, or phone, as follows: 
            
            The CPUC's Project Manager is: 
            Billie Blanchard, CPUC Project Manager 
              California Public Utilities Commission 
              505 Van Ness Avenue 
              San Francisco CA 94102 
              Tel. (415) 703-2068 
              Fax (415) 703-2200 
              Email:  bcb@cpuc.ca.gov 
           |