  
             Notice of Availability | 
        
         
          | Title Page | 
        
 
          |  Executive 
            Summary | 
        
 
          |   | 
           
             ES.1. Introduction/Background 
              ES.2. Summary of Draft EIR/EIS Conclusions: Environmentally Superior 
              Alternative 
              ES.3. Proposed Project and Project Objectives 
              ES.4. Summary of Public Involvement Activities 
              ES.5. Impacts of the Proposed Project 
              ES.6. Alternatives to the Proposed Project 
              ES.7. Comparison of Proposed Project and Retained Alternatives to 
              Determine Overall Environmentally Superior Alternatives 
              ES.8. Impact Summary Tables 
              Fig. 
              ES-1. Proposed Project with Connected Actions and Future System 
              Expansions 
              Fig. 
              ES-2. Components of New In-Area All-Source and Renewable Generation 
              Alternatives 
              Fig. 
              ES-3. LEAPS Transmission and Generation Alternatives 
              Fig. 
              ES-4. Environmentally Superior Northern and Southern Routes 
              Fig. 
              ES-5. Imperial Valley Link 
              Fig. ES-6. 
              Anza-Borrego Link 
              Fig. ES-7. 
              Central Link 
              Fig. 
              ES-8. Inland Valley Link 
              Fig. ES-9. 
              Coastal Link 
              Fig. 
              ES-10. Alternatives Retained 
              Fig. 
              ES-11. Alternatives Eliminated 
              Fig. 
              ES-12. Imperial Valley Link - Alternatives Retained 
              Fig. 
              ES-13. Alternatives Retained in Anza-Borrego Link 
              Fig. ES-14. 
              Alternatives Retained in Central Link 
              Fig. 
              ES-15. Alternatives Retained in Inland Valley Link 
              Fig. ES-16. 
              Alternatives Retained in Coastal Link 
              Fig. ES-17. 
              SWPL Alternatives Retained  
            | 
        
 
          | A. | 
          Introduction | 
        
 
          |   | 
          A.1. Overview of Proposed 
            Project 
            A.2. Purpose and Need for the Proposed Project 
            A.3. Procurement and Resource Adequacy 
            A.4. SDG&E's Electric Transmission System 
            A.5. Renewable Energy in the Imperial Valley 
            A.6. Agency Use of This Document 
            A.7. Reader's Guide to This EIR/EIS 
            A.8. References  | 
        
 
          | B. | 
          Project 
            Description (3.2MB) | 
        
 
          |   | 
          B.1. Introduction 
            B.2. Overview of the Proposed Project 
            B.3. Proposed Project Components 
            B.4. Construction Activities and Procedures 
            B.5. Operation and Maintenance 
            B.6. Connected Actions and Indirect Effects 
            B.7. Applicant Proposed Measures 
            B.8. References 
             Fig. 
            B-1. Proposed Project Overview 
            Fig. 
            B-2. Proposed Project Links 
            Fig. B-3. 
            Imperial Valley Link 
            Fig. B-4. Anza-Borrego 
            Link 
            Fig. B-4a. 
            Anza-Borrego ROW History of Surveys 
            Fig. B-5. Central 
            Link 
            Fig. B-6. 
            Inland Valley Link 
            Fig. B-7. 
            Inland Valley Link Detail 
            Fig. B-8. Coastal 
            Link 
            Fig. B-9. 
            Coastal Link Detail 
            Fig. B-10. 
            Other System Upgrades 
            Fig. B-11. 
            Sycamore Canyon - Elliot Substation Reconductor 
            Fig. 
            B-12a. 230 kV Transmission System Expansion 
            Fig. 
            B-12b. Future Transmission System Expansion: 500 kV Central East 
            to Riverside 
            Fig. B-13. Typical 500 kV Single-Circuit Lattice Tower: Imperial Valley 
            and Central Links* 
            Fig. B-14. Typical 500 kV Single-Circuit Tubular Steel Pole: Imperial 
            Valley Link* 
            Fig. B-15. Typical 500 kV Single-Circuit Steel H-Frame Tower: Imperial 
            Valley and Anza-Borrego Links* 
            Fig. B-16. Typical 230 kV Double-Circuit Tubular Lattice Tower: Central, 
            Inland Valley, and Coastal Links* 
            Fig. B-17. Typical 230 kV Double-Circuit Tubular Steel Pole: Central, 
            Inland Valley, and Coastal Links* 
            Fig. B-18. Typical 230 kV Single-Circuit Steel Transition Tower (Cable 
            Pole): Inland Valley and Coastal Links* 
            Fig. B-19. Typical 500 kV Single-Circuit Lattice Tower with 69 kV 
            or 92 kV Underbuild: Anza-Borrego and Central Links* 
            Fig. B-20. Typical 69 kV Double-Circuit Tubular Steel Pole: Central 
            Link* 
            Fig. B-21. Typical 69 kV Single-Circuit Wood Transition Tower (Cable 
            Pole): Anza-Borrego Link* 
            Fig. B-22. Typical 69 kV Single-Circuit Steel Transition Tower (Cable 
            Pole)* 
            Fig. B-23. Typical 92 kV Single-Circuit Steel Transition Tower (Cable 
            Pole): Anza-Borrego Link* 
            Fig. B-24. Typical 230 kV Duct Bank: Inland Valley and Coastal Links 
            (vertical configuration)* 
            Fig. B-25. Typical 69 or 92 kV Duct Bank: Anza-Borrego Link* 
            Fig. B-26. 
            Typical 230 kV Duct Bank: Coastal Link (horizontal configuration) 
            Fig. B-27. Typical 69 kV Vault: Anza-Borrego Link* 
            Fig. B-28. Typical 92 kV Vault: Anza-Borrego Link* 
            Fig. B-29. Typical 230 kV Vault: Inland Valley and Coastal Links* 
            Fig. 
            B-30. Imperial Valley Substation: Proposed Modifications 
            Fig. 
            B-31. Central East Substation: 500/230/12 kV Equipment One Line 
            Diagram 
            Fig. 
            B-32. Central East Substation: 500/230 kV Switchyard: General 
            Arrangement 
            Fig. 
            B-33. Central East Substation: 500/230 kV Switchyard: Section 
            A-A 
            Fig. 
            B-34. Central East Substation: 500/230 kV Switchyard: Section 
            B-B & D-D 
            Fig. 
            B-35. Central East Substation: 500/230 kV Switchyard: Section 
            C-C 
            Fig. 
            B-36. Central East Substation: Grading Plan 
            Fig. 
            B-37. Central East Substation: Landscape Plan 
            Fig. 
            B-38. Sycamore Canyon Substation: Proposed Modifications 
            Fig. B-39. 
            Peñasquitos Substation: Proposed Modifications 
            Fig. B-40. 
            San Luis Rey Substation: Proposed Modifications 
            Fig. B-41. 
            South Bay Substation: Proposed Modifications 
            Fig. 
            B-42a. Construction Schedule 
            Fig. 
            B-42b. Construction Schedule 
            Fig. 
            B-42c. Construction Schedule 
            Fig. 
            B-43. Construction Labor 
            Fig. 
            B-44a. Connected Actions, SES Solar Two Project and 230 kV Transmission 
            Line 
            Fig. 
            B-44b. Connected Actions, SES Solar Two Project Site 
            Fig. 
            B-44c. Connected Actions, SES Solar Two Project Components 
            Fig. 
            B-45. Connected Actions, IID Transmission System Upgrades 
            Fig. 
            B-46. Connected Actions: Esmeralda-San Felipe Geothermal Project 
            Fig. 
            B-47. Connected Actions: Jacumba Substation 
            Fig. 
            B-48. Indirect Action: La Rumorosa Wind Project 
            Fig. 
            B-49. Indirect Action: Border Region Wind Power 
            Fig. 
            B-50. Indirect Action: Views from La Rumorosa | 
        
 
          | C. | 
          Alternatives | 
        
 
          |   | 
          C.1. Alternatives Development 
            and Screening Process 
            C.2. Alternatives Screening Methodology 
            C.3. Summary of Screening Results 
            C.4. Alternatives Evaluated in this EIR/EIS 
            C.5. Alternatives Eliminated from Full EIR/EIS Evaluation 
            C.6. No Project/No Action Alternative 
            C.7. References 
            Fig. 
            C-1. Imperial Valley Link Alternatives Retained 
            Fig. C-2. 
            Anza-Borrego Link Alternatives Considered 
            Fig. C-3. 
            Central Link Alternatives Retained 
            Fig. C-4. 
            Inland Valley Link Alternatives Retained 
            Fig. C-5. 
            Coastal Link Alternatives Retained 
            Fig. C-6. 
            Southwest Powerlink Alternatives Retained 
            Fig. C-7. 
            System Alternatives Retained 
            Fig. C-8. 
            Components of New In-Area All-Source and Renewable Generation Alternatives 
            Fig. 
            C-9. Imperial Valley Link Alternatives Eliminated 
            Fig. 
            C-10. Anza-Borrego Link Alternatives Eliminated 
            Fig. C-11. 
            Central Link Alternatives Eliminated 
            Fig. 
            C-12. Inland Valley Link Alternatives Eliminated 
            Fig. C-13. 
            Coastal Link Alternatives Eliminated 
            Fig. C-14. 
            SWPL Alternatives Eliminated 
            Fig. C-15. 
            System Alternatives Eliminated 
            Fig. C-16. DG Penetration Projections (Nameplate Capacity)* | 
        
 
          | D.1 | 
          Introduction 
            to Environmental Analysis | 
        
 
          |   | 
          D.1.1. Organization of Each 
            Section 
            D.1.2. Environmental Assessment Methodology 
            Fig. 
            D.1-1. Imperial Valley Link: Alternatives Retained 
            Fig. 
            D.1-2. Anza-Borrego Link: Alternatives Retained 
            Fig. 
            D.1-3. Santa Ysabel Valley: Alternatives Retained 
            Fig. D.1-4. 
            Mesa Grande Alternative 
            Fig. D.1-5. CNF Existing 
            69 kV Route Alternative 
            Fig. D.1-6. 
            Oak Hollow Road Underground Alternative 
            Fig. D.1-7. 
            San Vicente Road Transition Alternative 
            Fig. D.1-8. 
            Chuck Wagon Road Alternative 
            Fig. 
            D.1-9. Pomerado Road to Miramar Area North Alternative (East) 
            Fig. 
            D.1-10. Pomerado Road to Miramar Area North Alternative (West) 
            Fig. D.1-11. 
            Los Peñasquitos Canyon Preserve-Mercy Road Alternative 
            Fig. 
            D.1-12. Black Mountain to Park Village Road Underground Alternative 
            Fig. 
            D.1-13. Coastal Link System Upgrades 
            Fig. 
            D.1-14. Top of the World Substation Alternative | 
        
 
          | D.2 | 
          Biological 
            Resources | 
        
 
          |   | 
          D.2.1. Regional Setting and 
            Approach to Data Collection 
            D.2.2. Environmental Setting for the Proposed Project 
            D.2.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.2.4. Significance Criteria and Approach to Impact Assessment 
            D.2.5. Vegetation 
            D.2.6. Jurisdictional Waters and Wetlands 
            D.2.7. Introduction of Invasive, Non-native, or Noxious Plant Species 
            D.2.8. Dust 
            D.2.9. Listed or Sensitive Plant Species 
            D.2.10. Construction Activities: Disturbance to Wildlife 
            D.2.11. Listed or Sensitive Wildlife Species 
            D.2.12. Nesting Birds 
            D.2.13. Wildlife Corridors, Movement of Fish, and/or Nursery Sites 
            D.2.14. Bird Electrocution and/or Collision 
            D.2.15. Increased Predation of Listed and Sensitive Wildlife Species 
            by Ravens 
            D.2.16. Maintenance Activities: Disturbance to Wildlife and Wildlife 
            Mortality 
            D.2.17. Other System Upgrades 
            D.2.18. Future Transmission System Expansion 
            D.2.19. Connected Actions and Indirect Effects 
            D.2.20. Overall Biological Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.2.21. Imperial Valley Link Alternatives Impacts and Mitigation Measures 
            D.2.22. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.2.23. Central Link Alternatives Impacts and Mitigation Measures 
            D.2.24. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.2.25. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.2.26. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.2.27. Mitigation Monitoring, Compliance, and Reporting Table 
            D.2.28. References 
            Fig. 
            D.2-1. Biological Resources Overview: Imperial Valley Link 
            Fig. 
            D.2-2. Biological Resources Overview: Anza-Borrego Link 
            Fig. 
            D.2-3. Biological Resources Overview: Central Link 
            Fig. 
            D.2-4. Biological Resources Overview: Inland Valley Link 
            Fig. 
            D.2-5. Biological Resources Overview: Coastal Link 
            Fig. 
            D.2-6. Biological Resources Overview: Sycamore Canyon-Elliot Substation 
            Reconductor 
            Fig. D.2-7. 
            Sample Proposed Project Biological Resources/Impacts Map  | 
        
 
          | D.3 | 
          Visual 
            Resources | 
        
 
          |   | 
          D.3.1. Regional Setting and 
            Approach to Baseline Analysis 
            D.3.2. Environmental Setting for the Proposed Project 
            D.3.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.3.4. Significance Criteria and Approach to Impact Assessment 
            D.3.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.3.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.3.7. Central Link Impacts and Mitigation Measures 
            D.3.8. Inland Valley Link Impacts and Mitigation Measures 
            D.3.9. Coastal Link Impacts and Mitigation Measures 
            D.3.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.3.11. Future Transmission System Expansion 
            D.3.12. Connected Actions and Indirect Effects 
            D.3.13. Overall Visual Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.3.14. Imperial Valley Link Alternatives Impacts and Mitigation Measures 
            D.3.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.3.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.3.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.3.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.3.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.3.20. Mitigation Monitoring, Compliance, and Reporting Table 
            D.3.21. References 
            Fig. 
            D.3-1A. Visual Resources: Imperial Valley Link 
            Fig. 
            D.3-1B. Visual Resources: Anza-Borrego Link 
            Fig. D.3-1C. 
            Visual Resources: Central Link 
            Fig. 
            D.3-1D. Visual Resources: Inland Valley Link 
            Fig. D.3-1E. 
            Visual Resources: Coastal Link 
            Fig. 
            D.3-2A. Key Viewpoint 1 - Proposed Project - Interstate 8 - Existing 
            Condition 
            Fig. D.3-3A/B. Key 
            Viewpoint 2 - Proposed Project - El Centro Agriculture - Existing 
            Condition and Simulation 
            Fig. D.3-4A/B. Key Viewpoint 
            3 - Proposed Project - BLM Road 326 - Existing Condition and Simulation 
            Fig. D.3-5A/B. Key Viewpoint 
            4 - Proposed Project - SR78/86 - Existing Condition and Simulation 
            Fig. D.3-6A. 
            Key Viewpoint 5 - Proposed Project - Old Kane Springs Road - Existing 
            Condition 
            Fig. D.3-6B. 
            Key Viewpoint 5B - Proposed Project - Old Kane Springs Road - Simulation 
            Fig. D.3-7A. 
            Key Viewpoint 6 - Proposed Project - SR78 The Narrows - Existing Condition 
            Fig. D.3-7B. 
            Key Viewpoint 6 - Proposed Project - SR78 The Narrows - Simulation 
            Fig. D.3-8A/B. Key Viewpoint 
            7 - Proposed Project - Mine Wash Road - Existing Condition and Simulation 
            Fig. D.3-9A. 
            Key Viewpoint 8 - Proposed Project - Kenyon Overlook - Existing Condition 
            Fig. D.3-9B. 
            Key Viewpoint 8 - Proposed Project - Kenyon Overlook - Simulation 
            Fig. D.3-10A. 
            Key Viewpoint 9 - Proposed Project - Cactus Loop Trail - Existing 
            Condition 
            Fig. D.3-10B. 
            Key Viewpoint 9 - Proposed Project - Cactus Loop Trail - Simulation 
            Fig. D.3-11A. 
            Key Viewpoint 10 - Proposed Project - Yaqui Well Primitive Camping 
            Area - Existing Condition 
            Fig. D.3-11B. 
            Key Viewpoint 10 - Proposed Project - Yaqui Well Primitive Camping 
            Area - Simulation 
            Fig. D.3-12A. 
            Key Viewpoint 11 - Proposed Project - Westbound SR78 - Existing Condition 
            Fig. D.3-12B. 
            Key Viewpoint 11 - Proposed Project - Westbound SR78 - Simulation 
            Fig. D.3-13A. 
            Key Viewpoint 12 - Proposed Project - Grapevine Canyon Road - Existing 
            Condition 
            Fig. D.3-13B. 
            Key Viewpoint 12 - Proposed Project - Grapevine Canyon Road - Simulation 
            Fig. D.3-14A. 
            Key Viewpoint 13 - Proposed Project - Upper Grapevine Canyon - Existing 
            Condition 
            Fig. D.3-14B. 
            Key Viewpoint 13 - Proposed Project - Upper Grapevine Canyon - Simulation 
            Fig. D.3-15A. 
            Key Viewpoint 14 - Proposed Project - Southbound SR79 - Existing Condition 
            Fig. D.3-15B. 
            Key Viewpoint 14 - Proposed Project - Southbound SR79 - Simulation 
            Fig. D.3-16A. 
            Key Viewpoint 15 - Proposed Project - Mesa Grande Road - Existing 
            Condition 
            Fig. D.3-16B. 
            Key Viewpoint 15 - Proposed Project - Mesa Grande Road - Simulation 
            Fig. D.3-17A. 
            Key Viewpoint 16 - Proposed Project - Inaja Monument Park Overlook 
            - Existing Condition 
            Fig. D.3-17B. 
            Key Viewpoint 16 - Proposed Project - Inaja Monument Park Overlook 
            - Simulation 
            Fig. D.3-18A/B. Key 
            Viewpoint 17 - Proposed Project - Westbound SR78 Santa Ysabel - Existing 
            Condition and Simulation 
            Fig. D.3-19A/B. Key 
            Viewpoint 18 - Proposed Project - BIA Road 51 - Existing Condition 
            and Simulation 
            Fig. D.3-20A/B. Key 
            Viewpoint 19 - Proposed Project - Northbound San Felipe Road - Existing 
            Condition and Simulation 
            Fig. D.3-21A. 
            Key Viewpoint 20 - Proposed Project - San Vicente Road - Existing 
            Condition 
            Fig. D.3-21B. 
            Key Viewpoint 20 - Proposed Project - San Vicente Road - Simulation 
            Fig. D.3-22A/B. Key 
            Viewpoint 21 - Proposed Project - Southbound SR67 - Existing Condition 
            and Simulation 
            Fig. D.3-23A/B. 
            Key Viewpoint 22 - Proposed Project - Cypress Canyon Park Drive - 
            Existing Condition and Simulation 
            Fig. D.3-24A/B. Key 
            Viewpoint 23 - Proposed Project - Spring Canyon Park - Existing Condition 
            and Simulation 
            Fig. D.3-25A. 
            Key Viewpoint 24 - Proposed Project - Calle De Las Rosas - Existing 
            Condition 
            Fig. D.3-25B. 
            Key Viewpoint 24 - Proposed Project - Calle De Las Rosas - Simulation 
            Fig. 
            D.3-25C. Chicarita Substation Cable Pole Relocated per Mitigation 
            Measure V-27a 
            Fig. D.3-26. 
            Key Viewpoint 25 - Proposed Project - The Preserve - Existing Condition 
            and Simulation 
            Fig. D.3-27. 
            Key Viewpoint 26 - Proposed Project - Corte Belleza - Existing Condition 
            and Simulation 
            Fig. 
            D.3-28. Visual Resources Impact Profile for the Proposed Project 
            Fig. D.3-29. 
            Key Viewpoint 27 - FTHL Eastern Alternative - Jeffrey Road - Existing 
            Condition 
            Fig. D.3-30A/B. Key 
            Viewpoint 28 - West of Dunaway Alternative - Dunaway Road - Existing 
            Condition and Simulation 
            Fig. D.3-31. 
            Key Viewpoint 29 - West Main Canal-Huff Road Alternative - Huff Road 
            - Existing Condition 
            Fig. D.3-32A. 
            Key Viewpoint 30 - Partial Underground 230 kV ABDSP SR78 to S2 - San 
            Felipe Substation - Existing Condition 
            Fig. D.3-32B. 
            Key Viewpoint 30 - Partial Underground 230 kV ABDSP SR78 to S2 - San 
            Felipe Substation - Simulation  
            Fig. D.3-33A/B. Key 
            Viewpoint 31 - Partial Underground 230 kV ABDSP SR78 to S2 - San Felipe 
            Road South - Existing View and Simulation 
            Fig. D.3-34A. 
            Key Viewpoint 32 - Partial Underground 230 kV ABDSP SR78 to S2 - San 
            Felipe Road North - Existing Condition 
            Fig. D.3-34B. 
            Key Viewpoint 32 - Partial Underground 230 kV ABDSP SR78 to S2 - San 
            Felipe Road North - Visual Simulation 
            Fig. D.3-35A/B. Key 
            Viewpoint 33 - Overhead 500 kV ABDSP within Existing ROW - SR78 - 
            Existing Condition and Simulation 
            Fig. D.3-36A/B. Key 
            Viewpoint 34 - Santa Ysabel Existing Right of Way - SR79 - Existing 
            Condition and Simulation 
            Fig. D.3-37A. 
            Key Viewpoint 35 - Santa Ysabel Partial Underground Alternative - 
            Mesa Grande Road - Existing Condition 
            Fig. D.3-37B. 
            Key Viewpoint 35 - Santa Ysabel Partial Underground Alternative - 
            Mesa Grande Road - Simulation  
            Fig. D.3-38A/B. Key 
            Viewpoint 36 - Mesa Grande Alternative - Mesa Grande Road - Existing 
            Condition and Simulation 
            Fig. D.3-38C. 
            Key Viewpoint 36 - Mesa Grande Alternative - Mesa Grande Road - Proposed 
            Project Visual Simulation Comparison 
            Fig. D.3-39. 
            Key Viewpoint 37 - Oak Hollow Underground Alternative - Oak Hollow 
            West Gate - Existing Condition 
            Fig. D.3-40. 
            Key Viewpoint 38 - San Vicente Road Transition Alternative - San Vicente 
            Road - Existing Condition 
            Fig. D.3-41. 
            Key Viewpoint 39 - Pomerado Road to Miramar Area North Alternative 
            - Rose Garden Court - Existing Condition 
            Fig. D.3-42. 
            Key Viewpoint 40 - Los Peñasquitos Canyon / Mercy Road Alternative 
            - Scripps Poway Parkway - Existing Condition 
            Fig. D.3-43A/B. Key 
            Viewpoint 41 - Top of the World Substation Alternative - Mataguay 
            Scout Ranch Flag Pole/Fire Ring Area - Existing Condition and Simulation 
            Fig. D.3-44. 
            Key Viewpoint 42 - Top of the World Substation Alternative - Mataguay 
            Scout Reservation Entrance - Existing Condition 
            Fig. D.3-45. 
            Key Viewpoint 43 - Top of the World Substation Alternative - Henshaw 
            Overlook - Existing Condition 
            Fig. D.3-46. 
            Map of Top of the World Transmission Line Connection Mitigation Route 
            Visual Resources Appendix: 
            - VR-1. 
            Summary of Key Viewpoint Analyses 
            - VR-2. 
            Scenic Quality Field Inventory  
            - VR-3. 
            Visual Resource Management Classification 
            - VR-4. 
            Visual Contrast Rating Data Sheet | 
        
 
          | D.4 | 
          Land 
            Use | 
        
 
          |   | 
           
             D.4.1. Regional Setting and Approach to Data Collection 
              D.4.2. Environmental Setting for the Proposed Project 
              D.4.3. Applicable Regulations, Plans, and Standards 
              D.4.4. Significance Criteria and Approach to Impact Assessment 
              Environmental Impacts and Mitigation Measures for the Proposed 
              Project 
              D.4.5. Imperial Valley Link Impacts and Mitigation Measures 
              D.4.6. Anza-Borrego Link Impacts and Mitigation Measures 
              D.4.7. Central Link Impacts and Mitigation Measures 
              D.4.8. Inland Valley Link Impacts and Mitigation Measures 
              D.4.9. Coastal Link Impacts and Mitigation Measures 
              D.4.10. Other System Upgrades - Impacts and Mitigation Measures 
              D.4.11. Future Transmission System Expansion 
              D.4.12. Connected Actions and Indirect Effects 
              D.4.13. Overall Land Use Impacts of Proposed Project 
              Environmental Impacts and Mitigation Measures for Alternatives 
              Along Proposed Project Route 
              D.4.14. Imperial Valley Link Alternatives Impacts and Mitigation 
              Measures 
              D.4.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
              D.4.16. Central Link Alternatives Impacts and Mitigation Measures 
              D.4.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
              D.4.18. Coastal Link Alternatives Impacts and Mitigation Measures 
              D.4.19. Top of the World Substation Alternative Impacts and Mitigation 
              Measures 
              D.4.20. Mitigation Monitoring, Compliance, and Reporting Table 
              D.4.21. References 
              Land Use Appendix: 
              - Fig. 
              D.4-1. Proposed Project and Imperial Valley Link Alternative 
              - Fig. 
              D.4-2. Proposed Project and Imperial Valley Link Alternative 
              - Fig. 
              D.4-3. Proposed Project and Imperial Valley Link Alternative 
              - Fig. 
              D.4-4. Proposed Project and Imperial Valley Link Alternative 
              - Fig. 
              D.4-5. Proposed Project and Imperial Valley Link Alternative 
              - Fig. 
              D.4-6. Proposed Project and Imperial Valley Link Alternative 
              - Fig. 
              D.4-7. Proposed Project and Imperial Valley/Anza-Borrego Link 
              Alternatives 
              - Fig. 
              D.4-8. Proposed Project and Anza-Borrego Link Alternative 
              - Fig. 
              D.4-9. Proposed Project and Anza-Borrego/Central Link Alternatives 
               
              - Fig. 
              D.4-10. Proposed Project and Anza-Borrego/Central Link Alternatives 
              - Fig. 
              D.4-11. Proposed Project and Central Link Alternative 
              - Fig. 
              D.4-12. Proposed Project and Central Link Alternative- 
               
              - Fig. 
              D.4-13. Proposed Project and Central/Inland Valley Link Alternatives 
              - Fig. 
              D.4-14. Proposed Project and Inland Valley Link Alternative 
              - Fig. 
              D.4-15. Proposed Project and Inland Valley Link Alternative 
              - Fig. 
              D.4-16. Proposed Project and Inland Valley/Coastal Link Alternatives 
              - Fig. 
              D.4-17. Proposed Project and Coastal Link Alternative 
              - Fig. 
              D.4-18. Proposed Project and Coastal Link Alternative 
              - Fig. 
              D.4-19. Proposed Project and Sycamore Canyon-Elliot Substation 
              Reconductor 
           | 
        
 
          | D.5 | 
          Wilderness 
            and Recreation | 
        
 
          |   | 
          D.5.1. Regional Setting and 
            Approach to Data Collection 
            D.5.2. Environmental Setting for the Proposed Project 
            D.5.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.5.4. Significance Criteria and Approach to Impact Assessment 
            D.5.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.5.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.5.7. Central Link Impacts and Mitigation Measures 
            D.5.8. Inland Valley Link Impacts and Mitigation Measures 
            D.5.9. Coastal Link Impacts and Mitigation Measures 
            D.5.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.5.11. Future Transmission System Expansion 
            D.5.12. Connected Actions and Indirect Effects 
            D.5.13. Overall Wilderness and Recreation Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.5.14. Imperial Valley Link Alternatives Impacts and Mitigation Measures 
            D.5.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.5.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.5.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.5.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.5.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.5.20. Mitigation Monitoring, Compliance, and Reporting Table 
            D.5.21. References 
            Fig. 
            D.5-1. Wilderness and Recreation Areas: Imperial Valley Link 
            Fig. D.5-2. 
            Wilderness and Recreation Areas: Anza-Borrego Link 
            Fig. D.5-3. 
            Wilderness and Recreation Areas: Central Link 
            Fig. 
            D.5-4. San Felipe Hills Wilderness Study Area 
            Fig. 
            D.5-5. Wilderness and Recreation Areas: Inland Valley Link 
            Fig. D.5-6. 
            Wilderness and Recreation Areas: Coastal Link 
            Fig. 
            D.5-7. Wilderness and Recreation Areas: Sycamore Canyon-Eliot 
            Substation Reconductor 
            Fig. 
            D.5-8. Digital Terrain Model/Viewshed Analysis in ABDSP: Proposed 
            Project 
            Fig. 
            D.5-9a. Wilderness and Recreation Areas: Mitigation Measure WR-4b 
            Modified ROW 
            Fig. D.5-9b. 
            Wilderness and Recreation Areas: Mitigation Measure WR-4b Modified 
            ROW 
            Fig. 
            D.5-10. Digital Terrain Model/Viewshed Analysis in ABDSP: Partial 
            Underground 230 kV ABDSP SR78 to S2 
            Fig. 
            D.5-11. Digital Terrain Model/Viewshed Analysis in ABDSP: Overhead 
            500 kV ABDSP within Existing ROW Alternative 
            Fig. 
            D.5-12. Tamarisk Grove Campground | 
        
 
          | D.6 | 
          Agriculture | 
        
 
          |   | 
           
             D.6.1. Regional Setting and Approach to Data Collection 
              D.6.2. Environmental Setting for the Proposed Project 
              D.6.3. Applicable Regulations, Plans, and Standards 
              Environmental Impacts and Mitigation Measures for the Proposed 
              Project 
              D.6.4. Significance Criteria and Approach to Impact Assessment 
              D.6.5. Imperial Valley Link Impacts and Mitigation Measures 
              D.6.6. Anza-Borrego Link Impacts and Mitigation Measures 
              D.6.7. Central Link Impacts and Mitigation Measures 
              D.6.8. Inland Valley Link Impacts and Mitigation Measures 
              D.6.9. Coastal Link Impacts and Mitigation Measures 
              D.6.10. Other System Upgrades Impacts and Mitigation Measures 
              D.6.11. Future Transmission System Expansion 
              D.6.12. Connected Actions and Indirect Effects 
              D.6.13. Overall Agriculture Impacts of Proposed Project 
              Environmental Impacts and Mitigation Measures for Alternatives 
              Along Proposed Project Route 
              D.6.14. Imperial Valley Link Alternatives Impacts and Mitigation 
              Measures 
              D.6.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
              D.6.16. Central Link Alternatives Impacts and Mitigation Measures 
              D.6.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
              D.6.18. Coastal Link Alternatives Impacts and Mitigation Measures 
              D.6.19. Top of the World Substation Alternative 
              D.6.20. Mitigation Monitoring, Compliance, and Reporting Table 
              D.6.21. References 
              Agriculture Appendix: 
              - Fig. 
              D.6-1. Proposed Project and Imperial Valley Link Alternatives 
              - Fig. 
              D.6-2.Proposed Project and Imperial Valley Link Alternatives 
               
              - Fig. 
              D.6-3.Proposed Project and Imperial Valley Link Alternatives 
               
              - Fig. 
              D.6-4.Proposed Project and Imperial Valley Link Alternatives 
               
              - Fig. 
              D.6-5.Proposed Project and Imperial Valley Link Alternatives 
               
              - Fig. 
              D.6-6.Proposed Project and Imperial Valley Link Alternatives 
               
              - Fig. 
              D.6-7. Proposed Project and Imperial Valley/Anza-Borrego Link 
              Alternatives 
              - Fig. 
              D.6-8. Proposed Project and Anza-Borrego Link Alternatives 
              - Fig. 
              D.6-9. Proposed Project and Anza-Borrego Link Alternatives 
              - Fig. 
              D.6-10. Proposed Project and Anza-Borrego/Central Link Alternatives 
              - Fig. 
              D.6-11. Proposed Project and Central Link Alernatives 
              - Fig. 
              D.6-12. Proposed Project and Central Link Alernatives 
              - Fig. 
              D.6-13. Proposed Project and Inland Valley Link Alternatives 
              - Fig. 
              D.6-14. Proposed Project and Inland Valley Link Alternatives 
              - Fig. 
              D.6-15. Proposed Project and Inland Valley Link Alternatives 
              - Fig. 
              D.6-16. Proposed Project and Inland Valley/Coastal Link Alternatives 
              - Fig. 
              D.6-17. Proposed Project and Coastal Link Alternatives 
              - Fig. 
              D.6-18. Proposed Project and Coastal Link Alternatives 
              - Fig. 
              D.6-19. Sycamore Canyon-Elliot Substation Reconductor 
           | 
        
 
          | D.7 | 
          Cultural 
            and Paleontological Resources | 
        
 
          |   | 
          Cultural Resources 
            D.7.1. Approach to Data Collection 
            Environmental Setting for the Proposed Project - Cultural Resources 
            D.7.2. Imperial Valley Link 
            D.7.3. Anza-Borrego Link 
            D.7.4. Central Link 
            D.7.5. Inland Valley Link 
            D.7.6. Coastal Link 
            D.7.7. Applicable Regulations, Plans, and Standards 
            D.7.8. Significance Criteria and Approach to Impact Assessment 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project - Cultural Resources 
            D.7.9. Imperial Valley Link Impacts and Mitigation Measures 
            D.7.10. Anza-Borrego Link Impacts and Mitigation Measures 
            D.7.11. Central Link Impacts and Mitigation Measures 
            D.7.12. Inland Valley Link Impacts and Mitigation Measures 
            D.7.13. Coastal Link Impacts and Mitigation Measures 
            D.7.14. Other System Upgrades - Impacts and Mitigation Measures 
            D.7.15. Future Transmission System Expansion - Cultural Resources 
            D.7.16. Connected Actions and Indirect Effects - Cultural Resources 
            D.7.17. Overall Impacts of Proposed Project - Cultural Resources 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route - Cultural Resources 
            D.7.18. Imperial Valley Link Alternatives Impacts and Mitigation Measures 
            D.7.19. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.7.20. Central Link Alternatives Impacts and Mitigation Measures 
            D.7.21. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.7.22. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.7.23. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            Paleontological Resources - Proposed Route and Northern Alternatives 
            D.7.24. Regional Setting and Approach to Data Collection 
            D.7.25. Environmental Setting for the Proposed Project 
            D.7.26. Applicable Regulations, Plans, and Standards 
            D.7.27. Significance Criteria and Approach to Impact Assessment 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project - Paleontological Resources 
            D.7.28. Imperial Valley Link Impacts and Mitigation Measures 
            D.7.29. Anza-Borrego Link Impacts and Mitigation Measures 
            D.7.30. Central Link Impacts and Mitigation Measures 
            D.7.31. Inland Valley Link Impacts and Mitigation Measures 
            D.7.32. Coastal Link Impacts and Mitigation Measures 
            D.7.33. Other System Upgrades - Impacts and Mitigation Measures 
            D.7.34. Future Transmission System Expansion - Paleontological Resources 
            D.7.35. Connected Actions and Indirect Effects - Paleontology 
            D.7.36. Overall Paleontology Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route - Paleontological Resources 
            D.7.37. Imperial Valley Link Alternatives Impacts and Mitigation Measures 
            D.7.38. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.7.39. Central Link Alternatives Impacts and Mitigation Measures 
            D.7.40. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.7.41. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.7.42. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.7.43. Mitigation Monitoring, Compliance, and Reporting Table - Cultural 
            and Paleontological Resources 
            D.7.44. References for Cultural Resources 
            D.7.45. References for Paleontological Resources | 
        
 
          | D.8 | 
          Noise | 
        
 
          |   | 
          D.8.1. Regional Setting and 
            Approach to Data Collection 
            D.8.2. Environmental Setting for the Proposed Project 
            D.8.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.8.4. Significance Criteria and Approach to Impact Assessment 
            D.8.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.8.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.8.7. Central Link Impacts and Mitigation Measures 
            D.8.8. Inland Valley Link Impacts and Mitigation Measures 
            D.8.9. Coastal Link Impacts and Mitigation Measures 
            D.8.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.8.11. Future Transmission System Expansion 
            D.8.12. Connected Actions and Indirect Effects 
            D.8.13. Overall Noise Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.8.14. Imperial Valley Link Alternatives Impacts and Mitigation Measures 
            D.8.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.8.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.8.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.8.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.8.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.8.20. Mitigation Monitoring, Compliance, and Reporting Table 
            D.8.21. References 
            Fig. D.8-1. Typical Range of Common Sounds Heard in the Environment* 
            Fig. D.8-2. Noise Levels for Various Land Use Types* | 
        
 
          | D.9 | 
          Transportation 
            and Traffic | 
        
 
          |   | 
          D.9.1. Regional Setting and 
            Approach to Data Collection 
            D.9.2. Environmental Setting for the Proposed Project 
            D.9.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.9.4. Significance Criteria and Approach to Impact Assessment 
            D.9.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.9.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.9.7. Central Link Impacts and Mitigation Measures 
            D.9.8. Inland Valley Link Impacts and Mitigation Measures 
            D.9.9. Coastal Link Impacts and Mitigation Measures 
            D.9.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.9.11. Future Transmission System Expansion 
            D.9.12. Connected Actions and Indirect Effects 
            D.9.13. Overall Transportation and Traffic Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.9.14. Imperial Valley Link Alternatives Impacts and Mitigation Measures 
            D.9.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.9.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.9.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.9.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.9.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.9.20. Mitigation Monitoring, Compliance, and Reporting Table 
            D.9.21. References | 
        
 
          | D.10 | 
          Public 
            Health and Safety | 
        
 
          |   | 
          Environmental Contamination 
            D.10.1. Regional Setting and Approach to Data Collection 
            D.10.2. Environmental Setting for the Proposed Project - Environmental 
            Contamination 
            D.10.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project - Environmental Contamination 
            D.10.4. Significance Criteria and Approach to Impact Assessment 
            D.10.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.10.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.10.7. Central Link Impacts and Mitigation Measures 
            D.10.8. Inland Valley Link Impacts and Mitigation Measures 
            D.10.9. Coastal Link Impacts and Mitigation Measures 
            D.10.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.10.11. Future Transmission System Expansion 
            D.10.12. Connected Actions and Indirect Effects 
            D.10.13. Overall Public Health and Safety Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route - Environmental Contamination 
            D.10.14. Imperial Valley Link Alternatives Impacts and Mitigation 
            Measures 
            D.10.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.10.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.10.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.10.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.10.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            Electric and Magnetic Fields and Other Field Related Concerns 
            D.10.20. EMF in the Proposed Project Area 
            D.10.21. Scientific Background and Regulations Applicable to EMF 
            D.10.22. Consideration of Electric and Magnetic Fields 
            D.10.23. Other Field-Related Public Concerns 
            D.10.24. Significance Criteria and Approach to Impact Assessment - 
            Safety and Non Magnetic Field Electric Power Field Issues 
            D.10.25. Environmental Impacts and Mitigation Measures for the Proposed 
            Project and Alternatives - Safety and Non EMF Electric Power Field 
            Issues 
            D.10.26. Future Transmission System Expansion - EMF 
            D.10.27. Connected Actions and Indirect Effects - EMF 
            D.10.28. Overall Impacts of the Proposed Project - EMF and Field Related 
            Concerns 
            D.10.29. Mitigation Monitoring, Compliance, and Reporting Table 
            D.10.30. References for Contamination 
            D.10.31. References for EMF | 
        
 
          | D.11 | 
          Air 
            Quality | 
        
 
          |   | 
          D.11.1. Regional Setting and 
            Approach to Data Collection 
            D.11.2. Environmental Setting for the Proposed Project 
            D.11.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.11.4. Significance Criteria and Approach to Impact Assessment 
            D.11.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.11.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.11.7. Central Link Impacts and Mitigation Measures 
            D.11.8. Inland Valley Link Impacts and Mitigation Measures 
            D.11.9. Coastal Link Impacts and Mitigation Measures 
            D.11.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.11.11. Future Transmission System Expansion 
            D.11.12. Connected Actions and Indirect Effects 
            D.11.13. Overall Air Quality Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.11.14. Imperial Valley Link Alternatives Impacts and Mitigation 
            Measures 
            D.11.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.11.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.11.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.11.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.11.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.11.20. Mitigation Monitoring, Compliance, and Reporting Table 
            D.11.21. References 
            Fig. 
            D.11-1. Air Quality Management Districts and Class I Areas | 
        
 
          | D.12 | 
          Water Resources | 
        
 
          |   | 
          D.12.1. Regional Setting and 
            Approach to Data Collection 
            D.12.2. Environmental Setting for the Proposed Project 
            D.12.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.12.4. Significance Criteria and Approach to Impact Assessment 
            D.12.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.12.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.12.7. Central Link Impacts and Mitigation Measures 
            D.12.8. Inland Valley Link Impacts and Mitigation Measures 
            D.12.9. Coastal Link Impacts and Mitigation Measures 
            D.12.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.12.11. Future Transmission System Expansion 
            D.12.12. Connected Actions and Indirect Effects 
            D.12.13. Overall Water Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.12.14. Imperial Valley Link Alternatives Impacts and Mitigation 
            Measures 
            D.12.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.12.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.12.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.12.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.12.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.12.20. Mitigation Monitoring, Compliance, and Reporting Table 
            D.12.21. References 
            Figs. 
            D.12-1 and D.12-2: 
            - Fig. D.12.1. San Felipe Creek near the Narrows Substation, Anza-Borrego 
            Link 
            - Fig. D.12-2. View Across Santa Ysabel River, Inland Valley Link 
            Fig. D.12-3. Average Monthly Rainfall* 
            Fig. D.12-4. Anza-Borrego Link Rainfall/Runoff* 
            Fig. D.12-5. Inland Valley Link Rainfall/Runoff* 
            Fig. D.12-6. Summer Runoff for Santa Ysabel Creek* | 
        
 
          | D.13 | 
          Geology, 
            Mineral Resources, and Soils | 
        
 
          |   | 
          D.13.1. Regional Setting and 
            Approach to Data Collection 
            D.13.2. Environmental Setting for the Proposed Project 
            D.13.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.13.4. Significance Criteria and Approach to Impact Assessment 
            D.13.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.13.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.13.7. Central Link Impacts and Mitigation Measures 
            D.13.8. Inland Valley Link Impacts and Mitigation Measures 
            D.13.9. Coastal Link Impacts and Mitigation Measures 
            D.13.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.13.11. Future Transmission System Expansion 
            D.13.12. Connected Actions and Indirect Effects 
            D.13.13. Overall Geology Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.13.14. Imperial Valley Link Alternatives Impacts and Mitigation 
            Measures 
            D.13.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.13.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.13.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.13.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.13.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.13.20. Mitigation Monitoring, Compliance, and Reporting Table 
            D.13.21. References 
            Fig. D.13-1. Geologic Time Scale* 
            Fig. 
            D.13-2. Regional Active Faults and Historic Earthquakes 
            Fig. 
            D.13-3.. Estimated Peak Ground Accelerations 
            Fig. 
            D.13-4. Superstition Hills Fault Crossing 
            Fig. D.13-5. 
            Elmore Ranch Fault Crossing 
            Fig. D.13-6. 
            San Jacinto Fault Crossing 
            Fig. D.13-7. 
            Elsinore Fault Zone Crossing 
            Fig. 
            D.13-8. Fault Location Map for Central East Substation 
            Fig. 
            D.13-9. Earthquake Valley Fault Zone Crossing 
            Fig. 
            D.13-10. Santa Ysabel Alternatives Elsinore Fault Crossing | 
        
          D.14 | 
          Socioeconomics, 
            Services, and Utilities | 
        
 
          |   | 
          D.14.1. Regional Setting and 
            Approach to Data Collection 
            D.14.2. Environmental Setting for the Proposed Project 
            D.14.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.14.4. Significance Criteria and Approach to Impact Assessment 
            D.14.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.14.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.14.7. Central Link Impacts and Mitigation Measures 
            D.14.8. Inland Valley Link Impacts and Mitigation Measures 
            D.14.9. Coastal Link Impacts and Mitigation Measures 
            D.14.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.14.11. Future Transmission System Expansion 
            D.14.12. Connected Actions and Indirect Effects 
            D.14.13. Overall Socioeconomic Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.14.14. Imperial Valley Link Alternatives Impacts and Mitigation 
            Measures 
            D.14.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.14.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.14.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.14.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.14.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.14.20. Mitigation Monitoring, Compliance, and Reporting Table 
            D.14.21. References | 
        
 
          | D.15 | 
          Fire and 
            Fuels Management | 
        
 
          |   | 
          D.15.1. Introduction 
            D.15.2. Environmental Setting 
            D.15.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.15.4. Significance Criteria and Approach to Impact Assessment 
            D.15.5. Imperial Valley Link and Eastern Anza-Borrego Link 
            D.15.6. PFS 1 Ranchita Fireshed 
            D.15.7. PFS 2 San Felipe Fireshed 
            D.15.8. PFS 3 Santa Ysabel Fireshed 
            D.15.9. PFS 4 Ramona Fireshed 
            D.15.10. PFS 5 Poway Fireshed 
            D.15.11. PFS 6 Peñasquitos Fireshed 
            D.15.12. Other System Upgrades - Impacts and Mitigation Measures 
            D.15.13. Future Transmission System Expansion 
            D.15.14. Connected Actions and Indirect Effects 
            D.15.15. Overall Fire and Fuels Management Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.15.16. Imperial Valley Link Alternatives 
            D.15.17. Anza-Borrego Link Alternatives 
            D.15.18. Central Link Alternatives 
            D.15.19. Inland Valley Link Alternatives 
            D.15.20. Coastal Link Alternatives 
            D.15.21. Top of the World Substation Alternative 
            D.15.22. Mitigation Monitoring, Compliance, and Reporting Table 
            D.15.23. References 
            Fig. 
            D.15-1. Regional Fire Hazard Severity Zones 
            Fig. 
            D.15-2. 2003 and 2007 San Diego County Fires 
            Fig. 
            D.15-3. Sunrise Powerlink Proposed Project and Alternative Firesheds 
            Fig. D.15-4. Proposed Project Fireshed Wildfire History* 
            Fig. D.15-5. 
            PFS-1 Ranchita Fireshed Boundary and Proposed Project and Alternative 
            Project Routes 
            Fig. D.15-6. Ranchita Fireshed Wildfire History* 
            Fig. D.15-7. 
            PFS-2 San Felipe Fireshed Boundary and Proposed Project and Alternative 
            Project Routes 
            Fig. D.15-8. San Felipe Fireshed Wildfire History* 
            Fig. 
            D.15-9. PFS-3 Santa Ysabel Fireshed Boundary and Proposed Project 
            and Alternative Project Routes 
            Fig. D.15-10. Santa Ysabel Fireshed Wildfire History* 
            Fig. D.15-11. 
            PFS-4 Ramona Fireshed Boundary and Proposed Project and Alternative 
            Project Routes 
            Fig. D.15-12. Ramona Fireshed Wildfire History* 
            Fig. D.15-13. 
            PFS-5 Poway Fireshed Boundary and Proposed Project and Alternative 
            Project Routes 
            Fig. D.15-14. Poway Fireshed Wildfire History* 
            Fig. 
            D.15-15. PFS-6 Peñasquitos Fireshed Boundary and Proposed 
            Project and Alternative Project Routes 
            Fig. D.15-16. Peñasquitos Fireshed Wildfire History* 
            Fig. D.15-17. CCR Title 14 Section 1254 Minimum Clearances* 
            Fig. 
            D.15-18. PFS-1 Ranchita Fireshed Burn Probability Model 
            Fig. 
            D.15-19. PFS-1 Ranchita Fireshed Fire Behavior Trend Model 
            Fig. 
            D.15-20. PFS-1 Ranchita Fireshed Containment Conflict Model 
            Fig. 
            D.15-21. PFS-2 San Felipe Fireshed Burn Probability Model 
            Fig. 
            D.15-22. PFS-2 San Felipe Fireshed Fire Behavior Trend Model 
            Fig. 
            D.15-23. PFS-2 San Felipe Fireshed Wildfire Containment Conflict 
            Model 
            Fig. 
            D.15-24. PFS-3 Santa Ysabel Fireshed Burn Probability Model 
            Fig. 
            D.15-25. PFS-3 Santa Ysabel Fireshed Fire Behavior Trend Model 
            Fig. 
            D.15-26. PFS-3 Santa Ysabel Fireshed Wildfire Containment Conflict 
            Model 
            Fig. 
            D.15-27. PFS-4 Ramona Fireshed Burn Probability Model 
            Fig. 
            D.15-28. PFS-4 Ramona Fireshed Fire Behavior Trend Model 
            Fig. 
            D.15-29. PFS-4 Ramona Fireshed Wildfire Containment Conflict Model 
            Fig. 
            D.15-30. PFS-5 Poway Fireshed Burn Probability Model 
            Fig. 
            D.15-31. PFS-5 Poway Fireshed Fire Behavior Trend Model 
            Fig. 
            D.15-32. PFS-5 Poway Fireshed Wildfire Containment Conflict Model 
            Fig. 
            D.15-33. PFS-6 Peñasquitos Fireshed Burn Probability Model 
            Fig. 
            D.15-34. PFS-6 Peñasquitos Fireshed Fire Behavior Trend 
            Model 
            Fig. 
            D.15-35. PFS-6 Peñasquitos Fireshed Wildfire Containment 
            Conflict Model 
            Fig. 
            D.15-36. Ranchita Partial Underground ABDSP SR78 to S2 Alternative 
            Burn Probability Model 
            Fig. 
            D.15-37. Ranchita Partial Underground ABDSP SR78 to S2 Alternative 
            Overhead Portion Fire Behavior Trend Model 
            Fig. 
            D.15-38. Ranchita Partial Underground ABDSP SR78 to S2 Alternative 
            Wildfire Containment Conflict Model 
            Fig. 
            D.15-39. Santa Ysabel Existing ROW Alternative Burn Probability 
            Model 
            Fig. 
            D.15-40. Santa Ysabel Existing ROW Alternative Fire Behavior Trend 
            Model 
            Fig. 
            D.15-41. Santa Ysabel Existing ROW Alternative Wildfire Containment 
            Conflict Model 
            Fig. 
            D.15-42. Mesa Grande Alternative Fire Behavior Trend Model 
            Fig. 
            D.15-43. Chuck Wagon Road Alternative Burn Probability Model 
            Fig. 
            D.15-44. Chuck Wagon Road Alternative Fire Behavior Trend Model 
            Fig. 
            D.15-45. Chuck Wagon Road Alternative Wildfire Containment Conflict 
            Model 
            Fig. 
            D.15-46. Pomerado Road to Miramar Area North Alternative Burn 
            Probability Model 
            Fig. 
            D.15-47. Pomerado Road to Miramar Area North Alternative Fire 
            Behavior Trend Model 
            Fig. 
            D.15-48. Pomerado Road to Miramar Area North Alternative Wildfire 
            Containment Conflict Model 
            Fig. 
            D.15-49. Los Peñasquitos Canyon Preserve-Mercy Road Alternative 
            Burn Probability Model 
            Fig. 
            D.15-50. Top of the World Substation Alternative Burn Probability 
            Model 
            Fig. 
            D.15-51. Top of the World Substation Alternative Fire Behavior 
            Trend Model 
            Fig. 
            D.15-52. Top of the World Substation Alternative Wildfire Containment 
            Conflict Model | 
        
 
          | D.16. | 
          Policy 
            Consistency | 
        
 
          |   | 
          D.16.1. Introduction 
            D.16.2. CEQA/NEPA Requirements 
            D.16.3. Proposed Project and Alternatives Consistency Review 
            D.16.4. Consistency Determinations | 
        
 
          | D.17 | 
          Plan 
            Amendments | 
        
 
          |   | 
          D.17.1. 
            Federal and State Plan Descriptions 
            D.17.2. Plan Amendments Resulting from Proposed Project and Alternatives 
            Fig. D.17-1. BLM Planning Areas and Utility Corridors* 
            Fig. D.17-2. Cleveland National Forest Land Use Zones* 
            Fig. D.17-3. Cleveland National Forest Scenic Integrity Objectives* | 
        
 
          | E.1 | 
          Interstate 8 Alternative | 
        
 
          |   | 
           
             E.1.1. Description 
              of the Interstate 8 Alternative 
              Interstate 8 Alternative Substation 
              Interstate 8 Alternative Route Options 
              Forest Service Land Use Zones 
              Future Transmission System Expansion 
              E.1.2. Biological Resources 
              E.1.2.1. Regional Setting for All Southwest Powerlink Alternatives 
              E.1.2.2. Environmental Setting 
              E.1.2.3. Environmental Impacts and Mitigation Measures 
              E.1.2.4. Interstate 8 Alternative Substation 
              E.1.2.5. Interstate 8 Route Options 
              E.1.2.6. Future Transmission System Expansion for Interstate 8 Alternative 
              E.1.3. Visual Resources 
              E.1.3.1. Environmental Setting 
              E.1.3.2. Environmental Impacts and Mitigation Measures 
              E.1.3.3. Interstate 8 Alternative Substation 
              E.1.3.4. Interstate 8 Route Options 
              E.1.3.5. Future Transmission System Expansion for Interstate 8 Alternative 
              E.1.4. Land Use 
              E.1.4.1. Environmental Setting 
              E.1.4.2. Environmental Impacts and Mitigation Measures 
              E.1.4.3. Interstate 8 Alternative Substation 
              E.1.4.4. Interstate 8 Route Options 
              E.1.4.5. Future Transmission System Expansion for Interstate 8 Alternative 
              E.1.5. Wilderness 
              and Recreation 
              E.1.5.1. Environmental Setting 
              E.1.5.2. Environmental Impacts and Mitigation Measures 
              E.1.5.3. Interstate 8 Alternative Substation 
              E.1.5.4. Interstate 8 Route Options 
              E.1.5.5. Future Transmission System Expansion for Interstate 8 Alternative 
              E.1.6. Agriculture 
              E.1.6.1. Environmental Setting 
              E.1.6.2. Environmental Impacts and Mitigation Measures 
              E.1.6.3. Interstate 8 Alternative Substation 
              E.1.6.4. Interstate 8 Route Options 
              E.1.6.5. Future Transmission System Expansion for Interstate 8 Alternative 
              E.1.7. Cultural and Paleontological 
              Resources 
              Cultural Resources 
              E.1.7.1. Environmental Setting 
              E.1.7.2. Environmental Impacts and Mitigation Measures 
              E.1.7.3. Interstate 8 Alternative Substation 
              E.1.7.4. Interstate 8 Route Options 
              E.1.7.5. Future Transmission System Expansion for Interstate 8 Alternative 
              Paleontological Resources 
              E.1.7.6. Environmental Setting 
              E.1.7.7. Environmental Impacts and Mitigation Measures 
              E.1.7.8. Interstate 8 Alternative Substation 
              E.1.7.9. Interstate 8 Route Options 
              E.1.7.10. Future Transmission System Expansion for Interstate 8 
              Alternative 
              E.1.8. Noise 
              E.1.8.1. Environmental Setting 
              E.1.8.2. Environmental Impacts and Mitigation Measures 
              E.1.8.3. Interstate 8 Alternative Substation 
              E.1.8.4. Interstate 8 Route Options 
              E.1.8.5. Future Transmission System Expansion for Interstate 8 Alternative 
              E.1.9. Transportation and 
              Traffic 
              E.1.9.1. Environmental Setting 
              E.1.9.2. Environmental Impacts and Mitigation Measures 
              E.1.9.3. Interstate 8 Alternative Substation 
              E.1.9.4. Interstate 8 Route Options 
              E.1.9.5. Future Transmission System Expansion for Interstate 8 Alternative 
              E.1.10. Public Health and Safety 
              - Environmental Contamination 
              E.1.10.1. Environmental Setting 
              E.1.10.2. Environmental Impacts and Mitigation Measures 
              E.1.10.3. Interstate 8 Alternative Substation 
              E.1.10.4. Interstate 8 Route Options 
              E.1.10.5. Future Transmission System Expansion for Interstate 8 
              Alternative 
              E.1.11. Air Quality 
              E.1.11.1. Environmental Setting 
              E.1.11.2. Environmental Impacts and Mitigation Measures 
              E.1.11.3. Interstate 8 Alternative Substation 
              E.1.11.4. Interstate 8 Route Options 
              E.1.11.5. Future Transmission System Expansion for Interstate 8 
              Alternative 
              E.1.12. Water Resources 
              E.1.12.1. Environmental Setting 
              E.1.12.2. Environmental Impacts and Mitigation Measures 
              E.1.12.3. Interstate Alternative 8 Substation 
              E.1.12.4. Interstate 8 Route Options 
              E.1.12.5. Future Transmission System Expansion for Interstate 8 
              Alternative 
              E.1.13. Geology, Mineral Resources, 
              and Soils 
              E.1.13.1. Environmental Setting 
              E.1.13.2. Environmental Impacts and Mitigation Measures 
              E.1.13.3. Interstate 8 Alternative Substation 
              E.1.13.4. Interstate 8 Route Options 
              E.1.13.5. Future Transmission System Expansion for Interstate 8 
              Alternative 
              E.1.14. Socioeconomics 
              E.1.14.1. Environmental Setting 
              E.1.14.2. Environmental Impacts and Mitigation Measures 
              E.1.14.3. Interstate 8 Alternative Substation 
              E.1.14.4. Interstate 8 Route Options 
              E.1.14.5. Future Transmission System Expansion for Interstate 8 
              Alternative 
              E.1.15. Fire and 
              Fuels Management 
              E.1.15.1. Environmental Setting 
              E.1.15.2. Environmental Impacts and Mitigation Measures 
              E.1.15.3. Interstate 8 Alternative Substation 
              E.1.15.4. Interstate 8 Route Options 
              E.1.15.5. Future Transmission System Expansion for Interstate 8 
              Alternative 
              Fig. 
              E.1.1-1. SWPL Alternatives 
              Fig. 
              E.1.1-2a. Interstate 8 Alternative Detail 
              Fig. 
              E.1.1-2b. Interstate 8 Alternative Detail 
              Fig. 
              E.1.1-2c. Interstate 8 Alternative Detail 
              Fig. 
              E.1.1-2d. Interstate 8 Alternative Detail 
              Fig. 
              E.1.1-3. Interstate 8 Alternative Substation Detail 
              Fig. 
              E.1.1-4a. Interstate 8 Alternative: Campo North Route Option 
              Fig. 
              E.1.1-4b. Interstate 8 Alternative: Buckman Springs Options 
              Fig. 
              E.1.1-4c. Interstate 8 Alternative: South Buckman Springs Option 
              Fig. 
              E.1.1-4d. Interstate 8 Alternative: Chocolate Canyon Option 
              Fig. 
              E.1.1-5. Interstate 8 Alternative: Cleveland National Forest 
              Land Use Zones 
              Fig. 
              E.1.1-6. Future Transmission Systems for SWPL Alternatives 
              Fig. 
              E.1.2-1. Biological Resources Overview: Southwest Powerlink 
              Alternatives 
              Fig. 
              E.1.3-1. Visual Resources SWPL Alternatives 
              Fig. E.1.3-2A/B. 
              Key Viewpoint 44 - I-8 Alternative - Dunaway Staging Area - Existing 
              Condition and Simulation 
              Fig. E.1.3-3A/B. 
              Key Viewpoint 45 - I-8 Alternative - Yuha Desert I-8 Span - Existing 
              View and Simulation 
              Fig. E.1.3-4A. 
              Key Viewpoint 46 - I-8 Alternative - Plaster City West Staging Area 
              - Existing View 
              Fig. E.1.3-4B. 
              Key Viewpoint 46 - I-8 Alternative - Plaster City West Staging Area 
              - Visual Simulation 
              Fig. E.1.3-5A. 
              Key Viewpoint 47 - I-8 Alternative - Sugarloaf Mountain / I-8 - 
              Existing View 
              Fig. E.1.3-5B. 
              Key Viewpoint 47 - I-8 Alternative - Sugarloaf Mountain / I-8 - 
              Visual Simulation 
              Fig. E.1.3-6A/B. 
              Key Viewpoint 48 - I-8 Alternative - South of Table Mountain - Existing 
              View and Simulation 
              Fig. E.1.3-7A. 
              Key Viewpoint 49 - I-8 Alternative - Jacumba - Existing View 
              Fig. E.1.3-7B. 
              Key Viewpoint 49 - I-8 Alternative - Jacumba - Visual Simulation 
              Fig. E.1.3-8A. 
              Key Viewpoint 50 - I-8 Alternative - La Posta - Existing View 
              Fig. E.1.3-8B. 
              Key Viewpoint 50 - I-8 Alternative - La Posta - Visual Simulation 
              Fig. E.1.3-9A. 
              Key Viewpoint 51 - I-8 Alternative - Cottonwood Valley - Existing 
              View 
              Fig. E.1.3-9B. 
              Key Viewpoint 51 - I-8 Alternative - Cottonwood Valley - Visual 
              Simulation 
              Fig. E.1.3-10A. 
              Key Viewpoint 52 - I-8 Alternative - Interstate 8 Span - Existing 
              View 
              Fig. E.1.3-10B. 
              Key Viewpoint 52 - I-8 Alternative - Interstate 8 Span - Visual 
              Simulation 
              Fig. E.1.3-11A. 
              Key Viewpoint 53 - I-8 Alternative - Alpine Road Transition Structure 
              - Existing View 
              Fig. E.1.3-11B. 
              Key Viewpoint 53 - I-8 Alternative - Alpine Road Transition Structure 
              - Visual Simulation 
              Fig. 
              E.1.3-11C. Reroute per Mitigation Measure V-66a 
              Fig. E.1.3-12A. 
              Key Viewpoint 54 - I-8 Alternative - El Monte County Park - Existing 
              View 
              Fig. E.1.3-12B. 
              Key Viewpoint 54 - I-8 Alternative - El Monte County Park - Visual 
              Simulation 
              Fig. E.1.3-13A. 
              Key Viewpoint 55 - I-8 Alternative - Moreno Boulevard - Existing 
              View 
              Fig. E.1.3-13B. 
              Key Viewpoint 55 - I-8 Alternative - Moreno Boulevard - Visual Simulation 
              Fig. E.1.3-14A. 
              Buckman Springs Road - West Buckman Springs Alt. Existing View 
              Fig. E.1.3-14B. 
              Buckman Springs Road - West Buckman Springs Alt. Simulation 
              Fig. 
              E.1.3-14C. Buckman Springs Alternative Reroute per Mitigation 
              Measure V-69a 
              Fig. E.1.3-15A. 
              Key Viewpoint 57 - Buckman Springs Underground Option - Buckman 
              Springs Road Northbound I-8 On-Ramp - Existing View 
              Fig. E.1.3-15B. 
              Key Viewpoint 57 - Buckman Springs Underground Option - Buckman 
              Springs Road Northbound I-8 On-Ramp - Simulation  
              Fig. E.1.3-16A/B. 
              Key Viewpoint 58 - Campo North Option - Eastbound I-8 - Existing 
              View and Simulation 
              Fig. E.1.3-17A. 
              Key Viewpoint 59 - South Buckman Springs Option - Cameron Truck 
              Trail - Existing View 
              Fig. E.1.3-17B. 
              Key Viewpoint 59 - South Buckman Springs Option - Cameron Truck 
              Trail - Visual Simulation 
              Fig. 
              E.1.3-17C. South Buckman Springs Option Mitigation Reroute Map 
              Visual Appendix: 
              - VR-1: 
              Summary of Key Viewpoint Analyses 
              - VR-4: 
              Visual Contrast Rating Data Sheet 
              Land Use Appendix: 
              - Fig. 
              E.1.4-1. Interstate 8 Alternative 
              - Fig. E.1.4-2. 
              Interstate 8 Alternative 
              - Fig. E.1.4-3. 
              Interstate 8 Alternative 
              - Fig. E.1.4-4. 
              Interstate 8 Alternative 
              - Fig. E.1.4-5. 
              Interstate 8 Alternative 
              - Fig. E.1.4-6. 
              Interstate 8 Alternative 
              - Fig. E.1.4-7. 
              Interstate 8 Alternative 
              - Fig. E.1.4-8. 
              Interstate 8 Alternative 
              - Fig. E.1.4-9. 
              Interstate 8 Alternative 
              - Fig. E.1.4-10. 
              Interstate 8 Alternative 
              - Fig. E.1.4-11. 
              Interstate 8 Alternative 
              Fig. 
              E.1.5-1. Wilderness and Recreation Areas: Southwest Powerlink 
              Alternatives 
              Agriculture Appendix: 
              - Fig. 
              E.1.6-1. Interstate 8 Alternative 
              - Fig. E.1.6-2. 
              Interstate 8 Alternative 
              - Fig. E.1.6-3. 
              Interstate 8 Alternative 
              - Fig. E.1.6-4. 
              Interstate 8 Alternative 
              - Fig. E.1.6-5. 
              Interstate 8 Alternative 
              - Fig. E.1.6-6. 
              Interstate 8 Alternative 
              - Fig. E.1.6-7. 
              Interstate 8 Alternative 
              - Fig. E.1.6-8. 
              Interstate 8 Alternative 
              - Fig. E.1.6-9. 
              Interstate 8 Alternative 
              - Fig. E.1.6-10. 
              Interstate 8 Alternative 
              - Fig. E.1.6-11. 
              Interstate 8 Alternative 
              Fig. E.1.13-A. SWPL Tower in Mine Area* 
              Fig. E.1.13-1. 
              Yuha Wells Fault Crossing and Elsinore Fault Zone Vicinity 
              Fig. E.1.15-1. Interstate Alternative Overview Map* 
              Fig. E.1.15-2. Reported 13-Year Wildfire Ignition History in Boulevard 
              Fireshed* 
              Fig. E.1.15-3. Boulevard Fireshed 50-year Wildfire History* 
              Fig. E.1.15-4. Reported 13-Year Wildfire Ignition History in Alternative 
              Route La Posta Fireshed* 
              Fig. E.1.15-5. La Posta Fireshed 50-year Wildfire History* 
              Fig. E.1.15-6. Reported 13-Year Wildfire Ignition History in Alternative 
              Route Guatay Fireshed* 
              Fig. E.1.15-7. Guatay Fireshed 50-year Wildfire History* 
              Fig. E.1.15-8. Reported 13-Year Wildfire Ignition History in Alternative 
              Route Boulder Creek Fireshed* 
              Fig. E.1.15-9. Boulder Creek Fireshed 50-year Wildfire History* 
              Fig. E.1.15-10. Reported 13-Year Wildfire Ignition History in Alternative 
              Route El Capitan Fireshed* 
              Fig. E.1.15-11. El Capitan Fireshed 50-year Wildfire History* 
              Fig. 
              E.1.15-12. Boulevard Fireshed Interstate 8 Alternative Burn 
              Probability Model 
              Fig. 
              E.1.15-13. La Posta Fireshed Interstate 8 Alternative Burn Probability 
              Model 
              Fig. 
              E.1.15-14. Guatay Fireshed Interstate 8 Alternative Burn Probability 
              Model 
              Fig. 
              E.1.15-15. El Capitan Fireshed Interstate 8 Alternative Burn 
              Probability Model 
              Fig. 
              E.1.15-16. Boulevard Fireshed Interstate 8 Alternative Fire 
              Behavior Trend Model 
              Fig. 
              E.1.15-17. La Posta Fireshed Interstate 8 Alternative Fire Behavior 
              Trend Model 
              Fig. 
              E.1.15-18. Guatay Fireshed Interstate 8 Alternative Fire Behavior 
              Trend Model 
              Fig. 
              E.1.15-19. El Capitan Fireshed Interstate 8 Alternative Fire 
              Behavior Trend Model 
              Fig. 
              E.1.15-20. Boulevard Fireshed Interstate 8 Alternative Wildfire 
              Containment Conflict Model 
              Fig. 
              E.1.15-21. La Posta Fireshed Interstate 8 Alternative Wildfire 
              Containment Conflict Model 
              Fig. 
              E.1.15-22. Guatay Fireshed Interstate 8 Alternative Wildfire 
              Containment Conflict Model 
              Fig. 
              E.1.15-23. El Capitan Fireshed Interstate 8 Alternative Wildfire 
              Containment Conflict Model 
              Fig. 
              E.1.15-24. La Posta Fireshed Buckman Springs Underground Option 
              Burn Probability Model 
              Fig. 
              E.1.15-25. La Posta Fireshed West Buckman Springs Option Burn 
              Probability Model 
              Fig. 
              E.1.15-26. La Posta Fireshed West Buckman Springs Option Fire 
              Behavior Trend Model 
              Fig. 
              E.1.15-27. La Posta Fireshed West Buckman Springs Option Wildfire 
              Containment Conflict Model 
           | 
        
 
          | E.2 | 
          BCD Alternative | 
        
 
          |   | 
           
             E.2.1. Description 
              of the BCD Alternative 
              E.2.2. Biological Resources 
              E.2.2.1. Environmental Setting 
              E.2.2.2. Environmental Impacts and Mitigation Measures 
              E.2.2.3. BCD South Option 
              E.2.3. Visual Resources 
              E.2.3.1. Environmental Setting 
              E.2.3.2. Environmental Impacts and Mitigation Measures 
              E.2.3.3. BCD South Option 
              Visual Resources 
              Appendix: 
              - 
              VR-1: 
              Summary of Key Viewpoint Analyses 
              - VR-4: 
              Visual Contrast Rating Data Sheet 
              E.2.4. 
              Land Use 
              E.2.4.1. Environmental Setting 
              E.2.4.2. Environmental Impacts and Mitigation Measures 
              E.2.4.3. BCD South Option 
              E.2.5. Wilderness 
              and Recreation 
              E.2.5.1. Environmental Setting 
              E.2.5.2. Environmental Impacts and Mitigation Measures 
              E.2.5.3. BCD South Option 
              E.2.6. Agriculture 
              E.2.6.1. Environmental Setting 
              E.2.6.2. Environmental Impacts and Mitigation Measures 
              E.2.6.3. BCD South Option 
              E.2.7. Cultural and 
              Paleontological Resources 
              Cultural Resources 
              E.2.7.1. Environmental Setting 
              E.2.7.2. Environmental Impacts and Mitigation Measures 
              E.2.7.3. BCD South Option 
              Paleontological Resources 
              E.2.7.4. Environmental Setting 
              E.2.7.5. Environmental Impacts and Mitigation Measures 
              E.2.7.6. BCD South Option 
              E.2.8. Noise 
              E.2.8.1. Environmental Setting 
              E.2.8.2. Environmental Impacts and Mitigation Measures 
              E.2.8.3. BCD South Option 
              E.2.9. Transportation and 
              Traffic 
              E.2.9.1. Environmental Setting 
              E.2.9.2. Environmental Impacts and Mitigation Measures 
              E.2.9.3. BCD South Option 
              E.2.10. Public Health and Safety 
              - Contamination 
              E.2.10.1. Environmental Setting 
              E.2.10.2. Environmental Impacts and Mitigation Measures 
              E.2.10.3. BCD South Option 
              E.2.11. Air Quality 
              E.2.11.1. Environmental Setting 
              E.2.11.2. Environmental Impacts and Mitigation Measures 
              E.2.11.3. BCD South Option 
              E.2.12. Water Resources 
              E.2.12.1. Environmental Setting 
              E.2.12.2. Environmental Impacts and Mitigation Measures 
              E.2.12.3. BCD South Option 
              E.2.13. Geology, Mineral Resources, 
              and Soils 
              E.2.13.1. Environmental Setting 
              E.2.13.2. Environmental Impacts and Mitigation Measures 
              E.2.13.3. BCD South Option 
              E.2.14. Socioeconomics 
              E.2.14.1. Environmental Setting 
              E.2.14.2. Environmental Impacts and Mitigation Measures 
              E.2.14.3. BCD South Option 
              E.2.15. Fire and 
              Fuels Management 
              E.2.15.1. Environmental Setting 
              E.2.15.2. Environmental Impacts and Mitigation Measures 
              E.2.15.3. BCD South Option 
              Fig. E.2.1-1a. 
              BCD Alternative (east) 
              Fig. E.2.1-1b. 
              BCD Alternative (west) 
              Fig. E.2.1-2. 
              BCD South Option 
              Fig. E.2.1-3. 
              BCD Alternative: Cleveland National Forest Land Use Zones 
              Fig. E.2.3-1A. 
              Key Viewpoint 60 - BCD Alternative - McCain Valley Road - Existing 
              View 
              Fig. E.2.3-1B. 
              Key Viewpoint 60 - BCD Alternative - McCain Valley Road - Visual 
              Simulation 
              Fig. E.2.3-2A/B. 
              Key Viewpoint 61 - BCD Alternative - Carrizo Overlook - Existing 
              View and Simulation 
              Fig. E.2.3-3A/B. 
              Key Viewpoint 62 - BCD Alternative - McCain Valley North - Existing 
              View and Simulation 
              Fig. E.2.3-4A. 
              Key Viewpoint 63 - BCD Alternative - Pacific Crest Trail - Existing 
              View 
              Fig. E.2.3-4B. 
              Key Viewpoint 63 - BCD Alternative - Pacific Crest Trail - Visual 
              Simulation 
              Fig. E.2.3-5A. 
              Key Viewpoint 79 - BCD South Option - La Posta Truck Trail - Existing 
              View 
              Fig. E.2.3-5B. 
              Key Viewpoint 79 - BCD South Option - La Posta Truck Trail - Simulation 
               
              Land Use Appendix: 
              - Fig. 
              E.2.4-1. BCD Alternative 
              - Fig. 
              E.2.4-2. BCD 
              Alternative 
              - Fig. 
              E.2.4-3. BCD 
              Alternative 
              Agriculture Appendix: 
              - Fig. 
              E.2.6-1. BCD 
              Alternative 
              - Fig. 
              E.2.6.2. BCD 
              Alternative 
              - Fig. 
              E.2.6.3. BCD 
              Alternative 
              Fig. 
              E.2.9-1. Mitigation Measure T-10, Mitigation Reroute for BCD 
              South Option 
              Fig. 
              E.2.15-1. BCD Alternative Overview Map 
              Fig. 
              E.2.15-2. Boulevard Fireshed BCD Alternative Burn Probability 
              Model 
              Fig. 
              E.2.15-3. La Posta Fireshed BCD Alternative Burn Probability 
              Model 
              Fig. 
              E.2.15-4. Boulevard Fireshed BCD Alternative Fire Behavior Trend 
              Model 
              Fig. 
              E.2.15-5. La Posta Fireshed BCD Alternative Fire Behavior Trend 
              Model 
              Fig. 
              E.2.15-6. Boulevard Fireshed BCD Alternative Wildfire Containment 
              Conflict Model 
              Fig. 
              E.2.15-7. La Posta Fireshed BCD Alternative Wildfire Containment 
              Conflict Model 
              Fig. 
              E.2.15-8. La Posta Fireshed BCD South Option Burn Probability 
              Model 
              Fig. 
              E.2.15-9. La Posta Fireshed BCD South Option Fire Behavior Trend 
              Model 
              Fig. 
              E.2.15-10. La Posta Fireshed BCD South Option Wildfire Containment 
              Conflict Model 
           | 
        
 
          | E.3 | 
          Route D Alternative | 
        
 
          |   | 
           
             E.3.1. Description 
              of the Route D Alternative 
              E.3.2. Biological Resources 
              E.3.2.1. Environmental Setting 
              E.3.2.2. Environmental Impacts and Mitigation Measures 
              E.3.2.3. Central South Substation Alternative 
              E.3.2.4. Future Transmission System Expansion 
              E.3.3. Visual Resources 
              E.3.3.1. Environmental Setting 
              E.3.3.2. Environmental Impacts and Mitigation Measures 
              E.3.3.3. Central South Substation Alternative 
              E.3.3.4. Future Transmission System Expansion 
              E.3.4. Land Use 
              E.3.4.1. Environmental Setting 
              E.3.4.2. Environmental Impacts and Mitigation Measures 
              E.3.4.3. Central South Substation Alternative 
              E.3.4.4. Future Transmission System Expansion 
              E.3.5. Wilderness 
              and Recreation 
              E.3.5.1. Environmental Setting 
              E.3.5.2. Environmental Impacts and Mitigation Measures 
              E.3.5.3. Central South Substation Alternative 
              E.3.5.4. Future Transmission System Expansion 
              E.3.6. Agriculture 
              E.3.6.1. Environmental Setting 
              E.3.6.2. Environmental Impacts and Mitigation Measures 
              E.3.6.3. Central South Substation Alternative 
              E.3.6.4. Future Transmission System Expansion 
              E.3.7. Cultural and Paleontological 
              Resources 
              Cultural Resources 
              E.3.7.1. Environmental Setting 
              E.3.7.2. Environmental Impacts and Mitigation Measures 
              E.3.7.3. Central South Substation Alternative 
              E.3.7.4. Future Transmission System Expansion 
              Paleontological Resources 
              E.3.7.5. Environmental Setting 
              E.3.7.6. Environmental Impacts and Mitigation Measures 
              E.3.7.7. Central South Substation Alternative 
              E.3.7.8. Future Transmission System Expansion 
              E.3.8. Noise 
              E.3.8.1. Environmental Setting 
              E.3.8.2. Environmental Impacts and Mitigation Measures 
              E.3.8.3. Central South Substation Alternative 
              E.3.8.4. Future Transmission System Expansion 
              E.3.9. Transportation and 
              Traffic 
              E.3.9.1. Environmental Setting 
              E.3.9.2. Environmental Impacts and Mitigation Measures 
              E.3.9.3. Central South Substation Alternative 
              E.3.9.4. Future Transmission System Expansion 
              E.3.10. Public Health and Safety 
              - Contamination 
              E.3.10.1. Environmental Setting 
              E.3.10.2. Environmental Impacts and Mitigation Measures 
              E.3.10.3. Central South Substation Alternative 
              E.3.10.4. Future Transmission System Expansion 
              E.3.11. Air Quality 
              E.3.11.1. Environmental Setting 
              E.3.11.2. Environmental Impacts and Mitigation Measures 
              E.3.11.3. Central South Substation Alternative 
              E.3.11.4. Future Transmission System Expansion 
              E.3.12. Water Resources 
              E.3.12.1. Environmental Setting 
              E.3.12.2. Environmental Impacts and Mitigation Measures 
              E.3.12.3. Central South Substation Alternative 
              E.3.12.4. Future Transmission System Expansion 
              E.3.13. Geology, Mineral Resources, 
              and Soils 
              E.3.13.1. Environmental Setting 
              E.3.13.2. Environmental Impacts and Mitigation Measures 
              E.3.13.3. Central South Substation Alternative 
              E.3.13.4. Future Transmission System Expansion 
              E.3.14. Socioeconomics 
              E.3.14.1. Environmental Setting 
              E.3.14.2. Environmental Impacts and Mitigation Measures 
              E.3.14.3. Central South Substation Alternative 
              E.3.14.4. Future Transmission System Expansion 
              E.3.15. Fire and 
              Fuels Management 
              E.3.15.1. Environmental Setting 
              E.3.15.2. Environmental Impacts and Mitigation Measures 
              E.3.15.3. Central South Substation Alternative 
              E.3.15.4. Future Transmission System Expansion 
              Fig. 
              E.3.1-1a. Route D Alternative (MPs D-0 to D-8) 
              Fig. 
              E.3.1-1b. Route D Alternative (MPs D-8 to D-17.3) 
              Fig. 
              E.3.1-2. Central South Substation Alternative 
              Fig. E.3.1-3. 
              Route D Alternative: Cleveland National Forest Land Use Zones 
              Fig. E.3.3-1A. 
              Key Viewpoint 64 - Route D Alternative - Boulder Creek Road - Existing 
              View 
              Fig. E.3.3-1B. 
              Key Viewpoint 64 - Route D Alternative - Boulder Creek Road - Visual 
              Simulation 
              Fig. E.3.3-2A. 
              Key Viewpoint 65 - Route D Alternative - Cuyamaca Peak - Existing 
              View 
              Fig. E.3.3-2B. 
              Key Viewpoint 65 - Route D Alternative - Cuyamaca Peak - Visual 
              Simulation 
              Fig. E.3.3-3. 
              Key Viewpoint 66 - Route D Alternative - Inaja Monument Overlook 
              - Existing View and Simulation 
              Visual Appendix: 
              - VR-1: 
              Summary of Key Viewpoint Analyses 
              Land Use Appendix: 
              - Fig. 
              E.3.4-1. Route D Alternative 
              - Fig. 
              E.3.4-2. Route D Alternative 
              - Fig. 
              E.3.4-3. Route D Alternative 
              Agriculture Appendix: 
              - Fig. 
              E.3.6-1. Route D Alternative 
              - Fig. 
              E.3.6-2. Route D Alternative 
              - Fig. 
              E.3.6-3. Route D Alternative 
              Fig. 
              E.3.15-1. Route D Alternative Overview Map 
              Fig. E.3.15-2. Reported 13-Year Wildfire Ignition History in Alternative 
              Route Pine Hills Fireshed* 
              Fig. E.3.15-3. Pine Hills Fireshed 50-year Wildfire History* 
              Fig. 
              E.3.15-4. Boulder Creek Fireshed Route D Alternative Burn Probability 
              Model 
              Fig. 
              E.3.15-5. Pine Hills Fireshed Route D Alternative Burn Probability 
              Model 
              Fig. 
              E.3.15-6. Boulder Creek Fireshed Route D Alternative Fire Behavior 
              Trend Model 
              Fig. 
              E.3.15-7. Pine Hills Fireshed Route D Alternative Fire Behavior 
              Trend Model 
              Fig. 
              E.3.15-8. Boulder Creek Fireshed Route D Alternative Wildfire 
              Containment Conflict Model 
              Fig. 
              E.3.15-9. Pine Hills Fireshed Route D Alternative Wildfire Containment 
              Conflict Model 
           | 
        
 
          | E.4 | 
          Modified Route D Alternative | 
        
 
          |   | 
           
             E.4.1. Description 
              of the Modified Route D Alternative 
              E.4.2. Biological Resources 
              E.4.2.1. Environmental Setting 
              E.4.2.2. Environmental Impacts and Mitigation Measures 
              E.4.2.3. Modified Route D Substation 
              E.4.2.4. Star Valley Option 
              E.4.2.5. Future Transmission System Expansion 
              E.4.3. Visual Resources 
              E.4.3.1. Environmental Setting 
              E.4.3.2. Environmental Impacts and Mitigations Measures 
              E.4.3.3. Modified Route D Substation 
              E.4.3.4. Star Valley Option 
              E.4.3.5. Future Transmission System Expansion 
              E.4.4. Land Use 
              E.4.4.1. Environmental Setting 
              E.4.4.2. Environmental Impacts and Mitigation Measures 
              E.4.4.3. Modified Route D Alternative Substation 
              E.4.4.4. Star Valley Option 
              E.4.4.5. Future Transmission System Expansion 
              E.4.5. Wilderness 
              and Recreation 
              E.4.5.1. Environmental Setting 
              E.4.5.2. Environmental Impacts and Mitigation Measures 
              E.4.5.3. Modified Route D Alternative Substation 
              E.4.5.4. Star Valley Option 
              E.4.5.5. Future Transmission System Expansion 
              E.4.6. Agriculture 
              E.4.6.1. Environmental Setting 
              E.4.6.2. Environmental Impacts and Mitigation Measures 
              E.4.6.3. Modified Route D Alternative Substation 
              E.4.6.4. Star Valley Option 
              E.4.6.5. Future Transmission System Expansion 
              E.4.7. Cultural and 
              Paleontological Resources 
              Cultural Resources 
              E.4.7.1. Environmental Setting 
              E.4.7.2. Environmental Impacts and Mitigation Measures 
              E.4.7.3. Modified Route D Alternative Substation 
              E.4.7.4. Star Valley Option 
              E.4.7.5. Future Transmission System Expansion 
              Paleontological Resources 
              E.4.7.6. Environmental Setting 
              E.4.7.7. Environmental Impacts and Mitigation Measures 
              E.4.7.8. Modified Route D Alternative Substation 
              E.4.7.9. Star Valley Option 
              E.4.7.10. Future Transmission System Expansion 
              E.4.8. Noise 
              E.4.8.1. Environmental Setting 
              E.4.8.2. Environmental Impacts and Mitigation Measures 
              E.4.8.3. Modified Route D Substation 
              E.4.8.4. Star Valley Option 
              E.4.8.5. Future Transmission System Expansion 
              E.4.9. Transportation and 
              Traffic 
              E.4.9.1. Environmental Setting 
              E.4.9.2. Environmental Impacts and Mitigation Measures 
              E.4.9.3. Modified Route D Substation 
              E.4.9.4. Star Valley Option 
              E.4.9.5. Future Transmission System Expansion 
              E.4.10. Public Health and Safety 
              E.4.10.1. Environmental Setting 
              E.4.10.2. Environmental Impacts and Mitigation Measures 
              E.4.10.3. Modified Route D Alternative Substation 
              E.4.10.4. Star Valley Option 
              E.4.10.5. Future Transmission System Expansion 
              E.4.11. Air Quality 
              E.4.11.1. Environmental Setting 
              E.4.11.2. Environmental Impacts and Mitigation Measures 
              E.4.11.3. Modified Route D Substation Alternative 
              E.4.11.4. Star Valley Option 
              E.4.11.5. Future Transmission System Expansion 
              E.4.12. Water Resources 
              E.4.12.1. Environmental Setting 
              E.4.12.2. Environmental Impacts and Mitigation Measures 
              E.4.12.3. Modified Route D Substation 
              E.4.12.4. Star Valley Option 
              E.4.12.5. Future Transmission System Expansion 
              E.4.13. Geology, Mineral Resources, 
              and Soils 
              E.4.13.1. Environmental Setting 
              E.4.13.2. Environmental Impacts and Mitigation Measures 
              E.4.13.3. Modified Route D Alternative Substation 
              E.4.13.4. Star Valley Option 
              E.4.13.5. Future Transmission System Expansion 
              E.4.14. Socioeconomics 
              E.4.14.1. Environmental Setting 
              E.4.14.2. Environmental Impacts and Mitigation Measures 
              E.4.14.3. Modified Route D Substation 
              E.4.14.4. Star Valley Option 
              E.4.14.5. Future Transmission System Expansion 
              E.4.15. Fire and Fuels Management 
              E.4.15.1. Environmental Setting 
              E.4.15.2. Environmental Impacts and Mitigation Measures 
              E.4.15.3. Modified Route D Alternative Substation 
              E.4.15.4. Star Valley Option 
              E.4.15.5. Future Transmission System Expansion 
              Fig. 
              E.4.1-1a. Modified Route D Alternative - Overview and Draft 
              368 Corridor 
              Fig. 
              E.4.1-1b. Modified Route D Alternative (MPs 0-15) 
              Fig. 
              E.4.1-1c. Modified Route D Alternative (MPs 15-22) 
              Fig. 
              E.4.1-1d. Modified Route D Alternative (MPs 22-36.3) 
              Fig. 
              E.4.1-2. Modified Route D Alternative Substation 
              Fig. 
              E.4.1-3. Star Valley Route Option 
              Fig. 
              E.4.3-1A/B. Key Viewpoint 67 - Modified Route D Alternative 
              - South Buckman Springs Road - Existing View and Simulation 
              Fig. E.4.3-2A. 
              Key Viewpoint 68 - Modified Route D Alternative - Lyons Valley Road 
              - Existing View 
              Fig. E.4.3-2B. 
              Key Viewpoint 68 - Modified Route D Alternative - Lyons Valley Road 
              - Visual Simulation 
              Fig. E.4.3-3A. 
              Key Viewpoint 69 - Modified Route D Alternative - Japatul Road - 
              Existing View 
              Fig. E.4.3-3B. 
              Key Viewpoint 69 - Modified Route D Alternative - Japatul Road - 
              Visual Simulation 
              Fig. E.4.3-4A. 
              Key Viewpoint 70 - Star Valley Option- Star Valley Road - Existing 
              View 
              Fig. E.4.3-4B. 
              Key Viewpoint 70 - Star Valley Option- Star Valley Road - Simulation 
              Visual Appendix: 
              - VR-1. 
              Summary of Key Viewpoint Analyses 
              Land Use Appendix: 
              - Fig. 
              E.4.4-1. Modified Route D Alternative 
              - Fig. 
              E.4.4-2. Modified Route D Alternative 
              - Fig. 
              E.4.4-3. Modified Route D Alternative 
              - Fig. 
              E.4.4-4. Modified Route D Alternative 
              - Fig. 
              E.4.4-5. Modified Route D Alternative 
              and Star Valley Option 
              Agriculture Appendix: 
              - Fig. 
              E.4.6-1. Modified Route D Alternative 
              - Fig. 
              E.4.6-2. Modified Route D Alternative 
              - Fig. 
              E.4.6-3. Modified Route D Alternative 
              - Fig. 
              E.4.6-4. Modified Route D Alternative 
              - Fig. 
              E.4.6-5. Modified Route D Alternative 
              Fig. 
              E.4.15-1. Modified Route D Alternative Overview Map 
              Fig. E.4.15-2. Reported 13-Year Wildfire Ignition History in Alternative 
              Route Campo Fireshed* 
              Fig. E.4.15-3. Campo Fireshed 50-Year Wildfire History* 
              Fig. E.4.15-4. Reported 13-Year Wildfire Ignition History in Alternative 
              Route Dulzura Fireshed* 
              Fig. E.4.15-5. Dulzura Fireshed 50-Year Wildfire History* 
              Fig. 
              E.4.15-6. La Posta Fireshed Modified Route D Alternative Burn 
              Probability Model 
              Fig. 
              E.4.15-7. Campo Fireshed Modified Route D Alternative Burn Probability 
              Model 
              Fig. 
              E.4.15-8. Dulzura Fireshed Modified Route D Alternative Burn 
              Probability Model 
              Fig. 
              E.4.15-9. Guatay Fireshed Modified Route D Alternative Burn 
              Probability Model 
              Fig. 
              E.4.15-10. La Posta Fireshed Modified Route D Alternative Fire 
              Behavior Trend Model 
              Fig. 
              E.4.15-11. Campo Fireshed Modified Route D Alternative Fire 
              Behavior Trend Model 
              Fig. 
              E.4.15-12. Dulzura Fireshed Modified Route D Alternative Fire 
              Behavior Trend Model 
              Fig. 
              E.4.15-13. Guatay Fireshed Modified Route D Alternative Fire 
              Behavior Trend Model 
              Fig. 
              E.4.15-14. La Posta Fireshed Modified Route D Alternative Wildfire 
              Containment Conflict Model 
              Fig. 
              E.4.15-15. Campo Fireshed Modified Route D Alternative Wildfire 
              Containment Conflict Model 
              Fig. 
              E.4.15-16. Dulzura Fireshed Modified Route D Alternative Wildfire 
              Containment Conflict Model 
              Fig. 
              E.4.15-17. Guatay Fireshed Modified Route D Alternative Wildfire 
              Containment Conflict Model 
           | 
        
 
          | E.5 | 
          New 
            In-Area Renewable Generation | 
        
 
          |   | 
           
             E.5.1. Description of Alternative Components 
              E.5.2. Biological Resources 
              E.5.3. Visual Resources 
              E.5.4. Land Use 
              E.5.5. Wilderness and Recreation 
              E.5.6. Agriculture 
              E.5.7. Cultural and Paleontological Resources 
              E.5.8. Noise 
              E.5.9. Transportation and Traffic 
              E.5.10. Public Health and Safety 
              E.5.11. Air Quality 
              E.5.12. Water Resources 
              E.5.13. Geology, Mineral Resources, and Soils 
              E.5.14. Socioeconomics, Public Services, and Utilities 
              E.5.15. Fire and Fuels Management 
              E.5.16. References 
              Fig. 
              E.5.1-1a. New In-Area Renewable Generation Alternative, Solar 
              Thermal Vicinity Map 
              Fig. 
              E.5.1-1b. Parabolic Trough Solar Plant at Kramer Junction, California 
              Fig. 
              E.5.1-1c. Parabolic Trough Collector 
              Fig. 
              E.5.1-1d. Solar Thermal Transmission Line Upgrade Options 
              Fig. 
              E.5.1-2. New In-Area Renewable Generation Alternative, Biomass 
              Component 
              Figs. 
              E.5.1-3a and E.5.1-3b. 
              - Fig. E.5.1-3a. Biomass: Rendering of Proposed Fallbrook Renewable 
              Energy Facility 
              - Fig. E.5.1-3b. Biomass: Fallbrook Site 
              Fig. 
              E.5.1-3c. Potential Transmission Connections for Fallbrook REF 
              Fig. E.5.1-4. 
              Biomass and Biogas: Miramar Sites 
              Fig. 
              E.5.1-5. San Diego Area Regional Wind Resources 
              Fig. E.5.1-6a. 
              New In-Area Renewable Generation Alternative, Wind Component 
              Fig. 
              E.5.1-6b. Wind Component Detail 
              Fig. 
              E.5.1-6c. Jacumba Substation Potential Site 
              Land Use Appendix: 
              - Fig. 
              E.5.4-1. New In-Area Renewable Generation, Borrego Peaker and 
              Solar Thermal: Narrows-Warners 138 kV Upgrade Option 
              - Fig. 
              E.5.4-2. New In-Area Renewable Generation, Solar Thermal: Narrows-Warners 
              138 kV Upgrade Options 
              - Fig. 
              E.5.4-3. New In-Area Renewable Generation, Solar Thermal: Narrows-Warners 
              138 kV Upgrade Options 
              - Fig. 
              E.5.4-4. New In-Area Renewable Generation, Solar Thermal: Narrows-Warners 
              138 kV Upgrade Options 
              - Fig. 
              E.5.4-5. New In-Area Renewable Generation, Solar Thermal: Narrows-Warners 
              138 kV Upgrade Options 
              - Fig. 
              E.5.4-6. New In-Area Renewable Generation, Miramar Peaker and 
              Potential Miramar Biogas and Renewable Energy Facility 
              - Fig. 
              E.5.4-7. New In-Area Renewable Generation, Pala Peaker, and 
              Potential Fallbrook Renewable Energy Facility 
              Agriculture Appendix: 
              - Fig. 
              E.5.6-1. New In-Area Renewable Generation, Borrego Peaker and 
              Solar Thermal: Narrows-Warners 138 kV Upgrade Option 
              - Fig. 
              E.5.6-2. New In-Area Renewable Generation, Solar Thermal: Narrows-Warners 
              138 kV Upgrade Option 
              - Fig. 
              E.5.6-3. New In-Area Renewable Generation, Solar Thermal: Narrows-Warners 
              138 kV Upgrade Option 
              - Fig. 
              E.5.6-4. New In-Area Renewable Generation, Solar Thermal: Narrows-Warners 
              138 kV Upgrade Option 
              - Fig. 
              E.5.6-5. New In-Area Renewable Generation, Solar Thermal: Narrows-Warners 
              138 kV Upgrade Option 
              - Fig. 
              E.5.6-6. New In-Area Renewable Generation, Pala Peaker, and 
              Potential Fallbrook Renewable Energy Facility 
            | 
        
 
          | E.6 | 
          New 
            In-Area All-Source Generation | 
        
 
          |   | 
          E.6.1. 
            Description of New In-Area All-Source Generation 
            E.6.2. Biological Resources 
            E.6.3. Visual Resources 
            E.6.4. Land Use  
            E.6.5. Wilderness and Recreation 
            E.6.6. Agriculture 
            E.6.7. Cultural and Paleontological Resources 
            E.6.8. Noise 
            E.6.9. Transportation and Traffic 
            E.6.10. Public Health and Safety 
            E.6.11. Air Quality 
            E.6.12. Water Resources 
            E.6.13. Geology, Mineral Resources, and Soils 
            E.6.14. Socioeconomics, Public Services, and Utilities 
            E.6.15. Fire and Fuels Management 
            E.6.16. References for New In-Area All Source Generation 
            Fig. 
            E.6.1-1. Components of New In-Area All-Source Generation Alternative 
            Fig. 
            E.6.1-2a. New In-Area All-Source Generation Alternative, South 
            Bay Replacement Project 
            Fig. E.6.1 2b. Photosimulation of South Bay Replacement Project and 
            Adjacent Switchyard* 
            Fig. 
            E.6.1-3. New In-Area All Source Generation Alternative, San Diego 
            Community Power Project 
            Fig. 
            E.6.1-4a. General Equipment Layout for Peaker Power Plant Miramar 
            Fig. 
            E.6.1-4b. Pala Peaker Plant Site 
            Fig. 
            E.6.1-4c. Margarita Peaker Power Plant Site 
            Fig. 
            E.6.1-4d. Borrego Springs Peaker Power Plant Site 
            Fig. 
            E.6.3-1A. Key Viewpoint 71 - Marina Way Parking Lot - Existing 
            View 
            Fig. E.6.3-1B. 
            Key Viewpoint 71 - Marina Way Parking Lot - Visual Simulation 
            Fig. E.6.3-2A. 
            Key Viewpoint 72 - Brentwood Park - Existing View 
            Fig. E.6.3-2B. 
            Key Viewpoint 72 - Brentwood Park - Visual Simulation 
            Fig. E.6.3-3A/B. Key 
            Viewpoint 73 - Silver Strand - Existing View and Simulation 
            Fig. 
            E.6.3-4A. Key Viewpoint 74 - SDCPP: Strathmore Drive - Existing 
            View 
            Fig. 
            E.6.3-4B. Key Viewpoint 74 - SDCPP: Strathmore Drive - Visual 
            Simulation 
            Fig. E.6.3-5A. 
            Key Viewpoint 75 - Miramar Road - Existing View 
            Fig. E.6.3-5B. 
            Key Viewpoint 75 - Miramar Road - Visual Simulation 
            Fig. E.6.3-6A. 
            Key Viewpoint 76 - SR76 - Existing View 
            Fig. E.6.3-6B. 
            Key Viewpoint 76 - SR76 - Visual Simulation 
            Fig. E.6.3-7A/B. Key 
            Viewpoint 77 - Founders Park - Existing View and Simulation 
            Fig. E.6.3-8A/B. Key 
            Viewpoint 78 - Borrego Valley Road - Existing View and Simulation 
            Visual Resources Appendix: 
            - VR-1: 
            Key Viewpoint 71 - Existing View 
            Land Use Appendix: 
            - Fig. 
            E.6.4-1. New In-Area All-Source Generation - San 
            Diego Community Power Project 
            - Fig. 
            E.6.4-2. New In-Area 
            All-Source Generation - South Bay Replacement Project 
            - Fig. 
            E.6.4-3. New 
            In-Area All-Source Generation - Margarita 
            Peaker 
            Agriculture Appendix: 
            - Fig. 
            E.6.6-1. New In-Area 
            All-Source Generation - San Diego Community 
            Power Project | 
        
 
          | E.7 | 
          System 
            Alternatives | 
        
 
          |   | 
          E.7.1. LEAPS Transmission-Only 
            Alternative 
            E.7.1.1. LEAPS Transmission-Only Alternative Description 
            E.7.1.2. Biological Resources 
            E.7.1.3. Visual Resources 
            E.7.1.4. Land Use 
            E.7.1.5. Wilderness and Recreation 
            E.7.1.6. Agriculture 
            E.7.1.7. Cultural and Paleontological Resources 
            E.7.1.8. Noise 
            E.7.1.9. Transportation and Traffic 
            E.7.1.10. Public Health and Safety 
            E.7.1.11. Air Quality 
            E.7.1.12. Water Resources 
            E.7.1.13. Geology, Mineral Resources, and Soils 
            E.7.1.14. Socioeconomics, Public Services, and Utilities 
            E.7.1.15. Fuels and Fire Management 
            E.7.2. LEAPS Generation and Transmission Alternative 
            E.7.2.1. LEAPS Generation and Transmission Alternative Description 
            E.7.2.2. Biological Resources 
            E.7.2.3. Visual Resources 
            E.7.2.4. Land Use 
            E.7.2.5. Wilderness and Recreation 
            E.7.2.6. Agriculture 
            E.7.2.7. Cultural and Paleontological Resources 
            E.7.2.8. Noise 
            E.7.2.9. Transportation and Traffic 
            E.7.2.10. Public Health and Safety 
            E.7.2.11. Air Quality 
            E.7.2.12. Water Resources 
            E.7.2.13. Geology, Mineral Resources, and Soils 
            E.7.2.14. Socioeconomics, Public Services, and Utilities 
            E.7.2.15. Fuels and Fire Management  
            E.7.3. Mitigation Monitoring, Compliance, and Reporting Table 
            E.7.4. References  
            Fig. 
            E.7.1-1. LEAPS Transmission-Only Alternative 
            Fig. 
            E.7.1-2a. LEAPS Transmission-Only Alternative: Lee Lake to Elsinore 
            Fig. 
            E.7.1-2b. LEAPS Transmission-Only Alternative: Elsinore to Pendleton 
            Substation 
            Fig. 
            E.7.1-2c. LEAPS Transmission-Only Alternative: Talega Substation 
            to Pala 
            Fig. 
            E.7.1-2d. LEAPS Transmission-Only Alternative: Pala to Escondido 
            Fig. 
            E.7.1.3-1. LEAPS Transmission-Only Alternative: Key Viewpoints 
            Fig. 
            E.7.1.3-2a. LEAPS KVP L1 Existing View 
            Fig. 
            E.7.1.3-2b. LEAPS KVP L1 Simulation 
            Fig. E.7.1.3-3a. 
            LEAPS KVP L2 Existing Conditions 
            Fig. 
            E.7.1.3-3b. LEAPS KVP L2 Simulation 
            Fig. E.7.1.3-4a. 
            LEAPS KVP L2 Existing Conditions 
            Fig. 
            E.7.1.3-4b. LEAPS KVP L2 Simulation 
            Fig. E.7.1.3-5a. 
            LEAPS KVP L3 Existing View 
            Fig. 
            E.7.1.3-5b. LEAPS KVP L3 Simulation 
            Fig. E.7.1.3-6a. 
            LEAPS KVP L4 Existing View 
            Fig. 
            E.7.1.3-6b. LEAPS KVP L4 Simulation 
            Fig. E.7.1.3-7a. 
            LEAPS KVP L5 Existing View 
            Fig. E.7.1.3-7b. 
            LEAPS KVP L5 Simulation 
            Fig. E.7.1.3-8a. 
            LEAPS KVP L6 Existing View 
            Fig. E.7.1.3-8b. 
            LEAPS KVP L6 Simulation 
            Fig. E.7.1.3-9a. 
            LEAPS KVP L7 Existing View 
            Fig. 
            E.7.1.3-9b. LEAPS KVP L7 Simulation 
            Fig. E.7.1.3-10a. 
            LEAPS KVP L8 Existing View 
            Fig. 
            E.7.1.3-10b. LEAPS KVP L8 Simulation 
            Fig. 
            E.7.1.4-1. LEAPS Alternative: Cleveland National Forest Land Use 
            Zones 
            Fig. 
            E.7.1.15-1. LEAPS Fireshed Overview Map 
            Fig. E.7.1.15-2. Lake Elsinore Fireshed Wildfire History* 
            Fig. E.7.1.15-3. Margarita Fireshed Wildfire History* 
            Fig. 
            E.7.1.15-4. Lake Elsinore Fireshed Burn Probability Model 
            Fig. 
            E.7.1.15-5. Margarita Fireshed Burn Probability Model 
            Fig. 
            E.7.1.15-6. Lake Elsinore Fireshed Fire Behavior Trend Model 
            Fig. 
            E.7.1.15-7. Margarita Fireshed Fire Behavior Trend Model 
            Fig. 
            E.7.1.15-8. Lake Elsinore Fireshed Firefighter Threat Assessment 
            Model 
            Fig. 
            E.7.1.15-9. Lake Elsinore Fireshed Firefighter Threat Assessment 
            Model 
            Fig. 
            E.7.2.1. LEAPS Generation and Transmission Alternative 
            Fig. 
            E.7.2.3-1A. LEAPS KVP L9 Existing View 
            Fig. E.7.2.3-1B. 
            LEAPS KVP L9 Simulation 
            Fig. 
            E.7.2.3-2. LEAPS KVP L10 Existing View and Simulation 
            Fig. E.7.2.3-3A. 
            LEAPS KVP L3 Existing View 
            Fig. E.7.2.3-3B. 
            LEAPS KVP L3 Simulation 
            Fig. E.7.2.3-4A. 
            LEAPS KVP L5 Existing View 
            Fig. E.7.2.3-4B. 
            LEAPS KVP L5 Simulation 
            Fig. E.7.2.12-1. Extent of Inundation Resulting from Dam/Dike Break* | 
        
 
          | E.8 | 
          Environmental 
            Impacts of the No Project/No Action Alternative | 
        
 
          |   | 
          E.8.1. 
            Description of the No Project/No Action Alternative 
            E.8.2. Biological Resources 
            E.8.3. Visual Resources 
            E.8.4. Land Use 
            E.8.5. Wilderness and Recreation 
            E.8.6. Agriculture 
            E.8.7. Cultural and Paleontological Resources 
            E.8.8. Noise 
            E.8.9. Transportation and Traffic 
            E.8.10. Public Health and Safety 
            E.8.11. Air Quality 
            E.8.12. Water Resources 
            E.8.13. Geology, Mineral Resources, and Soils 
            E.8.14. Socioeconomics, Public Services, and Utilities 
            E.8.15. Fire and Fuels Management 
            E.8.16. References | 
        
 
          | F. | 
          Other 
            CEQA and NEPA Requirements | 
        
 
          |   | 
          F.1. 
            Environmental Justice 
            F.2. Growth-Inducing Effects 
            F.3. Significant Irreversible Changes and Irretrievable Commitments 
            of Resources 
            F.4. Significant Environmental Effects which Cannot be Avoided if 
            the Proposed Project is Implemented 
            F.5. Relationship Between Short-Term Uses and Long-Term Productivity 
            of the Environment 
            F.6. Energy Conservation 
            F.7. References 
            Fig. 
            F-1. Environmental Justice - Imperial County Detail 
            Fig. 
            F-2. Environmental Justice - Santa Ysabel Reservation 
            Fig. 
            F-3. Environmental Justice - Barona Reservation 
            Fig. 
            F-4. Environmental Justice - Campo, La Posta, and Manzanita Reservations 
            Fig. 
            F-5. Environmental Justice - Pauma and Yuima and Pala Reservations | 
        
 
          | G. | 
          Cumulative 
            Scenario and Impacts | 
        
 
          |   | 
          G.1. 
            Introduction and Methodology 
            G.2. Applicable Cumulative Projects and Projections 
            G.3. Cumulative Impact Analysis of the Proposed Project 
            G.4. Cumulative Impact Analysis of Alternatives 
            Fig. 
            G-1. Cumulative Projects: Imperial Valley Link 
            Fig. 
            G-2. Cumulative Projects: Anza-Borrego Link 
            Fig. G-3. 
            Cumulative Projects: Central Link 
            Fig. 
            G-4. Cumulative Projects: Inland Valley Link 
            Fig. G-5. 
            Cumulative Projects: Coastal Link 
            Fig. G-6. 
            Cumulative Projects: San Luis Rey Substation 
            Fig. G-7. 
            Cumulative Projects: South Bay Substation 
            Fig. 
            G-8. Cumulative Projects: SWPL Alternatives Eastern Portion 
            Fig. 
            G-9. Cumulative Projects: SWPL Alternatives Central Portion 
            Fig. 
            G-10. Cumulative Projects: SWPL Alternatives Western Portion | 
        
 
          | H. | 
          Comparison 
            of Alternatives | 
        
 
          |   | 
          H.1. 
            Regulatory Requirements for Alternatives Comparison 
            H.2. Alternatives Comparison Methodology 
            H.3. Comparison of Alternatives along Proposed Project Route Links 
            H.4. Comparison of SWPL Alternatives 
            H.5. Comparison of LEAPS System Alternatives with the Environmentally 
            Superior Alternative for the Proposed Project Route and the Environmentally 
            Superior SWPL Alternative 
            H.6. Comparison of Environmentally Superior Transmission Line Route 
            Alternative (LEAPS Transmission-Only Alternative) with Non-Wires Alternatives 
            H.7. No Project Alternative vs. the Environmentally Superior Alternative 
            Fig. 
            H-1. Environmentally Superior Transmission Line Route Segment 
            Alternative for the Proposed Project 
            Fig. 
            H-2. Environmentally Superior SWPL Alternative 
            Fig. 
            H-3. Environmentally Superior Transmission Line Alternative (LEAPS 
            Transmission-Only Alternative) 
            Fig. 
            H-4. Overall Environmentally Superior Alternative (New In-Area 
            All-Source Generation Alternative) | 
        
 
          | I. | 
          Mitigation 
            Monitoring and Reporting | 
        
 
          |   | 
          I.1. Authority for the Mitigation 
            Monitoring, Compliance, and Reporting Program 
            I.2. Organization of the Final Mitigation Monitoring Plan 
            I.3. Roles and Responsibilities 
            I.4. Enforcement Responsibility 
            I.5. Mitigation Compliance Responsibility 
            I.6. Dispute Resolution 
            I.7. General Monitoring Procedures 
            I.8. Condition Effectiveness Review 
            I.9. Mitigation Monitoring Program Tables  | 
        
 
          | J. | 
          Public 
            Participation | 
        
 
          |   | 
          J.1. Introduction 
            J.2. Public Participation Program 
            J.3. Draft EIR/EIS Public Review Period | 
        
 
          | K. | 
          Glossary | 
        
 
          | L. | 
          Index | 
        
 
            
            Appendices 
             | 
        
 
          Appendix 
            1. Alternatives Screening Report 
            1. Introduction 
            2. Background and Previous Documents 
            3. Overview of Alternatives Evaluation Process 
            4. Alternative Descriptions and Determinations 
            5. References 
            Attachment 
            1A:. Effect of Wildfires on Transmission Line Reliability 
            Attachment 
            1B:. Caltrans' Policies 
            Fig. 
            Ap.1-1. Imperial Valley Link - Alternatives Considered 
            Fig. 
            Ap.1-2. Imperial Valley Link - Alternatives Retained 
            Fig. 
            Ap.1-3. Anza-Borrego Link - Alternatives Considered 
            Fig. 
            Ap.1-4. Anza-Borrego Link - Alternatives Retained 
            Fig. 
            Ap.1-5. San Felipe 230/500 kV Substation for Partial Underground 
            230 kV ABDSP SR78 to S2 Alternative 
            Fig. 
            Ap.1-6. Underground Cross Section of Duct Bank 
            Fig. Ap.1-7. 
            Earthquake Valley Fault Zone 
            Fig. 
            Ap.1-8. SDG&E 100-Foot ROW Shorter Structure Alternative - 
            Typical 500 kV Structures 
            Fig. 
            Ap.1-9. SDG&E Existing ROW Shorter Structure Alternative - 
            Typical 69 kV Structures 
            Fig. Ap.1-10. 
            Central Link - Alternatives Considered 
            Fig. Ap.1-11. 
            Central Link - Alternatives Considered - Santa Ysabel Detail 
            Fig. 
            Ap.1-12. Santa Ysabel Valley Alternatives Retained 
            Fig. Ap.1-13. 
            Elsinore Fault Alquist-Priolo Fault Zone 
            Fig. Ap.1-14. 
            Mesa Grande Alternative 
            Fig. Ap.1-15. 
            Inland Valley Link - Alternatives Considered 
            Fig. Ap.1-16. CNF 
            Existing 69 kV Route Alternative 
            Fig. Ap.1-17. 
            Oak Hollow Road Underground Alternative 
            Fig. Ap.1-18. 
            San Vicente Transition Alternative 
            Fig. Ap.1-19. 
            Chuck Wagon Road Alternative 
            Fig. Ap.1-20. 
            Coastal Link Alternatives Retained 
            Fig. Ap.1-21. 
            Coastal Link Alternatives Eliminated 
            Fig. Ap.1-22a. 
            Pomerado Road to Miramar Area North Alternative (East) 
            Fig. Ap.1-22b. 
            Pomerado Road to Miramar Area North Alternative (West) 
            Fig. Ap.1-23. 
            Los Peñasquitos Canyon Preserve-Mercy Road Alternative 
            Fig. 
            Ap.1-24. Black Mountain Road to Park Village Road Underground 
            Alternative 
            Fig. 
            Ap.1-25. Coastal Link System Upgrades 
            Fig. Ap.1-26. 
            Top of the World Substation Alternative 
            Fig. Ap.1-27a. 
            Southwest Powerlink Transmission Line and Interstate 8 Alternative 
            Fig. Ap.1-27b. 
            Southwest Powerlink Alternatives Retained in San Diego County 
            Fig. Ap.1-27c. 
            Southwest Powerlink Alternatives Eliminated in San Diego County 
            Fig. Ap.1-28. 
            Fire Risk Along SWPL 
            Fig. 
            Ap.1-29. SWPL Alternatives, Future Transmission System Expansion 
            Fig. 
            Ap.1-30. System Alternatives Retained 
            Fig. 
            Ap.1-31. System Alternatives Eliminated 
            Fig. 
            Ap.1-32a. LEAPS Transmission Only Alternative 
            Fig. 
            Ap.1-32b. LEAPS Generation and Transmission Alternative 
            Fig. 
            Ap.1-33a. New In-Area Renewable Generation Alternative, Solar 
            Thermal Component 
            Fig. 
            Ap.1-33b. San Diego Regional Wind Resources 
            Fig. Ap.1-33c. 
            New In-Area Renewable Generation Alternative, Wind Component 
            Fig. 
            Ap.1-34. Components of New In-Area All-Source Generation Alternative 
            Fig. Ap.1-35. DG Penetration Projections (Nameplate Capacity)* 
            Fig. Ap.1-36. Statewide First-Year Peak Savings of Utility Energy 
            Efficiency Programs* 
            Fig. Ap.1-37. Energy Efficiency Peak Demand Reduction Projections* | 
        
 
          Appendix 
            2. Policy Screening Report 
            1. Introduction and Purpose 
            2. Federal Plans and Documents 
            3. State Plans and Policies 
            4. Local Plans and Policies | 
        
 
          Appendix 3. Fire and Fuels Management 
            3A. Field Approach and Implementation 
             Fuel 
            Inventory Cruise Plan 
             
            3B. Sunrise Fireshed Fuel Model Photos 
             Fireshed 
            Fuel Typing Photographs 
            Fuel 
            Model Coding List 
            Photographic 
            Index and Approach to Fuel Coding 
             3C. Analysis and Processing 
             California 
            Power Line Fire Prevention Field Guide 
            (9.0MB) 
            Pre-Fire 
            Management Plan 
             3D. Applicable Regulations, Plans and Standards 
            SDG&E 
            and CAL FIRE MOU on SWPL 
            SDG&E 
            Guide for Encroachment 
            SDG&E 
            Standard Practice Draft Fire Plan  | 
        
 
          | Appendix 
            4. Persons and Organizations Consulted | 
        
 
          | Appendix 
            5. Preparers of the Draft EIR/EIS | 
        
 
          | Appendix 
            6. Recipients of the Draft EIR/EIS | 
        
 
          | Appendix 
            7. SDG&E's EMF Field Management Plan for Sunrise Powerlink | 
        
 
           Appendix 8. Biological Resources 
            8A. Proposed Project 
            Proposed 
            Project Habitat Index Map 
            Fig 
            Ap8A-00 Index Map 
            Fig 
            Ap8A-01 Proposed Project 
            Fig 
            Ap8A-02 Proposed Project 
            Fig 
            Ap8A-03 Proposed Project 
            Fig 
            Ap8A-04 Proposed Project 
            Fig 
            Ap8A-05 Proposed Project 
            Fig 
            Ap8A-06 Proposed Project 
            Fig 
            Ap8A-07 Proposed Project 
            Fig 
            Ap8A-08 Proposed Project 
            Fig 
            Ap8A-09 Proposed Project 
            Fig 
            Ap8A-10 Proposed Project 
            Fig 
            Ap8A-11 Proposed Project 
            Fig 
            Ap8A-12 Proposed Project 
            Fig 
            Ap8A-13 Proposed Project 
            Fig 
            Ap8A-14 Proposed Project 
            Fig 
            Ap8A-15 Proposed Project 
            Fig 
            Ap8A-16 Proposed Project 
            Fig 
            Ap8A-17 Proposed Project 
            Fig 
            Ap8A-18 Proposed Project 
            Fig 
            Ap8A-19 Proposed Project 
            Fig 
            Ap8A-20 Proposed Project 
            Fig 
            Ap8A-21 Proposed Project 
            Fig 
            Ap8A-22 Proposed Project 
            Fig 
            Ap8A-23 Proposed Project 
            Fig 
            Ap8A-24 Proposed Project 
            Fig 
            Ap8A-25A Vernal Pools Proposed Project 
            Fig 
            Ap8A-25B Vernal Pools Proposed Project 
            Fig 
            Ap8A-26 Proposed Project 
            Fig 
            Ap8A-27 Proposed Project 
            Fig 
            Ap8A-28 Proposed Project 
            Fig 
            Ap8A-29 Proposed Project 
            Fig 
            Ap8A-30 Proposed Project 
            Fig 
            Ap8A-31 Proposed Project 
            8B. 
            Protocol Survey Summary Table 
            8C. Special Status Species Surveys 
            Fig 
            Ap8C-01 Survey Locations - Arroyo Toad 
            Fig 
            Ap8C-02 Survey Locations - Bald Eagle 
            Fig 
            Ap8C-03 Survey Locations - Burrowing Owl 
            Fig 
            Ap8C-04 Survey Locations - Coastal California Gnatcatcher 
            Fig 
            Ap8C-05 Survey Locations - Desert Tortoise 
            Fig 
            Ap8C-06 Survey Locations - Least Bell's Vireo 
            Fig 
            Ap8C-07 Survey Locations - Quino Checkerspot Butterfly 
            Fig 
            Ap8C-08 Survey Locations - San Diego and Riverside Fairy Shrimp 
            Fig 
            Ap8C-09 Survey Locations - Stephens' Kangaroo Rat 
            Fig 
            Ap8C-10 Survey Locations - Southwestern Willow Flycatcher 
             
            8D. Imperial Valley Link Alternatives Habitat Maps 
             Fig 
            Ap8D-00 Route Segment Alternatives Index 
            Fig 
            Ap8D-01 Imperial Valley Link Alternatives 
            Fig 
            Ap8D-02 Imperial Valley Link Alternatives 
            Fig 
            Ap8D-03 Imperial Valley Link Alternatives   
            8E. Anza-Borrego Link Alternatives Habitat Maps 
            Fig 
            Ap8E-01 Anza-Borrego Alternatives 
            Fig 
            Ap8E-02 Anza-Borrego Alternatives 
            Fig 
            Ap8E-03 Anza-Borrego Alternatives 
            Fig 
            Ap8E-04 Anza-Borrego Alternatives 
            Fig 
            Ap8E-05 Anza-Borrego Alternatives 
            Fig 
            Ap8E-06 Anza-Borrego Alternatives 
            Fig 
            Ap8E-07 Anza-Borrego Alternatives 
            Fig 
            Ap8E-08 Anza-Borrego Alternatives 
            Fig 
            Ap8E-09 Anza-Borrego Alternatives 
            Fig 
            Ap8E-10 Anza-Borrego Alternatives 
             8F. Central Link Alternatives Habitat Maps 
            Fig 
            Ap8F-01 Central Link Alternatives 
            Fig 
            Ap8F-02 Central Link Alternatives 
            Fig 
            Ap8F-03 Central Link Alternatives 
            Fig 
            Ap8F-04 Central Link Alternatives 
            Fig 
            Ap8F-05 Central Link Alternatives 
            Fig 
            Ap8F-06 Central Link Alternatives 
             8G. Inland Valley Link Alternatives Habitat 
            Maps 
            Fig 
            Ap8G-01 Inland Valley Link Alternatives 
            Fig 
            Ap8G-02 Inland Valley Link Alternatives 
            Fig 
            Ap8G-03 Inland Valley Link Alternatives 
            Fig 
            Ap8G-04 Inland Valley Link Alternatives 
             8H. Coastal Link Alternatives Habitat Maps 
             Fig 
            Ap8H-01 Coastal Link Alternatives 
            Fig 
            Ap8H-02 Coastal Link Alternatives 
            Fig 
            Ap8H-03 Coastal Link Alternatives 
            Fig 
            Ap8H-04 Coastal Link Alternatives 
            8I. Substation Alternative Habitat Maps 
            Fig 
            Ap8I-01 Top of the World Alternative 
            8J. SWPL Alternatives Habitat Maps 
            Fig 
            Ap8J-01 Interstate 8 Alternative 
            Fig 
            Ap8J-02 Interstate 8 Alternative 
            Fig 
            Ap8J-03 Interstate 8 Alternative 
            Fig 
            Ap8J-04 Interstate 8 Alternative 
            Fig 
            Ap8J-05 Interstate 8 Alternative 
            Fig 
            Ap8J-06 Interstate 8 Alternative 
            Fig 
            Ap8J-07 Interstate 8 Alternative 
            Fig 
            Ap8J-08 Interstate 8 Alternative 
            Fig 
            Ap8J-09 Interstate 8 Alternative 
            Fig 
            Ap8J-10 Interstate 8 Alternative 
            Fig 
            Ap8J-11 Interstate 8 Alternative 
            Fig 
            Ap8J-12 Interstate 8 Alternative 
            Fig 
            Ap8J-13 Interstate 8 Alternative 
            Fig 
            Ap8J-14 Interstate 8 Alternative 
            Fig 
            Ap8J-15 Interstate 8 Alternative 
            Fig 
            Ap8J-16 Interstate 8 Alternative 
            Fig 
            Ap8J-17 Interstate 8 Alternative 
            Fig 
            Ap8J-18 Interstate 8 Alternative 
            Fig 
            Ap8J-19 Interstate 8 Alternative 
            Fig 
            Ap8J-20 Interstate 8 Alternative 
            Fig 
            Ap8J-21 South Buckman Springs Option 
            Fig 
            Ap8J-22 Campo North Option 
            Fig Ap8J-23 
            BCD Alternative 
            Fig Ap8J-24 
            BCD Alternative 
            Fig Ap8J-25 
            BCD Alternative 
            Fig Ap8J-26 
            BCD Alternative 
            Fig 
            Ap8J-27 BCD Alternative South Option 
            Fig Ap8J-28 
            Route D Alternative 
            Fig Ap8J-29 
            Route D Alternative 
            Fig Ap8J-30 
            Route D Alternative 
            Fig Ap8J-31 
            Route D Alternative 
            Fig Ap8J-32 
            Modified Route D Alternative 
            Fig Ap8J-33 
            Modified Route D Alternative 
            Fig Ap8J-34 
            Modified Route D Alternative 
            Fig Ap8J-35 
            Modified Route D Alternative 
            Fig Ap8J-36 
            Modified Route D Alternative 
            Fig Ap8J-37 
            Modified Route D Alternative 
            Fig Ap8J-38 
            Modified Route D Alternative 
            Fig 
            Ap8J-39 Modified Route D Alternative Star Valley Option 
            8K. LEAPS Project Alternative Habitat Maps 
            Fig 
            Ap8K-01 Lake Pendleton 
            Fig Ap8K-02 
            Lake Pendleton 
            Fig Ap8K-03 
            Lake Pendleton 
            Fig Ap8K-04 
            Lake Pendleton 
            Fig Ap8K-05 
            Lake Pendleton 
            Fig Ap8K-06 
            Lake Pendleton 
            Fig Ap8K-07 Pala 
            Lilac 
            Fig Ap8K-08 Pala 
            Lilac 
            Fig 
            Ap8K-09 LEAPS Talega-Escondido 
            Fig 
            Ap8K-10 LEAPS Talega-Escondido 
            Fig 
            Ap8K-11 LEAPS Talega-Escondido 
            Fig 
            Ap8K-12 LEAPS Talega-Escondido 
            Fig 
            Ap8K-13 LEAPS Talega-Escondido 
            Fig 
            Ap8K-14 LEAPS Talega-Escondido 
             8L. Non-Wires Alternatives Habitat Maps 
            Fig 
            Ap8L-01 Solar Thermal 
            Fig Ap8L-02 
            Solar Thermal 
            Fig Ap8L-03 
            Solar Thermal 
            Fig Ap8L-04 
            Solar Thermal 
            Fig Ap8L-05 
            Solar Thermal 
            Fig Ap8L-06 
            Solar Thermal 
            Fig Ap8L-07 
            Solar Thermal 
            Fig Ap8L-08 
            Solar Thermal 
            Fig Ap8L-09 
            Solar Thermal 
            Fig Ap8L-10 
            Wind Alternative 
            Fig Ap8L-11 
            Wind Alternative 
            Fig Ap8L-12 
            Wind Alternative 
             8M. Management Indicator Species Analysis 
            Management 
            Indicator Species (MIS) Analysis 
            MIS Figure 1 
            MIS Figure 2 | 
        
 
          |  
             Appendix 9. Cultural Resources and Native American Consultation 
              9A. 
              Cultural Resources Background 
              9B. 
              Cultural Resources Tables 
              9C. 
              Native American Consultation and Responses 
              9D. Paleontological Sensitivity Maps: 
              Imperial Valley Link Alternative 
              Ap9D-01 
              Ap9D-02 
              Ap9D-03 
              Ap9D-04 
              Ap9D-05 
              Ap9D-06 
              Imperial Valley/Anza-Borrego Link Alternatives  
              Ap9D-07 
              Anza-Borrego/Central Valley Link Alternatives 
              Ap9D-08 
              Ap9D-09 
              Ap9D-10 
              Central Valley Link Alternative 
              Ap9D-11 
              Ap9D-12 
              Inland Valley Link Alternative  
              Ap9D-13 
              Ap9D-14 
              Ap9D-15 
              Coastal Link Alternative  
              Ap9D-16 
              Ap9D-17 
              Sycamore Canyon-Elliot Substation Reconductor  
              Ap9D-18 
              Ap9D-19 
              Interstate 8 Alternative  
              Ap9D-20 
              Ap9D-21 
              Ap9D-22 
              Ap9D-23 
              Ap9D-24 
              Ap9D-25 
              Ap9D-26 
              Ap9D-27 
              Ap9D-28 
              BCD Alternative  
              Ap9D-29 
              Modified Route D Alternative 
              Ap9D-30 
              Modified Route D Alternative and Star Valley Option  
              Ap9D-31 
              Route D Alternative 
              Ap9D-32 
              Ap9D-33 
              New In-Area Renewable Generation, Solar Thermal Alternative 
              Ap9D-34 
           | 
        
 
          | Appendix 
            10. Air Quality | 
        
 
          | Appendix 11. Detailed Route Maps | 
        
 
          |  
            
           | 
        
 
          | Appendix 
            12. Full Text of All Mitigation Measures | 
        
 
          Appendix 13. Public Health and Safety 
            Environmental Database Searches 
            Proposed Project 
            Search 
            01 of 24 
            Search 
            02 of 24 
            Search 
            03 of 24 
            Search 
            04 of 24 
            Search 
            05 of 24 
            Search 
            06 of 24 
            Search 
            07 of 24 
            Search 
            08 of 24 
            Search 
            09 of 24 
            Search 
            10 of 24 
            Search 
            11 of 24 
            Search 
            12 of 24 
            Search 
            13 of 24 
            Search 
            14 of 24 
            Search 
            15 of 24 
            Search 
            16 of 24 
            Search 
            17 of 24 
            Search 
            18 of 24 
            Search 
            19 of 24 
            Search 
            20 of 24 
            Search 
            21 of 24 
            Search 
            22 of 24 
            Search 
            23 of 24 
            Search 
            24 of 24 
            Proposed 
            Project Atlas 1 (18.7MB) 
            Proposed 
            Project Map 1 (8.3MB) 
            Proposed 
            Project Atlas 2 (3.4MB) 
            Proposed 
            Project Map 2 
            FTSE Corridor 
            1 (12.9.0MB) 
            FTSE Corridor 
            1 - Map (5.7MB) 
            FTSE Corridor 
            2 (4.6MB) 
            FTSE Corridor 
            2 - Map 
            Warner 
            Substation FTSE and Solar-Thermal 
            Imperial Valley Link 
            FTHL Eastern 
            FTHL Eastern - 
            Map 
            West of Dunaway 
            West of Dunaway 
            - Map 
            Central Link 
            Santa Ysabel 
            Existing 
            Santa 
            Ysabel Existing - Map 
            Inland Valley Link 
            Chuck Wagon Road 
            Chuck Wagon 
            Road - Map 
            Coastal Link 
            Pomerado-Miramar 
            (9.1MB) 
            Pomerado-Miramar 
            - Map 
            Los Peñasquitos 
            Los Peñasquitos 
            - Map 
            SWPL 
            SWPL Alternatives 
            (9.4MB) 
            SWPL Alternatives 
            - Map (4.7MB) 
            Modified Route D 
            Modified D - 
            1 
            Modified D - 
            2 
            Modified D - 
            3 
            Modified Route 
            D (6.4MB) 
            Modified 
            Route D - Map 
            LEAPS 
            LEAPS 
            Modified Staff Alternative 
            LEAPS 
            Modified Staff Alternative - Map 
            LEAPS Talega-Escondido 
            LEAPS 
            Talega-Escondido - Map 
            Santa Rosa 
            Powerhouse 
            Santa Rosa 
            Powerhouse - Map 
            Non-Wires 
            Solar-Thermal 
            Solar-Thermal - 
            Map 
            Solar-Thermal 
            Transmission Line East and Borrego Peaker 
            Solar-Thermal 
            Transmission Line East and Borrego Peaker - Map 
            Solar-Thermal 
            Transmission Line West 
            Solar-Thermal 
            Transmission Line West - Map 
            Fallbrook 
            Renewable Energy Facility 
            Miramar Landfill 
            Wind Alternatives 
            Area 1 
            Wind Alternatives 
            Area 1 - Map 
            Wind Alternatives 
            Area 2 
            Wind Alternatives 
            Area 2 - Map 
            All-Source 
            South Bay Power Plant 
            All-Source 
            San Diego Community Power Project 
            All-Source 
            Pala Peaker 
            All-Source 
            Margarita Substation 
            All-Source 
            Miramar Substation | 
        
 
            |