JUMP TO: 
            Comments and Responses on the Draft EIR/EIS 
            Comments and Responses on the Recirculated Draft 
            EIR/Supplemental Draft EIS 
            Draft EIR/EIS as modified in response to comments 
            Recirculated Draft EIR/Supplemental Draft EIS as 
            modified in response to comments  | 
        
         
            | 
        
         
          |  Notice of Availability | 
        
         
          | Title Page | 
        
 
          Executive 
            Summary 
            ES.1 Background and Organization 
            ES.2 Summary of Final EIR/EIS Conclusions 
            ES.3 Proposed Project and Project Objectives 
            ES.4 Summary of Public Involvement Activities 
            ES.5 Impacts of the Proposed Project 
            ES.6 Alternatives to the Proposed Project 
            ES.7 Comparison of Proposed Project and Retained Alternatives to Determine 
            Overall Environmentally Superior Alternatives 
            ES.8 Comparison of Transmission Alternatives Data 
            ES.9 Comments and Responses to Comments 
            ES.10 Impact Summary Tables 
            Fig. 
            ES-1. Proposed Project with Connected Actions and Future System 
            Expansions (4.9MB) 
            Fig. 
            ES-2. Components of New In-Area All-Source and Renewable Generation 
            Alternatives 
            Fig. ES-3. 
            LEAPS Project Alternatives (4.7MB) 
            Fig. 
            ES-4. Final Environmentally Superior Northern Route Alternative 
            and Final Environmentally Superior Southern Route Alternative (4.8MB) 
            Fig. 
            ES-5. Photographs Illustrating Imperial Valley Link 
            Fig. ES-6. 
            Photographs Illustrating Anza-Borrego Link 
            Fig. ES-7. 
            Photographs Illustrating Central Link 
            Fig. ES-8. 
            Photographs Illustrating Inland Valley Link 
            Fig. ES-9. 
            Photographs Illustrating Coastal Link 
            Fig. 
            ES-10. Alternatives Retained 
            Fig. 
            ES-11. Alternatives Eliminated 
            Fig. 
            ES-12. Imperial Valley Link Alternatives Retained (4.1MB) 
            Fig. 
            ES-13. Anza-Borrego Link Alternatives Retained (5.5MB) 
            Fig. ES-14. 
            Central Link Alternatives Retained (6.1MB) 
            Fig. 
            ES-15. Inland Valley Link Alternatives Retained (5.2MB) 
            Fig. ES-16. 
            Coastal Link Alternatives Retained (4.3MB) 
            Fig. ES-17. 
            Southwest Powerlink Alternatives Retained 
            Executive 
            Summary from Draft EIR/EIS (showing changes made after the Draft) | 
        
 
            
            Comments and Responses on the Draft EIR/EIS | 
        
 
            Comments 
            and Responses to Comments 
            General 
            Responses to Major Comments | 
        
 
           Written Comments Received from Public 
            Agencies and Tribal Governments 
              
            Comment Set A0001 
            A0001. California Department of Parks & Recreation  part 1  
            part 2  
            part 3  
            part 4 
               
            Comment Set A0002 
            A0002. Imperial County Planning & Development Services  part 1  
            part 2  
            part 3  
            part 4  
            part 5  
            part 6 (3.9MB) 
               
            Comment Sets A0003-A0005 
            A0003. Imperial County Public Works Department 
            A0004. California State Assembly - Lori Saldaña 
            A0005. San Diego County Board of Supervisors - Dianne Jacob 
               
            Comment Set A0006 
            A0006. Campo Kumeyaay Nation  part 1  
            part 2  
            part 3 
             
               
            Comment 
            Sets A0007-A0008 
            A0007. California State Senate - Sen. Christine Kehoe 
            A0008. Pala Band of Mission Indians Tribal Historic Preservation Office 
               
            Comment Set A0009 
            A0009. U.S. Department of Agricultural Forest Services  part 1  
            part 2 (6.3MB) 
             
               
            Comment Set A0010 
            A0010. Imperial Irrigation District 
               
            Comment Set A0011 
            A0011. Padre Dam Municipal Water District 
               
            Comment Set A0012 
            A0012. California Department of Transportation 
               
            Comment Set A0013 
            A0013. Imperial County Air Pollution Control Board  part 1  
            part 2 
             
               
            Comment Sets A0014-A0015 
            A0014. Elsinore 
            Valley Municipal Water District 
            A0015. Rincon 
            Band of Luiseño Indians 
               
            Comment Sets 
            A0016-A0017 (3.3MB) 
            A0016. California Department of Transportation 
            A0017. United States Navy 
               
            Comment Set A0018 
            A0018. County of San Diego   part 1  
            part 2 (4.0MB)  
            part 3 
             
               
            Comment Sets A0019-A0020 (3.8MB) 
            A0019. La Jolla Band of Luiseño Indians 
            A0020. Imperial County Board of Supervisors 
               
            Comment Sets 0021-A0022 
            A0021. California Legislators 
            A0022. Native American Heritage Commission 
               
            Comment 
            Set A0023 
            A0023. California State Lands Commission 
               
            Comment Set A0024 
            A0024. California Department of Fish & Game and U.S. Fish & 
            Wildlife Service  part 1  
            part 2  
            part 3  
            part 4  
            part 5 
               
            Comment 
            Set A0025 (4.2MB) 
            A0025. City of Santee 
               
            Comment 
            Sets A0026-A0028 (3.2MB) 
            A0026. California Department of Toxic Substances Control 
            A0027. U.S. Marine Corps Air Station Miramar 
            A0028. City of San Diego Office of the City Attorney - Michael Aguirre 
               
            Comment 
            Set A0029 
            A0029. California Independent System Operator 
               
            Comment Set A0030 
            A0030. U.S. Environmental Protection Agency  part 1  
            part 2 
             
               
            Comment Set A0031 
            A0031. Pechanga Indian Reservation  part 1 (3.6MB)  
            part 2 
               
            Comment Sets A0032-A0034 (5.1MB) 
            A0032. City of Poway 
            A0033. State Water Resources Control Board 
            A0034. Viejas Tribal Government 
               
            Comment 
            Set A0035 
            A0035. U.S. Department of the Interior - Bureau of Indian Affairs 
               
            Comment 
            Set A0036 
            A0036. Agua Caliente Band of Cahuilla Indians 
               
            Comment 
            Set A0037 
            A0037. California Department of Forestry & Fire Protection 
              
            Fig. 
            A1-31. Borrego Mountain West Butte (3.6MB) 
            Fig. A9-3A. 
            KVP 86 Existing View (3.6MB) 
            Fig. A9-3B. 
            KVP 86 Simulation (3.7MB) 
            Fig. A9-3C. SR 
            78 Existing View (3.8MB) 
            Fig. A9-5A. 
            KVP 87 Existing View 
            Fig. A9-5B. 
            KVP 87 Simulation 
            Fig. A9-5C. 
            KVP 88 Existing View 
            Fig. A9-5D. 
            KVP 88 Simulation 
            Fig. A9-38A. 
            KVP 89 Existing View (3.2MB) 
            Fig. A9-38B. 
            KVP 89 Simulation (3.2MB) 
            Fig. A9-38C. 
            KVP 90 Existing View 
            Fig. A9-38D. 
            KVP 90 Simulation 
            Fig. A9-38E. 
            KVP 91 Existing View (3.5MB) 
            Fig. A9-38F. 
            KVP 91 Simulation (3.5MB) | 
        
 
          |  
             Written Comments Received from Groups, Organizations, 
              Nonprofits, and Private Companies 
                
              Comment 
              Set B0001 
              B0001. Potrero Community Planning Group 
                 
              Comment Set B0002 
              B0002. Boulevard Planning Group  part 1  
              part 2  
              part 3  
              part 4  
              part 5 (4.9MB)  
              part 6 (3.5MB)  
              part 7 (3.5MB)  
              part 8 (3.9MB)  
              part 9 (4.6MB)  
              part 10 (4.9MB) 
                 
              Comment Set B0003 
              B0003. Back Country Coalition  part 1 (3.7MB)  
              part 2 
                 
              Comment 
              Set B0004 
              B0004. Stirling Energy System Media Relations 
                 
              Comment 
              Set B0005 
              B0005. Anza-Borrego Foundation 
                 
              Comment Set B0006 
              B0006. Mussey Grade Road Alliance  part 1  
              part 2  
              part 3 
                 
              Comment 
              Set B0007 
              B0007. Torrey Hawks Hang Gliding Club 
                 
              Comment 
              Set B0008 
              B0008. Lansing Industries 
                 
              Comment 
              Sets B0009-B0010 
              B0009. Julian Community Planning Group 
              B0010. Jamul/Dulzura Community Planning Group 
                 
              Comment Set B0011 
              B0011. Utility Consumers' Action Network (UCAN)  part 1 (3.1MB)  
              part 2 (3.2MB)  
              part 3 
               
                 
              Comment Set B0012 
              B0012. Powers Engineering  part 1 (3.1MB)  
              part 2 
                
              Comment 
              Set B0013 
              B0013. Community Alliance for Sensible Energy (CASE) 
                
              Comment Set B0014 
              B0014. Underground Powerlink Association  part 1  
              part 2 (3.8MB)  
              part 3 (10.5MB)  
              part 4 (7.7MB) 
                
              Comment 
              Sets B0015-B0017 
              B0015. Descanso Planning Group 
              B0016. Save Potrero 
              B0017. The Committee for Responsible Growth 
                
              Comment Set B0018 
              B0018. The Nevada Hydro Company Inc.  part 1  
              part 2  
              part 3  
              part 4  
              part 5  
              part 6  
              part 7  
              part 8  
              part 9 (3.1MB)  
              part 10 
                 
              Comment 
              Sets B0019-B0021 (5.2MB) 
              B0019. Torrey Hills Community Planning Board 
              B0020. Starlight Mountain Estates Owners 
              B0021. Fox Outdoor School 
                 
              Comment 
              Sets B0022-B0023 (3.3MB) 
              B0022. Carmel Valley Community Planning Board 
              B0023. Natural Resources Defense Council 
                 
              Comment 
              Sets B0024-B0026 
              B0024. Ninth District PTA 
              B0025. Save Our Bay 
              B0026. ENPEX 
                 
              Comment 
              Sets B0027-B0031 (3.4MB) 
              B0027. Pacific Crest Trail Association 
              B0028. Desert Protective Council 
              B0029. Barratt American Inc. 
              B0030. California State Parks Foundation 
              B0031. San Dieguito River Parks Joint Powers Authority 
                 
              Comment 
              Sets B0032-B0037 
              B0032. Deerhorn Valley Committee of Ongoing Relief Effort 
              B0033. Rancho Peñasquitos Concerned Citizens 
              B0034. MMR Power Solutions LLC 
              B0035. Imperial County Farm Bureau 
              B0036. CALEnergy Operating Corporation 
              B0037. Crest-Dehesa-Granite Hills-Harbison Canyon Subregional Planning 
              Group 
                 
              Comment 
              Set B0038 (4.7MB) 
              B0038. California Farm Bureau Federation 
                 
              Comment 
              Set B0039 
              B0039. California Wilderness Coalition 
                 
              Comment 
              Set B0040 
              B0040. Wilderness 4 All 
                 
              Comment Set B0041 
              B0041. Center for Biological Diversity  part 1 (3.6MB)  
              part 2 (4.2MB)  
              part 3 (10.6MB)  
              part 4 (9.4MB)  
              part 5 (17.9MB)  
              part 6 
                 
              Comment 
              Set B0042 
              B0042. San Diego County Archaeological Society 
                 
              Comment Set B0043 
              B0043. SunCal Companies  part 1  
              part 2 
                 
              Comment 
              Set B0044 
              B0044. San Diego Sierra Club 
                 
              Comment 
              Sets B0045-B0050 (3.4MB) 
              B0045. Southern California Edison 
              B0046. EnviroMINE 
              B0047. California State Park Rangers Association 
              B0048. Torrey Hills Community Coalition 
              B0049. Sempra Generation 
              B0050. Del Mar Mesa Community Planning Board 
                 
              Fig. 
              B22-1. Carmel Valley Gazebo Overlook Park (3.2MB) 
              Fig. B30-1. 
              Fonts Point (4.0MB) 
           | 
        
 
          Oral Comments Received at Public Participation 
            Hearings 
            Speakers at San Diego 2/25/08  part 1 (3.4MB)  
            part 2  
            part 3 (3.5MB)  
            part 
            4 (3.5MB) 
            Speakers at Pine Valley 2/25/08  part 1  
            part 2  
            part 3 (3.7MB) 
            Speakers 
            at Borrego Springs 2/26/08 (3.9MB) 
            Speakers at Ramona 2/26/08  part 1  
            part 2 
            Speakers at Julian 2/27/08  part 1  
            part 2 | 
        
 
          |  
             Written Comments Received from Private Citizens 
                
              Comment 
              Sets D0001-D0013 (7.4MB) 
              D0001. Cindy Buxton 
              D0002. Austin Puglisi & Anne Westenhaver 
              D0003. Fred Emery 
              D0004. Chris Loughridge 
              D0005. Roena Oesting 
              D0006. Aurele Gilleran 
              D0007. Elena & John Thompson 
              D0008. Karen & Paul Klimowitch,  
              D0009. Darcy Lewis 
              D0010. Nancy & Eric Breisch and Angelo & Enrichetta Spinelli 
              D0011. Paul Hoover 
              D0012. John Mendenhall 
              D0013. Janet Huey 
                 
              Comment 
              Set D0014 
              D0014. Meade Norman 
                 
              Comment 
              Sets D0015-D0027 
              D0015. Paul Koeshall 
              D0016. Laura Copic 
              D0017. Sandra Thorpe 
              D0018. Jennifer White 
              D0019. Robie & Jane Faulkner 
              D0020. Gene Frick 
              D0021. Liz Kruidenier 
              D0022. Stacey Landfield 
              D0023. Michael Milligan 
              D0024. Slawomir Ulanicki 
              D0025. Sam Webb 
              D0026. Betsy Mackey 
              D0027. Greg & Linda Miller 
                 
              Comment 
              Sets D0028-D0031 
              D0028. Arthur Fine - David H. Batchelder 2007 Trust 
              D0029. George Sardina 
              D0030. Jack Hazlitt 
              D0031. David MacDonald 
                 
              Comment 
              Sets D0032-D0042 
              D0032. Diane Winship 
              D0033. Sally Snipes 
              D0034. Dan Lawrence 
              D0035. Barbara Parcells 
              D0036. Mrs. Michal Hansen 
              D0037. Ruth D'Spain 
              D0038. Thomas Walsh 
              D0039. Roger Jerney 
              D0040. Kathleen Beck 
              D0041. Robert Baran 
              D0042. Daniel Beeman 
                 
              Comment 
              Sets D0043-D0056 
              D0043. George Ellison 
              D0044. Beverly Esry 
              D0045. Larry Hogue 
              D0046. Shelia Jamison 
              D0047. Larry Johnson 
              D0048. Armin & Rhea Kuhlman 
              D0049. Donald Larson 
              D0050. Callie Mack 
              D0051. Lynn Mulholland 
              D0052. Thomas & Judith Myers 
              D0053. Shirley Perkiss 
              D0054. Kalu Rains 
              D0055. Denise Bradshaw 
              D0056. Ellen Shively 
                 
              Comment 
              Sets D0057-D0060 
              D0057. Tanja Sutton 
              D0058. Paul Vachal 
              D0059. Kimberly Schulz 
              D0060. Sheryll Rainey Strickland 
                 
              Comment 
              Sets D0061-D0083 (4.0MB) 
              D0061. Warren Coon 
              D0062. Jeanette Hartman 
              D0063. Antoinette Goodbody 
              D0064. Anne E. Johnson 
              D0065. John Raifsnider 
              D0066. John Bainbridge 
              D0067. Jennifer Smith 
              D0068. Luke Smith 
              D0069. Debbie Olsen 
              D0070. Judy Fender 
              D0071. Lorien Lehmer 
              D0072. Mary Ann Keats 
              D0073. Joan Bernard 
              D0074. Monica Gallina 
              D0075. Mary Lou Kugler 
              D0076. John Horton 
              D0077. Patricia & Travis Noblett 
              D0078. Rich Caputo 
              D0079. Gidon Taylor Singer 
              D0080. Art Cole 
              D0081. James Lindemann 
              D0082. Bob Veborg 
              D0083. Skip Miller 
                 
              Comment 
              Set D0084 
              D0084. William Crawley & Cathey Ramsey 
                 
              Comment 
              Sets D0085-D0107 (3.4MB) 
              D0085. Roxanne Arispe 
              D0086. Charles Zahn 
              D0087. Valerie Sanfilippo 
              D0088. George Hopkins 
              D0089. Roland Wilhelmy 
              D0090. Dave Concannon 
              D0091. Dave & Mary Nuffer 
              D0092. Denis James 
              D0093. Anita Alvarez Williams 
              D0094. Louise Russell 
              D0095. Claudia White 
              D0096. Kay & Vern Schoore 
              D0097. Ted Mullen 
              D0098. Phil & Norma Decker 
              D0099. Tim Larson 
              D0100. Curtis Dowds 
              D0101. Dan Hom 
              D0102. Donald Coltrain 
              D0103. Dave & Rita Pinkerton 
              D0104. Joyal Hoyt 
              D0105. Franklin Barnes 
              D0106. Gregory D. Courson 
              D0107. Benjamin Kwon 
                 
              Comment 
              Sets D0108-D0110 
              D0108. Ken Childs 
              D0109. Norman Feiget 
              D0110. Bob Stuart 
                 
              Comment 
              Sets D0111-D0118 
              D0111. Denis Trafecanty 
              D0112. Gordon & Janet Gastil 
              D0113. Richard Moore 
              D0114. Bruce Johnson 
              D0115. Trudy Richard 
              D0116. Stephen Rogers 
              D0117. Jerry Hughes 
              D0118. John Gibson 
                 
              Comment 
              Set D0119 (4.3MB) 
              D0119. Jacqueline Ayer 
                 
              Comment 
              Sets D0120-D0126 (3.5MB) 
              D0120. Nathan Weflen 
              D0121. James & Sally Lindemann 
              D0122. Daniel & Gloria Harrington 
              D0123. Judy Haldeman 
              D0124. Donn Bree 
              D0125. Daniel Barger 
              D0126. Donald Lee 
                 
              Comment 
              Sets D0127-D0139 (4.5MB) 
              D0127. Ron Sanders 
              D0128. Robert Hammond 
              D0129. Randolph & Barbara Lenac 
              D0130. Jessica Hanson - Star Ranch 
              D0131. Denise Morse 
              D0132. Randy Rusch 
              D0133. Michelle & Johnnylee Allen 
              D0134. Joan Rosen 
              D0135. Ester Rubin 
              D0136. Jeanne Johnstone 
              D0137. Judith Withers 
              D0138. Michelle Earnshaw 
              D0139. Sharon Lynch 
                 
              Comment 
              Set D0140 
              D0140. Myrna Wosk 
                 
              Comment 
              Sets D0141-D0170 
              D0141. Andrew Zack 
              D0142. Shannon Davis 
              D0143. John & Linda Geels 
              D0144. John & Phyllis Bremer 
              D0145. Kathy Easter 
              D0146. Kenneth Justo 
              D0147. James Valentine 
              D0148. James Taylor 
              D0149. Bryn Anderson 
              D0150. Letter sent by 603 individuals 
              D0151. Teresa & Ron Hall 
              D0152. Jeff Martin 
              D0153. Paul Donatt 
              D0154. Kaye Van Nevel 
              D0155. John Forst 
              D0156. Jon Muench 
              D0157. Billie Clement 
              D0158. George Johnson - Johnson International Inc. 
              D0159. Adrianna Howe 
              D0160. Nancy Bidlack 
              D0161. Jeri Beth Zemon 
              D0162. Tricia Elisara 
              D0163. Marilyn Parker 
              D0164. Sharon Zemon 
              D0165. Phil Bryson 
              D0166. Joan & Chuck Pollycutt 
              D0167. Michael Pinto 
              D0168. Randi W. Wortman 
              D0169. Hector Fuentes 
              D0170. Toni Holtz 
                 
              Comment 
              Sets D0171-D0174 
              D0171. David Stout 
              D0172. Violet Devoe 
              D0173. Patty Reed & Lila O'Connell 
              D0174. Shirley Beyer 
                 
              Comment 
              Set D0175 (7.1MB) 
              D0175. Glenn Stokes 
                
              Comment 
              Sets D0176-D0188 
              D0176. Trixie Deveau 
              D0177. Janine Palmer 
              D0178. Dick Martin 
              D0179. Ivars Ozolins 
              D0180. Terence Palmer 
              D0181. Blake Jopling 
              D0182. Steve Green 
              D0183. Carl Johnson 
              D0184. Morley & Lorell Hardaker 
              D0185. Kay Stewart 
              D0186. Catherine Gorka 
              D0187. Paul Zablotny 
              D0188. Lynn Snyder 
                
              Comment 
              Set D0189 
              D0189. Theresa Acerro 
                 
              Comment 
              Set D0190 (3.9MB) 
               D0190. Katherine 
              Moretti - Carristo Ranch 
                 
              Comment 
              Sets D0191-D0197 (3.3MB) 
               D0191. Robert & Kris Loving 
              D0192. Charles Jerney 
              D0193. Ann K. Smith 
              D0194. Alan House 
              D0195. Charles Keyton 
              D0196. Joyce & David Costello 
              D0197. Gretchen Glaeser 
                 
              Comment 
              Sets D0198-D0204 (3.5MB) 
               D0198. Heidi L. Kuhn 
              D0199. Kevin Krekelberg 
              D0200. Coral Thuet 
              D0201. Lauren Krekelberg 
              D0202. William H. Schmidt 
              D0203. Jan Hedlun 
              D0204. Dennis & Connie Berglund 
                 
              Comment 
              Sets D0205-D0213 
              D0205. John A. Contasti 
              D0206. Angela Case 
              D0207. Martha Sullivan 
              D0208. Barbara Carr 
              D0209. Joseph Dillon 
              D0210. Bruce Bowen & Junona Jonas 
              D0211. Jeff Sykes 
              D0212. Bill, Dolores, Richard, and Michele Van Leeuwen - Bullfrog 
              Farms 
              D0213. Dave Riney 
                 
              Comment 
              Sets D0214-D0220 
              D0214. Dave Smith 
              D0215. Tim & Mona Petersen - Rock Canyon Ranch and Vineyards 
              D0216. Sally Worttman 
              D0217. Glenda Kimmerly 
              D0218. Walter & Suzanne Kirkwood 
              D0219. Janet Anderson 
              D0220. Britta Lee Shain 
                 
              Comment 
              Sets D0221-D0229 (5.7MB) 
              D0221. Janis Shackelford - Lakeside Community Planning Group 
              D0222. Alex Hoefer 
              D0223. David Voss 
              D0224. Dennis Jopling 
              D0225. Gary Bradbury 
              D0226. Michael Blakley 
              D0227. Lina W. Serrano 
              D0228. Harold Brandt 
              D0229. Allan Trust 
           | 
        
 
          Written Comments Received from the 
            Applicant 
            Comment 
            Set E0001 
            Comment Set E0002  part 1  
            part 2 (3.5MB)  
            part 3  
            part 4  
            part 5  
            part 6  
            part 7 (4.2MB) 
            Comment Set E0003  part 1  
            part 2  
            part 3  
            part 4  
            part 5  
            part 6  
            part 7  
            part 8  
            part 9  
            part 10 (3.1MB) 
            Comment Set E0004  part 1  
            part 2 (5.7MB) 
            Attachments to Comment 
            Set E0004: 
            - Attachment 
            1: Existing Right-of-Way Map 
            - Attachment 
            2: Letter from Bureau of Land Management 
            - Attachment 
            3: SDG&E Comments on ABDSP General Plan (8.0MB) 
            - Attachment 
            4: California Energy Commission Hearing Transcript (7.7MB) 
            - Attachment 
            5a: Route Showing Adjusted Right-of-way 
            - Attachment 
            5b: Route Showing Existing Right-of-way 
            - Attachment 
            6: Multiple Species Conservation Program - City of San Diego 
            MSCP Subarea Plan (7.1MB) 
            - Attachment 
            7: Bighorn Sheep Photos (5.8MB) 
            - Attachment 
            8: Santa Ysabel All Underground (DEIR Alternative #5) - 
            Santa Ysabel Indian Reservation 
            - Attachment 
            9: I-8 Alternative with Campo North Option (DEIR Alternative #4) - 
            Campo Indian Reservation (5.1MB) 
            - Attachment 
            10: Letter from Campo Kumeyaay Nation 
            - Attachment 
            11: I-8 Alternative with Modified Route D Alternative (DEIR Alternative #4) - 
            La Posta Indian Reservation 
            - Attachment 
            12: I-8 Alternative - La Posta Indian Reservation 
            - Attachment 
            13: Environmental Mitigation Schedule | 
        
 
            
            Comments and Responses on the Recirculated Draft EIR/Supplemental 
            Draft EIS | 
        
 
          Written Comments Received from Public 
            Agencies and Tribal Governments 
              
            Comment 
            Sets F0001-F0002 
            F0001. Imperial County Planning & Development Services 
            F0002. Imperial County Air Pollution Control District 
              
            Comment Set F0003 
            F0003. USDA Cleveland National Forest 
              
            Comment 
            Sets F0004-F0007 (3.8MB) 
            F0004. Caltrans District 11 
            F0005. City of Santee 
            F0006. Calif Department of Fish & Game and U.S. Fish & Wildlife 
            Service 
            F0007. California Dept of Conservation, Division of Land Resource 
            Protection 
              
            Comment Set F0008 (3.1MB) 
            F0008. Viejas Band of Kumeyaay Indians 
              
            Comment 
            Set F0009 
            F0009. U.S. Department of Interior, Bureau of Indian 
            Affairs 
              
            Comment Set F0010 
            F0010. County of San Diego, Department of Planning 
            and Land Use  part 1  
            part 2  
            part 3  
            part 4 
              
            Comment 
            Sets F0011-F0014 
            F0011. United States 
            Environmental Protection Agency 
            F0012. United States Marine Corps Air Station Miramar 
            F0013. Imperial County Public Works Department 
            F0014. Vista Irrigation District  | 
        
 
          Written Comments Received from Groups, 
            Organizations, Nonprofits, and Private Companies 
              
            Comment 
            Sets G0001-G0003 
            G0001. Starlight Mountain Estate Owners 
            G0002. Ramona Community Planning Group 
            G0003. Citizens Oversight Projects 
              
            Comment 
            Sets G0004-G0006 
            G0004. La Posta-Thing Valley Preservation Society 
            G0005. Lambron Lakeside Ranch 
            G0006. Potrero Community Planning Group 
              
            Comment 
            Sets G0007-G0008 
            G0007. The Committee for Responsible Growth 
            G0008. Lansing Industries 
              
            Comment 
            Set G0009 
            G0009. San Diego County Archaeological Society, Inc. 
              
            Comment 
            Sets G0010-G0013 
            G0010. SunCal Companies 
            G0011. Pacific Crest Trail Association 
            G0012. Rancho Peñasquitos Concerned Citizens 
            G0013. Mussey Grade Road Alliance 
              
            Comment Set G0014 
            G0014. California Botanical Habitat  part 1 (6.2MB)  
            part 2 (6.5MB)  
            part 3 (4.5MB)  
            part 4 (6.6MB)  
            part 5 (4.5MB)  
            part 6 (5.9MB)  
            part 7 (9.3MB)  
            part 8 (5.6MB)  
            part 9 (5.9MB)  
            part 10 (14.2MB)  
            part 11 (5.2MB)  
            part 12 (3.6MB)  
            part 13 (5.1MB)  
            part 14 (4.9MB)  
            part 15 (3.8MB)  
            part 16 (4.0MB)  
            part 17 (9.4MB)  
            part 18 (3.7MB)  
            part 19 (7.4MB)  
            part 20 (6.0MB)  
            part 21 (3.5MB) 
              
            Comment 
            Set G0015 (5.2MB) 
            G0015. 
            Boulevard Planning Group 
              
            Comment 
            Set G0016 
            G0016. Bullfrog Farm 
              
            Comment 
            Set G0017 
            G0017. JAM Investments  part 1 (3.8MB)  
            part 2 (8.2MB)  
            part 3  
            part 4 (6.9MB) 
              
            Comment 
            Set G0018 (3.7MB) 
            G0018. Center for Biological Diversity and Sierra 
            Club | 
        
 
          Written Comments Received from Private 
            Citizens 
              
            Comment 
            Sets H0001-H0007 
            H0001. Pam & Greg Nelson 
            H0002. Mike Hughes 
            H0003. Bruce Wilcox 
            H0004. Nathan & Adrianna Howe 
            H0005. Daniel Wise 
            H0006. Shannon & William Davis 
            H0007. Raymond A. Jacobson 
              
            Comment 
            Sets H0008-H0013 
            H0008. Lina Serrano - Boulder Oaks Ranch 
            H0009. Dwight & Cara Baker 
            H0010. Gary Hoyt 
            H0011. Betty Moss 
            H0012. George Ellison 
            H0013. Robie Faulkner 
              
            Comment 
            Sets H0014-H0015 
            H0014. Patricia Stuart 
            H0015. Katherine Moretti - Moretti Family Carristo Ranch 
              
            Comment 
            Sets H0016-H0019 
            H0016. Mary Aldern 
            H0017. Jay Shrock - La Posta Ranch 
            H0018. Judith Withers 
            H0019. Dennis & Connie Berglund - Sandy Creek Ranch 
              
            Comment 
            Set H0020 
            H0020. Jacqueline Ayer 
              
            Comment 
            Sets H0021-H0023 (3.5MB) 
            H0021. Nathan Weflen 
            H0022. Mona & Tim Petersen - Rock Canyon Ranch & Vineyards 
            H0023. Jeff Martin 
              
            Comment 
            Sets H0024-H0025 
            H0024. Denis Trafecanty & Glenda Kimmerly 
            H0025. Tulloch Family Partners 
              
            Comment 
            Sets H0026-H0027 (3.2MB) 
            H0026. Cindy Buxton 
            H0027. Rodney Starkey & Dr. A. Starkey DVM 
              
            Comment 
            Sets H0028-H0032 
            H0028. Lorelei Howard 
            H0029. Jeffrey McKernan 
            H0030. Stacey Landfield 
            H0031. Kathleen Beck 
            H0032. V. Doyle 
              
            Comment 
            Set H0033 
            H0033. Greg Courson & Jeffrey Holt  part 1  
            part 2 
              
            Comment 
            Sets H0034-H0036 
            H0034. Colleen Holmes 
            H0035. Cheryl Lenz 
            H0036. William Bretz & Lesley Barling | 
        
 
          Written Comments Received from the 
            Applicant 
              
            Comment 
            Set I0001 
            I0001. San Diego Gas & Electric Company  part 1 (4.4MB)  
            part 2 (4.4MB)  
            part 3 | 
        
 
            
            Draft EIR/EIS as modified in response to comments | 
        
 
          A. Introduction 
            A.1. Overview of Proposed Project 
            A.2. Purpose and Need for the Proposed Project 
            A.3. Procurement and Resource Adequacy 
            A.4. SDG&E's Electric Transmission System 
            A.5. Renewable Energy in the Imperial Valley 
            A.6. Agency Use of This Document 
            A.7. Reader's Guide to This EIR/EIS 
            A.8. References  | 
        
 
          B. Project 
            Description 
            B.1. Introduction 
            B.2. Overview of the Proposed Project 
            B.3. Proposed Project Components 
            B.4. Construction Activities and Procedures 
            B.5. Operation and Maintenance 
            B.6. Connected Actions and Indirect Effects 
            B.7. Applicant Proposed Measures 
            B.8. References 
             Fig. 
            ES-1. Proposed Project with Connected Actions and Future System 
            Expansions (4.9MB) 
            Fig. 
            B-2. Proposed Project Links 
            Fig. B-3. 
            Imperial Valley Link (3.9MB) 
            Fig. 
            B-3a. Imperial Valley Link - N6 Private Land Revision 
            Fig. B-4. Anza-Borrego 
            Link (7.1MB) 
            Fig. B-4a. 
            Anza-Borrego ROW History of Surveys 
            Fig. 
            B-4b. Anza-Borrego Link: Around Narrows Substation Revision 
            Fig. B-5. 
            Central Link (5.4MB) 
            Fig. 
            B-5a. Central Link: Central East Substation Ingress/Egress 
            Fig. B-6. 
            Inland Valley Link 
            Fig. B-7. 
            Inland Valley Link Detail 
            Fig. B-8. 
            Coastal Link (4.8MB) 
            Fig. B-9. 
            Coastal Link Detail 
            Fig. B-10. 
            Other System Upgrades 
            Fig. B-11. 
            Sycamore Canyon - Elliot Substation Reconductor 
            Fig. 
            B-12a. 230 kV Transmission System Expansion 
            Fig. 
            B-12b. Future Transmission System Expansion: 500 kV Central East 
            to Riverside 
            Fig. B-13. Typical 500 kV Single-Circuit Lattice Tower: Imperial Valley 
            and Central Links* 
            Fig. B-14. Typical 500 kV Single-Circuit Tubular Steel Pole: Imperial 
            Valley Link* 
            Fig. B-15. Typical 500 kV Single-Circuit Steel H-Frame Tower: Imperial 
            Valley and Anza-Borrego Links* 
            Fig. B-16. Typical 230 kV Double-Circuit Tubular Lattice Tower: Central, 
            Inland Valley, and Coastal Links* 
            Fig. B-17. Typical 230 kV Double-Circuit Tubular Steel Pole: Central, 
            Inland Valley, and Coastal Links* 
            Fig. B-18. Typical 230 kV Single-Circuit Steel Transition Tower (Cable 
            Pole): Inland Valley and Coastal Links* 
            Fig. B-19. Typical 500 kV Single-Circuit Lattice Tower with 69 kV 
            or 92 kV Underbuild: Anza-Borrego and Central Links* 
            Fig. B-20. Typical 69 kV Double-Circuit Tubular Steel Pole: Central 
            Link* 
            Fig. B-21. Typical 69 kV Single-Circuit Wood Transition Tower (Cable 
            Pole): Anza-Borrego Link* 
            Fig. B-22. Typical 69 kV Single-Circuit Steel Transition Tower (Cable 
            Pole)* 
            Fig. B-23. Typical 92 kV Single-Circuit Steel Transition Tower (Cable 
            Pole): Anza-Borrego Link* 
            Fig. B-24. Typical 230 kV Duct Bank: Inland Valley and Coastal Links 
            (vertical configuration)* 
            Fig. B-25. Typical 69 or 92 kV Duct Bank: Anza-Borrego Link* 
            Fig. B-26. 
            Typical 230 kV Duct Bank: Coastal Link (horizontal configuration) 
            Fig. B-27. Typical 69 kV Vault: Anza-Borrego Link* 
            Fig. B-28. Typical 92 kV Vault: Anza-Borrego Link* 
            Fig. B-29. Typical 230 kV Vault: Inland Valley and Coastal Links* 
            Fig. 
            B-30. Imperial Valley Substation: Proposed Modifications 
            Fig. 
            B-31. Central East Substation: 500/230/12 kV Equipment One Line 
            Diagram 
            Fig. 
            B-32. Central East Substation: 500/230 kV Switchyard: General 
            Arrangement 
            Fig. 
            B-33. Central East Substation: 500/230 kV Switchyard: Section 
            A-A 
            Fig. 
            B-34. Central East Substation: 500/230 kV Switchyard: Section 
            B-B & D-D 
            Fig. 
            B-35. Central East Substation: 500/230 kV Switchyard: Section 
            C-C 
            Fig. 
            B-36. Central East Substation: Grading Plan 
            Fig. 
            B-37. Central East Substation: Landscape Plan 
            Fig. 
            B-38. Sycamore Canyon Substation: Proposed Modifications 
            Fig. B-39. 
            Peñasquitos Substation: Proposed Modifications 
            Fig. B-40. 
            San Luis Rey Substation: Proposed Modifications 
            Fig. B-41. 
            South Bay Substation: Proposed Modifications 
            Fig. 
            B-42a. Construction Schedule Tasks 1-21 
            Fig. 
            B-42b. Construction Schedule Tasks 22-42 
            Fig. 
            B-42c. Construction Schedule Tasks 43-64 
            Fig. 
            B-43. Construction Labor 
            Fig. 
            B-44a. Connected Actions, SES Solar Two Project and 230 kV Transmission 
            Line 
            Fig. 
            B-44b. Connected Actions, SES Solar Two Project Site 
            Fig. 
            B-44c. Connected Actions, SES Solar Two Project Components 
            Fig. 
            B-46. Connected Actions: Esmeralda-San Felipe Geothermal Project | 
        
 
          |  
             C. Alternatives 
              C.1. Alternatives Development and Screening Process 
              C.2. Alternatives Screening Methodology 
              C.3. Summary of Screening Results 
              C.4. Alternatives Evaluated in this EIR/EIS 
              C.5. Alternatives Eliminated from Full EIR/EIS Evaluation 
              C.6. No Project/No Action Alternative 
              C.7. References 
              Fig. 
              C-1. Imperial Valley Link Alternatives Retained 
              Fig. 
              ES-13. Anza-Borrego Link Alternatives Retained 
              (5.5MB) 
              Fig. ES-14. 
              Central Link Alternatives Retained 
              (6.1MB) 
              Fig. 
              C-4. Inland Valley Link Alternatives Retained 
              Fig. ES-16. 
              Coastal Link Alternatives Retained 
              (3.4MB) 
              Fig. ES-17. 
              Southwest Powerlink Alternatives Retained 
              Fig. C-7. 
              System Alternatives Retained 
              Fig. 
              C-8. Components of New In-Area All-Source and Renewable Generation 
              Alternatives 
              Fig. 
              C-9. Imperial Valley Link Alternatives Eliminated 
              Fig. 
              C-10. Anza-Borrego Link Alternatives Eliminated 
              Fig. C-11. 
              Central Link Alternatives Eliminated 
              Fig. 
              C-12. Inland Valley Link Alternatives Eliminated 
              Fig. C-13. 
              Coastal Link Alternatives Eliminated 
              Fig. C-14. 
              SWPL Alternatives Eliminated 
              Fig. C-15. 
              System Alternatives Eliminated 
              Fig. C-16. DG Penetration Projections (Nameplate Capacity)* 
           | 
        
 
          D.1 
            Introduction to Environmental Analysis 
            D.1.1 Introduction/Background 
            D.1.2 Components of the Proposed Project 
            D.1.3 Alternatives 
            D.1.4 Environmental Assessment Methodology 
            Fig. 
            ES-12. Imperial Valley Link: Alternatives Retained (formerly Fig. 
            D.1-1) 
            Fig. 
            ES-13. Anza-Borrego Link: Alternatives Retained (formerly Fig. 
            D.1-2) (5.5MB) 
            Fig. ES-14. 
            Central Link: Alternatives Retained (formerly Fig. D.1-3) (6.1MB) 
            Fig. D.1-4. 
            Mesa Grande Alternative 
            Fig. D.1-5. CNF Existing 
            69 kV Route Alternative 
            Fig. D.1-6. 
            Oak Hollow Road Underground Alternative 
            Fig. D.1-7. 
            San Vicente Road Transition Alternative 
            Fig. D.1-8. 
            Chuck Wagon Road Alternative 
            Fig. 
            D.1-9. Pomerado Road to Miramar Area North Alternative (East) 
            Fig. 
            D.1-10. Pomerado Road to Miramar Area North Alternative (West) 
            Fig. D.1-11. 
            Los Peñasquitos Canyon Preserve-Mercy Road Alternative 
            Fig. 
            D.1-12. Black Mountain to Park Village Road Underground Alternative 
            Fig. 
            3-5. Coastal Link System Upgrades Alternative Revision (formerly 
            Fig. D.1-13) 
            Fig. 
            3-3. Top of the World Substation Alternative Revision (formerly 
            Fig. D.1-14) | 
        
 
          D.2 Biological Resources 
             (3.1MB) 
            D.2.1. Regional Setting and Approach to Data Collection 
            D.2.2. Environmental Setting for the Proposed Project 
            D.2.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.2.4. Significance Criteria and Approach to Impact Assessment 
            D.2.5. Vegetation 
            D.2.6. Jurisdictional Waters and Wetlands 
            D.2.7. Introduction of Invasive, Non-native, or Noxious Plant Species 
            D.2.8. Dust 
            D.2.9. Listed or Sensitive Plant Species 
            D.2.10. Construction Activities: Disturbance to Wildlife 
            D.2.11. Listed or Sensitive Wildlife Species 
            D.2.12. Nesting Birds 
            D.2.13. Wildlife Corridors, Movement of Fish, and/or Nursery Sites 
            D.2.14. Bird Electrocution and/or Collision 
            D.2.15. Increased Predation of Listed and Sensitive Wildlife Species 
            by Ravens 
            D.2.16. Maintenance Activities: Disturbance to Wildlife and Wildlife 
            Mortality 
            D.2.17. Other System Upgrades 
            D.2.18. Future Transmission System Expansion 
            D.2.19. Connected Actions and Indirect Effects 
            D.2.20. Overall Biological Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.2.21. Imperial Valley Link Alternatives Impacts and Mitigation Measures 
            D.2.22. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.2.23. Central Link Alternatives Impacts and Mitigation Measures 
            D.2.24. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.2.25. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.2.26. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.2.27. Mitigation Monitoring, Compliance, and Reporting Table 
            D.2.28. References 
            Fig. 
            D.2-1. Biological Resources Overview: Imperial Valley Link 
            Fig. 
            D.2-2. Biological Resources Overview: Anza-Borrego Link 
            Fig. 
            D.2-3. Biological Resources Overview: Central Link 
            Fig. 
            D.2-4. Biological Resources Overview: Inland Valley Link 
            Fig. 
            D.2-5. Biological Resources Overview: Coastal Link 
            Fig. 
            D.2-6. Biological Resources Overview: Sycamore Canyon-Elliot Substation 
            Reconductor 
            Fig. D.2-7. 
            Sample Proposed Project Biological Resources/Impacts Map 
            (5.5MB) 
             | 
        
 
          D.3 Visual Resources 
            D.3.1. Regional Setting and Approach to Baseline 
            Analysis 
            D.3.2. Environmental Setting for the Proposed Project 
            D.3.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.3.4. Significance Criteria and Approach to Impact Assessment 
            D.3.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.3.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.3.7. Central Link Impacts and Mitigation Measures 
            D.3.8. Inland Valley Link Impacts and Mitigation Measures 
            D.3.9. Coastal Link Impacts and Mitigation Measures 
            D.3.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.3.11. Future Transmission System Expansion 
            D.3.12. Connected Actions and Indirect Effects 
            D.3.13. Overall Visual Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.3.14. Imperial Valley Link Alternatives Impacts and Mitigation Measures 
            D.3.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.3.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.3.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.3.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.3.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.3.20. Mitigation Monitoring, Compliance, and Reporting Table 
            D.3.21. References 
            Fig. 
            D.3-1A. Visual Resources: Imperial Valley Link 
            Fig. 
            D.3-1B. Visual Resources: Anza-Borrego Link 
            Fig. D.3-1C. 
            Visual Resources: Central Link 
            Fig. 
            D.3-1D. Visual Resources: Inland Valley Link 
            Fig. D.3-1E. 
            Visual Resources: Coastal Link 
            Fig. D.3-2A/B. 
            Key Viewpoint 1 - Proposed Project - Interstate 8 - Existing View 
            and Simulation 
            Fig. D.3-3A/B. Key 
            Viewpoint 2 - Proposed Project - El Centro Agriculture - Existing 
            View and Simulation 
            Fig. D.3-4A/B. Key 
            Viewpoint 3 - Proposed Project - BLM Road 326 - Existing View and 
            Simulation 
            Fig. D.3-5A/B. Key 
            Viewpoint 4 - Proposed Project - SR78/86 - Existing View and Simulation 
            Fig. D.3-6A. 
            Key Viewpoint 5 - Proposed Project - Old Kane Springs Road - Existing 
            View 
            Fig. D.3-6B. 
            Key Viewpoint 5B - Proposed Project - Old Kane Springs Road - Simulation 
            Fig. D.3-7A. 
            Key Viewpoint 6 - Proposed Project - SR78 The Narrows - Existing View 
            Fig. D.3-7B. 
            Key Viewpoint 6 - Proposed Project - SR78 The Narrows - Simulation 
            Fig. D.3-8A/B. Key 
            Viewpoint 7 - Proposed Project - Mine Wash Road - Existing View and 
            Simulation (4.2MB) 
            Fig. D.3-9A. 
            Key Viewpoint 8 - Proposed Project - Kenyon Overlook - Existing View 
            (3.6MB) 
            Fig. D.3-9B. 
            Key Viewpoint 8 - Proposed Project - Kenyon Overlook - Simulation 
            (4.5MB) 
            Fig. D.3-10A. 
            Key Viewpoint 9 - Proposed Project - Cactus Loop Trail - Existing 
            View (4.4MB) 
            Fig. D.3-10B. 
            Key Viewpoint 9 - Proposed Project - Cactus Loop Trail - Simulation 
            (4.4MB) 
            Fig. D.3-11A. 
            Key Viewpoint 10 - Proposed Project - Yaqui Well Primitive Camping 
            Area - Existing View 
            Fig. D.3-11B. 
            Key Viewpoint 10 - Proposed Project - Yaqui Well Primitive Camping 
            Area - Simulation 
            Fig. D.3-12A. 
            Key Viewpoint 11 - Proposed Project - Westbound SR78 - Existing View 
            (3.5MB) 
            Fig. D.3-12B. 
            Key Viewpoint 11 - Proposed Project - Westbound SR78 - Simulation 
            (4.3MB) 
            Fig. D.3-13A. 
            Key Viewpoint 12 - Proposed Project - Grapevine Canyon Road - Existing 
            View 
            Fig. D.3-13B. 
            Key Viewpoint 12 - Proposed Project - Grapevine Canyon Road - Simulation 
            Fig. D.3-14A. 
            Key Viewpoint 13 - Proposed Project - Upper Grapevine Canyon - Existing 
            View 
            Fig. D.3-14B. 
            Key Viewpoint 13 - Proposed Project - Upper Grapevine Canyon - Simulation 
            Fig. D.3-15A. 
            Key Viewpoint 14 - Proposed Project - Southbound SR79 - Existing View 
            Fig. D.3-15B. 
            Key Viewpoint 14 - Proposed Project - Southbound SR79 - Simulation 
            Fig. D.3-16A. 
            Key Viewpoint 15 - Proposed Project - Mesa Grande Road - Existing 
            View 
            Fig. D.3-16B. 
            Key Viewpoint 15 - Proposed Project - Mesa Grande Road - Simulation 
            Fig. D.3-17A. 
            Key Viewpoint 16 - Proposed Project - Inaja Monument Park Overlook 
            - Existing View (3.3MB) 
            Fig. D.3-17B. 
            Key Viewpoint 16 - Proposed Project - Inaja Monument Park Overlook 
            - Simulation (3.4MB) 
            Fig. D.3-18A/B. Key 
            Viewpoint 17 - Proposed Project - Westbound SR78 Santa Ysabel - Existing 
            View and Simulation (3.1MB) 
            Fig. D.3-19A/B. Key 
            Viewpoint 18 - Proposed Project - BIA Road 51 - Existing View and 
            Simulation (3.2MB) 
            Fig. D.3-20A/B. Key 
            Viewpoint 19 - Proposed Project - Northbound San Felipe Road - Existing 
            View and Simulation 
            Fig. D.3-21A. 
            Key Viewpoint 20 - Proposed Project - San Vicente Road - Existing 
            View 
            Fig. D.3-21B. 
            Key Viewpoint 20 - Proposed Project - San Vicente Road - Simulation 
            Fig. D.3-22A/B. Key 
            Viewpoint 21 - Proposed Project - Southbound SR67 - Existing View 
            and Simulation 
            Fig. D.3-23A/B. 
            Key Viewpoint 22 - Proposed Project - Cypress Canyon Park Drive - 
            Existing View and Simulation 
            Fig. D.3-24A/B. Key 
            Viewpoint 23 - Proposed Project - Spring Canyon Park - Existing View 
            and Simulation 
            Fig. D.3-25A. 
            Key Viewpoint 24 - Proposed Project - Calle De Las Rosas - Existing 
            View 
            Fig. D.3-25B. 
            Key Viewpoint 24 - Proposed Project - Calle De Las Rosas - Simulation 
            Fig. 
            D.3-25C. Chicarita Substation Cable Pole Relocated per Mitigation 
            Measure V-27a 
            Fig. D.3-26. 
            Key Viewpoint 25 - Proposed Project - The Preserve - Existing View 
            and Simulation 
            Fig. D.3-27. 
            Key Viewpoint 26 - Proposed Project - Corte Belleza - Existing View 
            and Simulation 
            Fig. 
            D.3-28. Visual Resources Impact Profile for the Proposed Project 
            Fig. D.3-29. 
            Key Viewpoint 27 - FTHL Eastern Alternative - Jeffrey Road - Existing 
            View 
            Fig. D.3-30A/B. Key 
            Viewpoint 28 - West of Dunaway Alternative - Dunaway Road - Existing 
            View and Simulation 
            Fig. D.3-31. 
            Key Viewpoint 29 - West Main Canal-Huff Road Alternative - Huff Road 
            - Existing View 
            Fig. D.3-32A. 
            Key Viewpoint 30 - Partial Underground 230 kV ABDSP SR78 to S2 - San 
            Felipe Substation - Existing View 
            Fig. D.3-32B. 
            Key Viewpoint 30 - Partial Underground 230 kV ABDSP SR78 to S2 - San 
            Felipe Substation - Simulation 
            Fig. D.3-33A/B. Key 
            Viewpoint 31 - Partial Underground 230 kV ABDSP SR78 to S2 - San Felipe 
            Road South - Existing View and Simulation 
            (3.2MB) 
            Fig. D.3-34A. 
            Key Viewpoint 32 - Partial Underground 230 kV ABDSP SR78 to S2 - San 
            Felipe Road North - Existing View 
            Fig. D.3-34B. 
            Key Viewpoint 32 - Partial Underground 230 kV ABDSP SR78 to S2 - San 
            Felipe Road North - Visual Simulation 
            Fig. D.3-35A/B. Key 
            Viewpoint 33 - Overhead 500 kV ABDSP within Existing ROW - SR78 - 
            Existing View and Simulation (3.1MB) 
            Fig. D.3-36A/B. Key 
            Viewpoint 34 - Santa Ysabel Existing Right of Way - SR79 - Existing 
            View and Simulation 
            Fig. D.3-37A. 
            Key Viewpoint 35 - Santa Ysabel Partial Underground Alternative - 
            Mesa Grande Road - Existing View 
            Fig. D.3-37B. 
            Key Viewpoint 35 - Santa Ysabel Partial Underground Alternative - 
            Mesa Grande Road - Simulation 
            Fig. D.3-38A/B. Key 
            Viewpoint 36 - Mesa Grande Alternative - Mesa Grande Road - Existing 
            View and Simulation 
            Fig. D.3-38C. 
            Key Viewpoint 36 - Mesa Grande Alternative - Mesa Grande Road - Proposed 
            Project Visual Simulation Comparison 
            (3.5MB) 
            Fig. D.3-39. 
            Key Viewpoint 37 - Oak Hollow Underground Alternative - Oak Hollow 
            West Gate - Existing View (3.6MB) 
            Fig. D.3-40. 
            Key Viewpoint 38 - San Vicente Road Transition Alternative - San Vicente 
            Road - Existing View (3.8MB) 
            Fig. D.3-41. 
            Key Viewpoint 39 - Pomerado Road to Miramar Area North Alternative 
            - Rose Garden Court - Existing View 
            (3.2MB) 
            Fig. D.3-42. 
            Key Viewpoint 40 - Los Peñasquitos Canyon / Mercy Road Alternative 
            - Scripps Poway Parkway - Existing View 
            Fig. D.3-43A/B. Key 
            Viewpoint 41 - Top of the World Substation Alternative - Mataguay 
            Scout Ranch Flag Pole / Fire Ring Area - Existing View and Simulation 
            Fig. D.3-44. 
            Key Viewpoint 42 - Top of the World Substation Alternative - Mataguay 
            Scout Reservation Entrance - Existing View 
            Fig. D.3-45. 
            Key Viewpoint 43 - Top of the World Substation Alternative - Henshaw 
            Overlook - Existing View 
            Fig. D.3-46. 
            Top of the World Substation Rerouted per Mitigation Measures V-52a 
            and V-53a 
             Visual Resources Appendix: 
            - VR-1. 
            Summary of Key Viewpoint Analyses 
            - VR-2. 
            Scenic Quality Field Inventory  
            - VR-3. 
            Visual Resource Management Classification 
            - VR-4. 
            Visual Contrast Rating Data Sheet | 
        
 
          D.4 Land Use 
            D.4.1. Regional Setting and Approach to Data 
            Collection 
            D.4.2. Environmental Setting for the Proposed Project 
            D.4.3. Applicable Regulations, Plans, and Standards 
            D.4.4. Significance Criteria and Approach to Impact Assessment 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.4.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.4.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.4.7. Central Link Impacts and Mitigation Measures 
            D.4.8. Inland Valley Link Impacts and Mitigation Measures 
            D.4.9. Coastal Link Impacts and Mitigation Measures 
            D.4.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.4.11. Future Transmission System Expansion 
            D.4.12. Connected Actions and Indirect Effects 
            D.4.13. Overall Land Use Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.4.14. Imperial Valley Link Alternatives Impacts and Mitigation Measures 
            D.4.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.4.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.4.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.4.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.4.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.4.20. Mitigation Monitoring, Compliance, and Reporting Table 
            D.4.21. References 
            Land Use Appendix: 
            - Fig. 
            Ap.LU-1. Land Use: Imperial Valley Link 
            - Fig. Ap.LU-2. Land Use: 
            Imperial Valley Link 
            - Fig. Ap.LU-3. 
            Land Use: Imperial Valley Link 
            - Fig. Ap.LU-4. Land Use: 
            Imperial Valley Link 
            - Fig. Ap.LU-5. Land Use: 
            Imperial Valley Link 
            - Fig. Ap.LU-6. Land Use: 
            Imperial Valley Link 
            - Fig. Ap.LU-7. Land Use: 
            Anza-Borrego Link 
            - Fig. Ap.LU-8. Land Use: 
            Anza-Borrego Link 
            - Fig. Ap.LU-9. Land Use: 
            Anza-Borrego Link 
            - Fig. Ap.LU-10. Land 
            Use: Anza-Borrego Link 
            - Fig. Ap.LU-11. Land 
            Use: Central Link 
            - Fig. Ap.LU-12. Land 
            Use: Central Link 
            - Fig. Ap.LU-13. Land 
            Use: Central Link 
            - Fig. Ap.LU-14. Land 
            Use: Inland Valley Link 
            - Fig. Ap.LU-15. Land 
            Use: Inland Valley Link 
            - Fig. Ap.LU-16. Land 
            Use: Inland Valley Link 
            - Fig. Ap.LU-17. Land 
            Use: Coastal Link 
            - Fig. Ap.LU-18. Land 
            Use: Coastal Link 
            - Fig. Ap.LU-19. 
            Land Use: Coastal Link | 
        
 
          D.5 Wilderness 
            and Recreation 
            D.5.1. Regional Setting and Approach to Data Collection 
            D.5.2. Environmental Setting for the Proposed Project 
            D.5.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.5.4. Significance Criteria and Approach to Impact Assessment 
            D.5.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.5.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.5.7. Central Link Impacts and Mitigation Measures 
            D.5.8. Inland Valley Link Impacts and Mitigation Measures 
            D.5.9. Coastal Link Impacts and Mitigation Measures 
            D.5.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.5.11. Future Transmission System Expansion 
            D.5.12. Connected Actions and Indirect Effects 
            D.5.13. Overall Wilderness and Recreation Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.5.14. Imperial Valley Link Alternatives Impacts and Mitigation Measures 
            D.5.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.5.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.5.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.5.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.5.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.5.20. Mitigation Monitoring, Compliance, and Reporting Table 
            D.5.21. References 
            Table D.5-3. Mitigation Measure 
            WR 4b (Minimize project facilities in wilderness land): Modified ROW 
            and Pull Site Locations 
            Fig. 
            D.5-1. Wilderness and Recreation Areas: Imperial Valley Link 
            Fig. D.5-2. 
            Wilderness and Recreation Areas: Anza-Borrego Link 
            Fig. D.5-3. 
            Wilderness and Recreation Areas: Central Link 
            Fig. 
            D.5-4. San Felipe Hills Wilderness Study Area 
            Fig. 
            D.5-5. Wilderness and Recreation Areas: Inland Valley Link 
            Fig. D.5-6. 
            Wilderness and Recreation Areas: Coastal Link 
            Fig. 
            D.5-7. Wilderness and Recreation Areas: Sycamore Canyon-Eliot 
            Substation Reconductor 
            Fig. 
            D.5-8. Digital Terrain Model/Viewshed Analysis in ABDSP: Proposed 
            Project 
            Fig. 
            D.5-9a. Wilderness and Recreation Areas: Mitigation Measure WR-4b 
            Modified ROW 
            Fig. 
            D.5-9b. Wilderness and Recreation Areas: Mitigation Measure WR-4b 
            Modified ROW 
            Fig. 
            D.5-10. Digital Terrain Model/Viewshed Analysis in ABDSP: Partial 
            Underground 230 kV ABDSP SR78 to S2 
            Fig. 
            D.5-11. Digital Terrain Model/Viewshed Analysis in ABDSP: Overhead 
            500 kV ABDSP within Existing ROW Alternative 
            Fig. 
            D.5-12. Tamarisk Grove Campground | 
        
 
          D.6 Agriculture 
            D.6.1. Regional Setting and Approach to Data Collection 
            D.6.2. Environmental Setting for the Proposed Project 
            D.6.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.6.4. Significance Criteria and Approach to Impact Assessment 
            D.6.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.6.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.6.7. Central Link Impacts and Mitigation Measures 
            D.6.8. Inland Valley Link Impacts and Mitigation Measures 
            D.6.9. Coastal Link Impacts and Mitigation Measures 
            D.6.10. Other System Upgrades Impacts and Mitigation Measures 
            D.6.11. Future Transmission System Expansion 
            D.6.12. Connected Actions and Indirect Effects 
            D.6.13. Overall Agriculture Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.6.14. Imperial Valley Link Alternatives Impacts and Mitigation Measures 
            D.6.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.6.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.6.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.6.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.6.19. Top of the World Substation Alternative 
            D.6.20. Mitigation Monitoring, Compliance, and Reporting Table 
            D.6.21. References 
            Agriculture Appendix: 
            - Fig. 
            Ap.AG-1. Agricultural Resources: Imperial Valley Link 
            - Fig. Ap.AG-2. Agricultural 
            Resources: Imperial Valley Link 
            - Fig. Ap.AG-3. Agricultural 
            Resources: Imperial Valley Link 
            - Fig. Ap.AG-4. Agricultural 
            Resources: Imperial Valley Link 
            - Fig. Ap.AG-5. Agricultural 
            Resources: Imperial Valley Link 
            - Fig. Ap.AG-6. Agricultural 
            Resources: Imperial Valley Link 
            - Fig. Ap.AG-7. Agricultural 
            Resources: Anza-Borrego Link 
            - Fig. Ap.AG-8. Agricultural 
            Resources: Anza-Borrego Link 
            - Fig. Ap.AG-9. Agricultural 
            Resources: Anza-Borrego Link 
            - Fig. Ap.AG-10. Agricultural 
            Resources: Anza-Borrego Link 
            - Fig. Ap.AG-11. Agricultural 
            Resources: Central Link 
            - Fig. Ap.AG-12. Agricultural 
            Resources: Central Link 
            - Fig. Ap.AG-13. Agricultural 
            Resources: Central Link 
            - Fig. Ap.AG-14. Agricultural 
            Resources: Inland Valley Link 
            - Fig. Ap.AG-15. Agricultural 
            Resources: Inland Valley Link 
            - Fig. Ap.AG-16. Agricultural 
            Resources: Inland Valley Link 
            - Fig. Ap.AG-17. Agricultural 
            Resources: Coastal Link 
            - Fig. Ap.AG-18. Agricultural 
            Resources: Coastal Link 
            - Fig. Ap.AG-19. 
            Agricultural Resources: Coastal Link | 
        
 
          D.7 Cultural 
            and Paleontological Resources 
            Cultural Resources 
            D.7.1. Approach to Data Collection 
            Environmental Setting for the Proposed Project - Cultural Resources 
            D.7.2. Imperial Valley Link 
            D.7.3. Anza-Borrego Link 
            D.7.4. Central Link 
            D.7.5. Inland Valley Link 
            D.7.6. Coastal Link 
            D.7.7. Applicable Regulations, Plans, and Standards 
            D.7.8. Significance Criteria and Approach to Impact Assessment 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project - Cultural Resources 
            D.7.9. Imperial Valley Link Impacts and Mitigation Measures 
            D.7.10. Anza-Borrego Link Impacts and Mitigation Measures 
            D.7.11. Central Link Impacts and Mitigation Measures 
            D.7.12. Inland Valley Link Impacts and Mitigation Measures 
            D.7.13. Coastal Link Impacts and Mitigation Measures 
            D.7.14. Other System Upgrades - Impacts and Mitigation Measures 
            D.7.15. Future Transmission System Expansion - Cultural Resources 
            D.7.16. Connected Actions and Indirect Effects - Cultural Resources 
            D.7.17. Overall Impacts of Proposed Project - Cultural Resources 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route - Cultural Resources 
            D.7.18. Imperial Valley Link Alternatives Impacts and Mitigation Measures 
            D.7.19. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.7.20. Central Link Alternatives Impacts and Mitigation Measures 
            D.7.21. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.7.22. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.7.23. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            Paleontological Resources - Proposed Route and Northern Alternatives 
            D.7.24. Regional Setting and Approach to Data Collection 
            D.7.25. Environmental Setting for the Proposed Project 
            D.7.26. Applicable Regulations, Plans, and Standards 
            D.7.27. Significance Criteria and Approach to Impact Assessment 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project - Paleontological Resources 
            D.7.28. Imperial Valley Link Impacts and Mitigation Measures 
            D.7.29. Anza-Borrego Link Impacts and Mitigation Measures 
            D.7.30. Central Link Impacts and Mitigation Measures 
            D.7.31. Inland Valley Link Impacts and Mitigation Measures 
            D.7.32. Coastal Link Impacts and Mitigation Measures 
            D.7.33. Other System Upgrades - Impacts and Mitigation Measures 
            D.7.34. Future Transmission System Expansion - Paleontological Resources 
            D.7.35. Connected Actions and Indirect Effects - Paleontology 
            D.7.36. Overall Paleontology Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route - Paleontological Resources 
            D.7.37. Imperial Valley Link Alternatives Impacts and Mitigation Measures 
            D.7.38. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.7.39. Central Link Alternatives Impacts and Mitigation Measures 
            D.7.40. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.7.41. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.7.42. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.7.43. Mitigation Monitoring, Compliance, and Reporting Table - Cultural 
            and Paleontological Resources 
            D.7.44. References for Cultural Resources 
            D.7.45. References for Paleontological Resources | 
        
 
          D.8 Noise 
            D.8.1. Regional Setting and Approach to Data Collection 
            D.8.2. Environmental Setting for the Proposed Project 
            D.8.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.8.4. Significance Criteria and Approach to Impact Assessment 
            D.8.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.8.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.8.7. Central Link Impacts and Mitigation Measures 
            D.8.8. Inland Valley Link Impacts and Mitigation Measures 
            D.8.9. Coastal Link Impacts and Mitigation Measures 
            D.8.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.8.11. Future Transmission System Expansion 
            D.8.12. Connected Actions and Indirect Effects 
            D.8.13. Overall Noise Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.8.14. Imperial Valley Link Alternatives Impacts and Mitigation Measures 
            D.8.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.8.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.8.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.8.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.8.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.8.20. Mitigation Monitoring, Compliance, and Reporting Table 
            D.8.21. References 
            Fig. D.8-1. Typical Range of Common Sounds Heard in the Environment* 
            Fig. D.8-2. Noise Levels for Various Land Use Types* | 
        
 
          D.9 Transportation 
            and Traffic 
            D.9.1. Regional Setting and Approach to Data Collection 
            D.9.2. Environmental Setting for the Proposed Project 
            D.9.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.9.4. Significance Criteria and Approach to Impact Assessment 
            D.9.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.9.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.9.7. Central Link Impacts and Mitigation Measures 
            D.9.8. Inland Valley Link Impacts and Mitigation Measures 
            D.9.9. Coastal Link Impacts and Mitigation Measures 
            D.9.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.9.11. Future Transmission System Expansion 
            D.9.12. Connected Actions and Indirect Effects 
            D.9.13. Overall Transportation and Traffic Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.9.14. Imperial Valley Link Alternatives Impacts and Mitigation Measures 
            D.9.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.9.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.9.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.9.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.9.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.9.20. Mitigation Monitoring, Compliance, and Reporting Table 
            D.9.21. References | 
        
 
          D.10 Public Health 
            and Safety 
            Environmental Contamination 
            D.10.1. Regional Setting and Approach to Data Collection 
            D.10.2. Environmental Setting for the Proposed Project - Environmental 
            Contamination 
            D.10.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project - Environmental Contamination 
            D.10.4. Significance Criteria and Approach to Impact Assessment 
            D.10.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.10.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.10.7. Central Link Impacts and Mitigation Measures 
            D.10.8. Inland Valley Link Impacts and Mitigation Measures 
            D.10.9. Coastal Link Impacts and Mitigation Measures 
            D.10.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.10.11. Future Transmission System Expansion 
            D.10.12. Connected Actions and Indirect Effects 
            D.10.13. Overall Public Health and Safety Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route - Environmental Contamination 
            D.10.14. Imperial Valley Link Alternatives Impacts and Mitigation 
            Measures 
            D.10.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.10.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.10.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.10.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.10.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            Electric and Magnetic Fields and Other Field Related Concerns 
            D.10.20. EMF in the Proposed Project Area 
            D.10.21. Scientific Background and Regulations Applicable to EMF 
            D.10.22. Consideration of Electric and Magnetic Fields 
            D.10.23. Other Field-Related Public Concerns 
            D.10.24. Significance Criteria and Approach to Impact Assessment - 
            Safety and Non Magnetic Field Electric Power Field Issues 
            D.10.25. Environmental Impacts and Mitigation Measures for the Proposed 
            Project and Alternatives - Safety and Non EMF Electric Power Field 
            Issues 
            D.10.26. Future Transmission System Expansion - EMF 
            D.10.27. Connected Actions and Indirect Effects - EMF 
            D.10.28. Overall Impacts of the Proposed Project - EMF and Field Related 
            Concerns 
            D.10.29. Mitigation Monitoring, Compliance, and Reporting Table 
            D.10.30. References for Contamination 
            D.10.31. References for EMF | 
        
 
          D.11 Air Quality 
            D.11.1. Regional Setting and Approach to Data 
            Collection 
            D.11.2. Environmental Setting for the Proposed Project 
            D.11.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.11.4. Significance Criteria and Approach to Impact Assessment 
            D.11.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.11.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.11.7. Central Link Impacts and Mitigation Measures 
            D.11.8. Inland Valley Link Impacts and Mitigation Measures 
            D.11.9. Coastal Link Impacts and Mitigation Measures 
            D.11.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.11.11. Future Transmission System Expansion 
            D.11.12. Connected Actions and Indirect Effects 
            D.11.13. Overall Air Quality Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.11.14. Imperial Valley Link Alternatives Impacts and Mitigation 
            Measures 
            D.11.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.11.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.11.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.11.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.11.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.11.20. Mitigation Monitoring, Compliance, and Reporting Table 
            D.11.21. References 
            Fig. 
            D.11-1. Air Quality Management Districts and Class I Areas | 
        
 
          D.12 Water Resources 
            D.12.1. Regional Setting and Approach to Data Collection 
            D.12.2. Environmental Setting for the Proposed Project 
            D.12.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.12.4. Significance Criteria and Approach to Impact Assessment 
            D.12.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.12.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.12.7. Central Link Impacts and Mitigation Measures 
            D.12.8. Inland Valley Link Impacts and Mitigation Measures 
            D.12.9. Coastal Link Impacts and Mitigation Measures 
            D.12.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.12.11. Future Transmission System Expansion 
            D.12.12. Connected Actions and Indirect Effects 
            D.12.13. Overall Water Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.12.14. Imperial Valley Link Alternatives Impacts and Mitigation 
            Measures 
            D.12.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.12.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.12.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.12.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.12.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.12.20. Mitigation Monitoring, Compliance, and Reporting Table 
            D.12.21. References 
             Fig. D.12.1. San Felipe Creek near the Narrows Substation, Anza-Borrego 
            Link* 
            Fig. D.12-2. View Across Santa Ysabel River, Inland Valley Link* 
            Fig. D.12-3. Average Monthly Rainfall* 
            Fig. D.12-4. Anza-Borrego Link Rainfall/Runoff* 
            Fig. D.12-5. Inland Valley Link Rainfall/Runoff* 
            Fig. D.12-6. Summer Runoff for Santa Ysabel Creek* | 
        
 
          D.13 Geology, Mineral 
            Resources, and Soils 
            D.13.1. Regional Setting and Approach to Data Collection 
            D.13.2. Environmental Setting for the Proposed Project 
            D.13.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.13.4. Significance Criteria and Approach to Impact Assessment 
            D.13.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.13.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.13.7. Central Link Impacts and Mitigation Measures 
            D.13.8. Inland Valley Link Impacts and Mitigation Measures 
            D.13.9. Coastal Link Impacts and Mitigation Measures 
            D.13.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.13.11. Future Transmission System Expansion 
            D.13.12. Connected Actions and Indirect Effects 
            D.13.13. Overall Geology Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.13.14. Imperial Valley Link Alternatives Impacts and Mitigation 
            Measures 
            D.13.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.13.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.13.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.13.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.13.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.13.20. Mitigation Monitoring, Compliance, and Reporting Table 
            D.13.21. References 
            Fig. D.13-1. Geologic Time Scale* 
            Fig. 
            D.13-2. Regional Active Faults and Historic Earthquakes 
            Fig. 
            D.13-3. Estimated Peak Ground Accelerations 
            Fig. 
            D.13-4. Superstition Hills Fault Crossing 
            Fig. D.13-5. 
            Elmore Ranch Fault Crossing 
            Fig. D.13-6. 
            San Jacinto Fault Crossing 
            Fig. D.13-7. 
            Elsinore Fault Zone Crossing 
            Fig. 
            D.13-8. Fault Location Map for Central East Substation 
            Fig. 
            D.13-9. Earthquake Valley Fault Zone Crossing 
            Fig. 
            D.13-10. Santa Ysabel Alternatives Elsinore Fault Crossing | 
        
          D.14 Socioeconomics, 
            Services, and Utilities 
            D.14.1. Regional Setting and Approach to Data Collection 
            D.14.2. Environmental Setting for the Proposed Project 
            D.14.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.14.4. Significance Criteria and Approach to Impact Assessment 
            D.14.5. Imperial Valley Link Impacts and Mitigation Measures 
            D.14.6. Anza-Borrego Link Impacts and Mitigation Measures 
            D.14.7. Central Link Impacts and Mitigation Measures 
            D.14.8. Inland Valley Link Impacts and Mitigation Measures 
            D.14.9. Coastal Link Impacts and Mitigation Measures 
            D.14.10. Other System Upgrades - Impacts and Mitigation Measures 
            D.14.11. Future Transmission System Expansion 
            D.14.12. Connected Actions and Indirect Effects 
            D.14.13. Overall Socioeconomic Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.14.14. Imperial Valley Link Alternatives Impacts and Mitigation 
            Measures 
            D.14.15. Anza-Borrego Link Alternatives Impacts and Mitigation Measures 
            D.14.16. Central Link Alternatives Impacts and Mitigation Measures 
            D.14.17. Inland Valley Link Alternatives Impacts and Mitigation Measures 
            D.14.18. Coastal Link Alternatives Impacts and Mitigation Measures 
            D.14.19. Top of the World Substation Alternative Impacts and Mitigation 
            Measures 
            D.14.20. Mitigation Monitoring, Compliance, and Reporting Table 
            D.14.21. References | 
        
 
          D.15 Fire and Fuels 
            Management 
            D.15.1. Introduction 
            D.15.2. Environmental Setting 
            D.15.3. Applicable Regulations, Plans, and Standards 
            Environmental Impacts and Mitigation Measures for the Proposed 
            Project 
            D.15.4. Significance Criteria and Approach to Impact Assessment 
            D.15.5. Imperial Valley Link and Eastern Anza-Borrego Link 
            D.15.6. PFS 1 Ranchita Fireshed 
            D.15.7. PFS 2 San Felipe Fireshed 
            D.15.8. PFS 3 Santa Ysabel Fireshed 
            D.15.9. PFS 4 Ramona Fireshed 
            D.15.10. PFS 5 Poway Fireshed 
            D.15.11. PFS 6 Peñasquitos Fireshed 
            D.15.12. Other System Upgrades - Impacts and Mitigation Measures 
            D.15.13. Future Transmission System Expansion 
            D.15.14. Connected Actions and Indirect Effects 
            D.15.15. Overall Fire and Fuels Management Impacts of Proposed Project 
            Environmental Impacts and Mitigation Measures for Alternatives 
            Along Proposed Project Route 
            D.15.16. Imperial Valley Link Alternatives 
            D.15.17. Anza-Borrego Link Alternatives 
            D.15.18. Central Link Alternatives 
            D.15.19. Inland Valley Link Alternatives 
            D.15.20. Coastal Link Alternatives 
            D.15.21. Top of the World Substation Alternative 
            D.15.22. Mitigation Monitoring, Compliance, and Reporting Table 
            D.15.23. References 
            Fig. 
            D.15-1. Regional Fire Hazard Severity Zones 
            Fig. 
            D.15-2. 2003 and 2007 San Diego County Fires 
            Fig. 
            D.15-3. Sunrise Powerlink Proposed Project and Alternative Firesheds 
            Fig. D.15-4. Proposed Project Fireshed Wildfire History* 
            Fig. D.15-5. 
            PFS-1 Ranchita Fireshed Boundary and Proposed Project and Alternative 
            Project Routes 
            Fig. D.15-6. Ranchita Fireshed Wildfire History* 
            Fig. D.15-7. 
            PFS-2 San Felipe Fireshed Boundary and Proposed Project and Alternative 
            Project Routes 
            Fig. D.15-8. San Felipe Fireshed Wildfire History* 
            Fig. 
            D.15-9. PFS-3 Santa Ysabel Fireshed Boundary and Proposed Project 
            and Alternative Project Routes 
            Fig. D.15-10. Santa Ysabel Fireshed Wildfire History* 
            Fig. D.15-11. 
            PFS-4 Ramona Fireshed Boundary and Proposed Project and Alternative 
            Project Routes 
            Fig. D.15-12. Ramona Fireshed Wildfire History* 
            Fig. D.15-13. 
            PFS-5 Poway Fireshed Boundary and Proposed Project and Alternative 
            Project Routes 
            Fig. D.15-14. Poway Fireshed Wildfire History* 
            Fig. 
            D.15-15. PFS-6 Peñasquitos Fireshed Boundary and Proposed 
            Project and Alternative Project Routes 
            Fig. D.15-16. Peñasquitos Fireshed Wildfire History* 
            Fig. D.15-17. CCR Title 14 Section 1254 Minimum Clearances* 
            Fig. 
            D.15-18. PFS-1 Ranchita Fireshed Burn Probability Model 
            Fig. 
            D.15-19. PFS-1 Ranchita Fireshed Fire Behavior Trend Model 
            Fig. 
            D.15-20. PFS-1 Ranchita Fireshed Containment Conflict Model 
            Fig. 
            D.15-21. PFS-2 San Felipe Fireshed Burn Probability Model 
            Fig. 
            D.15-22. PFS-2 San Felipe Fireshed Fire Behavior Trend Model 
            Fig. 
            D.15-23. PFS-2 San Felipe Fireshed Wildfire Containment Conflict 
            Model 
            Fig. 
            D.15-24. PFS-3 Santa Ysabel Fireshed Burn Probability Model 
            Fig. 
            D.15-25. PFS-3 Santa Ysabel Fireshed Fire Behavior Trend Model 
            Fig. 
            D.15-26. PFS-3 Santa Ysabel Fireshed Wildfire Containment Conflict 
            Model 
            Fig. 
            D.15-27. PFS-4 Ramona Fireshed Burn Probability Model 
            Fig. 
            D.15-28. PFS-4 Ramona Fireshed Fire Behavior Trend Model 
            Fig. 
            D.15-29. PFS-4 Ramona Fireshed Wildfire Containment Conflict Model 
            Fig. 
            D.15-30. PFS-5 Poway Fireshed Burn Probability Model 
            Fig. 
            D.15-31. PFS-5 Poway Fireshed Fire Behavior Trend Model 
            Fig. 
            D.15-32. PFS-5 Poway Fireshed Wildfire Containment Conflict Model 
            Fig. 
            D.15-33. PFS-6 Peñasquitos Fireshed Burn Probability Model 
            Fig. 
            D.15-34. PFS-6 Peñasquitos Fireshed Fire Behavior Trend 
            Model 
            Fig. 
            D.15-35. PFS-6 Peñasquitos Fireshed Wildfire Containment 
            Conflict Model 
            Fig. 
            D.15-36. Ranchita Partial Underground ABDSP SR78 to S2 Alternative 
            Burn Probability Model 
            Fig. 
            D.15-37. Ranchita Partial Underground ABDSP SR78 to S2 Alternative 
            Overhead Portion Fire Behavior Trend Model 
            Fig. 
            D.15-38. Ranchita Partial Underground ABDSP SR78 to S2 Alternative 
            Wildfire Containment Conflict Model 
            Fig. 
            D.15-39. Santa Ysabel Existing ROW Alternative Burn Probability 
            Model 
            Fig. 
            D.15-40. Santa Ysabel Existing ROW Alternative Fire Behavior Trend 
            Model 
            Fig. 
            D.15-41. Santa Ysabel Existing ROW Alternative Wildfire Containment 
            Conflict Model 
            Fig. 
            D.15-42. Mesa Grande Alternative Fire Behavior Trend Model 
            Fig. 
            D.15-43. Chuck Wagon Road Alternative Burn Probability Model 
            Fig. 
            D.15-44. Chuck Wagon Road Alternative Fire Behavior Trend Model 
            Fig. 
            D.15-45. Chuck Wagon Road Alternative Wildfire Containment Conflict 
            Model 
            Fig. 
            D.15-46. Pomerado Road to Miramar Area North Alternative Burn 
            Probability Model 
            Fig. 
            D.15-47. Pomerado Road to Miramar Area North Alternative Fire 
            Behavior Trend Model 
            Fig. 
            D.15-48. Pomerado Road to Miramar Area North Alternative Wildfire 
            Containment Conflict Model 
            Fig. 
            D.15-49. Los Peñasquitos Canyon Preserve-Mercy Road Alternative 
            Burn Probability Model 
            Fig. 
            D.15-50. Top of the World Substation Alternative Burn Probability 
            Model 
            Fig. 
            D.15-51. Top of the World Substation Alternative Fire Behavior 
            Trend Model 
            Fig. 
            D.15-52. Top of the World Substation Alternative Wildfire Containment 
            Conflict Model | 
        
 
          D.16 
            Policy Consistency 
            D.16.1. Introduction 
            D.16.2. CEQA/NEPA Requirements 
            D.16.3. Proposed Project and Alternatives Consistency Review 
            D.16.4. Consistency Determinations | 
        
 
          D.17 Plan 
            Amendments 
            D.17.1. Federal and State Plan Descriptions 
            D.17.2. Plan Amendments Resulting from Proposed Project and Alternatives 
            Fig. 
            D.17-1. BLM Planning Areas and Utility Corridors 
            Fig. D.17-2. 
            Cleveland National Forest Land Use Zones (4.3MB) 
            Fig. D.17-3. 
            Cleveland National Forest Scenic Integrity Objectives (4.2MB) | 
        
 
          |  
             E.1 Interstate 8 Alternative 
              E.1.1. 
              Description of the Interstate 8 Alternative 
              Fig. 
              E.1.1-1. SWPL Alternatives 
              Fig. 
              E.1.1-2a. Interstate 8 Alternative Detail (MPs I8-0 to 23) (4.4MB) 
              Fig. 
              E.1.1-2b. Interstate 8 Alternative Detail (MPs I8-23 to 48) 
              (5.6MB) 
              Fig. 
              E.1.1-2c. Interstate 8 Alternative Detail (MPs I8-48 to 72) 
              Fig. 
              E.1.1-2d. Interstate 8 Alternative Detail (MPs I8-72 to 92.7) 
              (5.7MB) 
              Fig. E.1.1-3. 
              Interstate 8 Alternative Substation Detail 
              Fig. 
              E.1.1-4a. Interstate 8 Alternative: Campo North Route Option 
              Fig. 
              E.1.1-4b. Interstate 8 Alternative: Buckman Springs Options 
              Fig. 
              E.1.1-4c. Interstate 8 Alternative: South Buckman Springs Option 
              Fig. 
              E.1.1-4d. Interstate 8 Alternative: Chocolate Canyon Option 
              (6.0MB) 
              Fig. 
              E.1.1-4e. Interstate 8 Alternative: SWPL Archaeological Site 
              Reroute 
              Fig. 
              E.1.1-5. Interstate 8 Alternative: Cleveland National Forest 
              Land Use Zones 
              Fig. 
              E.1.1-6. SWPL Alternatives 500 kV Future Expansion 
              E.1.2. 
              Biological Resources 
              Fig. 
              E.1.2-1. Biological Resources Overview: Southwest Powerlink 
              Alternatives 
              E.1.3. 
              Visual Resources 
              Fig. 
              E.1.3-1. Visual Resources SWPL Alternatives 
              Fig. E.1.3-2A/B. 
              Key Viewpoint 44 - I-8 Alternative - Dunaway Staging Area - Existing 
              View and Simulation 
              Fig. E.1.3-3A/B. 
              Key Viewpoint 45 - I-8 Alternative - Yuha Desert I-8 Span - Existing 
              View and Simulation 
              Fig. E.1.3-4A. 
              Key Viewpoint 46 - I-8 Alternative - Plaster City West Staging Area 
              - Existing View 
              Fig. E.1.3-4B. 
              Key Viewpoint 46 - I-8 Alternative - Plaster City West Staging Area 
              - Visual Simulation 
              Fig. E.1.3-5A. 
              Key Viewpoint 47 - I-8 Alternative - Sugarloaf Mountain / I-8 - 
              Existing View 
              Fig. E.1.3-5B. 
              Key Viewpoint 47 - I-8 Alternative - Sugarloaf Mountain / I-8 - 
              Visual Simulation 
              Fig. E.1.3-6A/B. 
              Key Viewpoint 48 - I-8 Alternative - South of Table Mountain - Existing 
              View and Simulation 
              Fig. E.1.3-7A. 
              Key Viewpoint 49 - I-8 Alternative - Jacumba - Existing View 
              Fig. E.1.3-7B. 
              Key Viewpoint 49 - I-8 Alternative - Jacumba - Visual Simulation 
              Fig. E.1.3-8A. 
              Key Viewpoint 50 - I-8 Alternative - La Posta - Existing View 
              Fig. E.1.3-8B. 
              Key Viewpoint 50 - I-8 Alternative - La Posta - Visual Simulation 
              Fig. E.1.3-9A. 
              Key Viewpoint 51 - I-8 Alternative - Cottonwood Valley - Existing 
              View 
              Fig. E.1.3-9B. 
              Key Viewpoint 51 - I-8 Alternative - Cottonwood Valley - Visual 
              Simulation 
              Fig. E.1.3-10A. 
              Key Viewpoint 52 - I-8 Alternative - Interstate 8 Span - Existing 
              View 
              Fig. E.1.3-10B. 
              Key Viewpoint 52 - I-8 Alternative - Interstate 8 Span - Visual 
              Simulation 
              Fig. E.1.3-11A. 
              Key Viewpoint 53 - I-8 Alternative - Alpine Road Transition Structure 
              - Existing View 
              Fig. E.1.3-11B. 
              Key Viewpoint 53 - I-8 Alternative - Alpine Road Transition Structure 
              - Visual Simulation 
              Fig. 
              E.1.3-11C. Reroute per Mitigation Measure V-66a (10.8MB) 
              Fig. E.1.3-12A. 
              Key Viewpoint 54 - I-8 Alternative - El Monte County Park - Existing 
              View (3.9MB) 
              Fig. E.1.3-12B. 
              Key Viewpoint 54 - I-8 Alternative - El Monte County Park - Visual 
              Simulation (3.9MB) 
              Fig. E.1.3-13A. 
              Key Viewpoint 55 - I-8 Alternative - Moreno Boulevard - Existing 
              View 
              Fig. E.1.3-13B. 
              Key Viewpoint 55 - I-8 Alternative - Moreno Boulevard - Visual Simulation 
              Fig. E.1.3-14A. 
              Buckman Springs Road - West Buckman Springs Alt. Existing View 
              Fig. E.1.3-14B. 
              Buckman Springs Road - West Buckman Springs Alt. Simulation 
              Fig. 
              E.1.3-14C. Buckman Springs Alternative Reroute per Mitigation 
              Measure V-69a 
              Fig. E.1.3-15A. 
              Key Viewpoint 57 - Buckman Springs Underground Option - Buckman 
              Springs Road Northbound I-8 On-Ramp - Existing View 
              Fig. E.1.3-15B. 
              Key Viewpoint 57 - Buckman Springs Underground Option - Buckman 
              Springs Road Northbound I-8 On-Ramp - Simulation 
              Fig. E.1.3-16A/B. 
              Key Viewpoint 58 - Campo North Option - Eastbound I-8 - Existing 
              View and Simulation 
              Fig. E.1.3-17A. 
              Key Viewpoint 59 - South Buckman Springs Option - Cameron Truck 
              Trail - Existing View 
              Fig. E.1.3-17B. 
              Key Viewpoint 59 - South Buckman Springs Option - Cameron Truck 
              Trail - Visual Simulation 
              Fig. 
              E.1.3-17C. South Buckman Springs Option Mitigation Reroute Map 
              Visual Resources Appendix: 
              - VR-1: 
              Summary of Key Viewpoint Analyses 
              - VR-4: 
              Visual Contrast Rating Data Sheet 
              E.1.4. 
              Land Use 
              Land Use Appendix: 
              - Fig. Ap.LU.E.1-1. 
              Interstate 8 Alternative 
              - Fig. Ap.LU.E.1-2. 
              Interstate 8 Alternative 
              - Fig. Ap.LU.E.1-3. 
              Interstate 8 Alternative 
              - Fig. Ap.LU.E.1-4. 
              Interstate 8 Alternative 
              - Fig. Ap.LU.E.1-5. 
              Interstate 8 Alternative 
              - Fig. Ap.LU.E.1-6. 
              Interstate 8 Alternative 
              - Fig. Ap.LU.E.1-7. 
              Interstate 8 Alternative 
              - Fig. Ap.LU E.1-8. 
              Interstate 8 Alternative 
              - Fig. Ap.LU.E.1-9. 
              Interstate 8 Alternative 
              - Fig. Ap.LU.E.1-10. 
              Interstate 8 Alternative 
              - Fig. Ap.LU.E.1-11. 
              Interstate 8 Alternative 
              E.1.5. 
              Wilderness and Recreation 
              Fig. 
              E.1.5-1. Wilderness and Recreation Areas: Southwest Powerlink 
              Alternatives 
              E.1.6. Agriculture 
              Agriculture Appendix: 
              - Fig. 
              E.1.6-1. Interstate 8 Alternative 
              - Fig. E.1.6-2. Interstate 
              8 Alternative 
              - Fig. E.1.6-3. Interstate 
              8 Alternative 
              - Fig. E.1.6-4. Interstate 
              8 Alternative 
              - Fig. E.1.6-5. Interstate 
              8 Alternative 
              - Fig. E.1.6-6. Interstate 
              8 Alternative 
              - Fig. E.1.6-7. Interstate 
              8 Alternative 
              - Fig. E.1.6-8. Interstate 
              8 Alternative 
              - Fig. E.1.6-9. Interstate 
              8 Alternative 
              - Fig. E.1.6-10. Interstate 
              8 Alternative 
              - Fig. E.1.6-11. Interstate 
              8 Alternative 
              E.1.7. 
              Cultural and Paleontological Resources 
              E.1.8. Noise 
              E.1.9. Transportation and 
              Traffic 
              E.1.10. Public Health and Safety 
              - Environmental Contamination 
              E.1.11. Air Quality 
              E.1.12. Water Resources 
              E.1.13. Geology, Mineral Resources, 
              and Soils 
              Fig. E.1.13-1A. SWPL Tower in Mine Area* 
              Fig. E.1.13-1. 
              Yuha Wells Fault Crossing and Elsinore Fault Zone Vicinity 
              E.1.14. Socioeconomics 
              E.1.15. Fire and 
              Fuels Management 
              Fig. 
              E.1.15-1. Interstate Alternative Overview Map (4.3MB) 
              Fig. E.1.15-2. Reported 13-Year Wildfire Ignition History in Boulevard 
              Fireshed* 
              Fig. E.1.15-3. Boulevard Fireshed 50-year Wildfire History* 
              Fig. E.1.15-4. Reported 13-Year Wildfire Ignition History in Alternative 
              Route La Posta Fireshed* 
              Fig. E.1.15-5. La Posta Fireshed 50-year Wildfire History* 
              Fig. E.1.15-6. Reported 13-Year Wildfire Ignition History in Alternative 
              Route Guatay Fireshed* 
              Fig. E.1.15-7. Guatay Fireshed 50-year Wildfire History* 
              Fig. E.1.15-8. Reported 13-Year Wildfire Ignition History in Alternative 
              Route Boulder Creek Fireshed* 
              Fig. E.1.15-9. Boulder Creek Fireshed 50-year Wildfire History* 
              Fig. E.1.15-10. Reported 13-Year Wildfire Ignition History in Alternative 
              Route El Capitan Fireshed* 
              Fig. E.1.15-11. El Capitan Fireshed 50-year Wildfire History* 
              Fig. 
              E.1.15-12. Boulevard Fireshed Interstate 8 Alternative Burn 
              Probability Model 
              Fig. 
              E.1.15-13. La Posta Fireshed Interstate 8 Alternative Burn Probability 
              Model 
              Fig. 
              E.1.15-14. Guatay Fireshed Interstate 8 Alternative Burn Probability 
              Model 
              Fig. 
              E.1.15-15. El Capitan Fireshed Interstate 8 Alternative Burn 
              Probability Model 
              Fig. 
              E.1.15-16. Boulevard Fireshed Interstate 8 Alternative Fire 
              Behavior Trend Model 
              Fig. 
              E.1.15-17. La Posta Fireshed Interstate 8 Alternative Fire Behavior 
              Trend Model 
              Fig. 
              E.1.15-18. Guatay Fireshed Interstate 8 Alternative Fire Behavior 
              Trend Model 
              Fig. 
              E.1.15-19. El Capitan Fireshed Interstate 8 Alternative Fire 
              Behavior Trend Model 
              Fig. 
              E.1.15-20. Boulevard Fireshed Interstate 8 Alternative Wildfire 
              Containment Conflict Model 
              Fig. 
              E.1.15-21. La Posta Fireshed Interstate 8 Alternative Wildfire 
              Containment Conflict Model 
              Fig. 
              E.1.15-22. Guatay Fireshed Interstate 8 Alternative Wildfire 
              Containment Conflict Model 
              Fig. 
              E.1.15-23. El Capitan Fireshed Interstate 8 Alternative Wildfire 
              Containment Conflict Model 
              Fig. 
              E.1.15-24. La Posta Fireshed Buckman Springs Underground Option 
              Burn Probability Model 
              Fig. 
              E.1.15-25. La Posta Fireshed West Buckman Springs Option Burn 
              Probability Model 
              Fig. 
              E.1.15-26. La Posta Fireshed West Buckman Springs Option Fire 
              Behavior Trend Model 
              Fig. 
              E.1.15-27. La Posta Fireshed West Buckman Springs Option Wildfire 
              Containment Conflict Model 
           | 
        
 
          E.2 BCD Alternative 
            E.2.1. Description 
            of the BCD Alternative 
            Fig. E.2.1-1a. 
            BCD Alternative (MPs BCD-0 to 9) 
            Fig. E.2.1-1b. 
            BCD Alternative (MPs BCD-10 to 20.6) 
            Fig. E.2.1-2. 
            BCD South Option Alternative 
            Fig. E.2.1-3. 
            BCD Alternative: Cleveland National Forest Land Use Zones 
            E.2.2. Biological Resources 
            Fig. 
            E.2.2-1. Riparian Conservation Areas: BCD South Option Revision 
            E.2.3. Visual Resources 
            Fig. E.2.3-1A. 
            Key Viewpoint 60 - BCD Alternative - McCain Valley Road - Existing 
            View 
            Fig. E.2.3-1B. 
            Key Viewpoint 60 - BCD Alternative - McCain Valley Road - Visual Simulation 
            Fig. E.2.3-2A/B. Key 
            Viewpoint 61 - BCD Alternative - Carrizo Overlook - Existing View 
            and Simulation 
            Fig. E.2.3-3A/B. Key 
            Viewpoint 62 - BCD Alternative - McCain Valley North - Existing View 
            and Simulation 
            Fig. E.2.3-4A. 
            Key Viewpoint 63 - BCD Alternative - Pacific Crest Trail - Existing 
            View (3.5MB) 
            Fig. E.2.3-4B. 
            Key Viewpoint 63 - BCD Alternative - Pacific Crest Trail - Visual 
            Simulation (3.5MB) 
            Fig. E.2.3-5A. 
            Key Viewpoint 79 - BCD South Option - La Posta Truck Trail - Existing 
            View 
            Fig. E.2.3-5B. 
            Key Viewpoint 79 - BCD South Option - La Posta Truck Trail - Simulation 
             
            Visual Resources 
            Appendix: 
            - 
            VR-1: 
            Summary of Key Viewpoint Analyses 
            - VR-4: 
            Visual Contrast Rating Data Sheet 
            E.2.4. 
            Land Use 
            Land Use Appendix: 
            - Fig. 
            Ap.LU.E.2.4-1. BCD Alternative: Land Use 
            - Fig. 
            Ap.LU.E.2.4-2. BCD 
            Alternative: Land Use 
            - Fig. 
            Ap.LU.E.2.4-3. BCD 
            Alternative: Land Use 
             
            E.2.5. 
            Wilderness and Recreation 
            E.2.6. Agriculture 
            Agriculture Appendix: 
            - Fig. 
            Ap.AG.E.2.6-1. BCD 
            Alternative: Agricultural 
            Resources 
            - Fig. Ap.AG.E.2.6.2. 
            BCD 
            Alternative: Agricultural 
            Resources 
            - 
            Fig. Ap.AG.E.2.6.3. 
            BCD 
            Alternative: Agricultural 
            Resources 
             E.2.7. 
            Cultural and Paleontological Resources 
            E.2.8. Noise 
            E.2.9. Transportation and Traffic 
            Fig. 
            E.2.9-1. Mitigation Measure T-10, Mitigation Reroute for BCD South 
            Option 
            E.2.10. 
            Public Health and Safety - Contamination 
            E.2.11. Air Quality 
            E.2.12. Water Resources 
            E.2.13. Geology, Mineral Resources, 
            and Soils 
            E.2.14. Socioeconomics 
            E.2.15. Fire and 
            Fuels Management 
            Fig. 
            E.2.15-1. BCD Alternative Overview Map 
            Fig. 
            E.2.15-2. Boulevard Fireshed BCD Alternative Burn Probability 
            Model 
            Fig. 
            E.2.15-3. La Posta Fireshed BCD Alternative Burn Probability Model 
            Fig. 
            E.2.15-4. Boulevard Fireshed BCD Alternative Fire Behavior Trend 
            Model 
            Fig. 
            E.2.15-5. La Posta Fireshed BCD Alternative Fire Behavior Trend 
            Model 
            Fig. 
            E.2.15-6. Boulevard Fireshed BCD Alternative Wildfire Containment 
            Conflict Model 
            Fig. 
            E.2.15-7. La Posta Fireshed BCD Alternative Wildfire Containment 
            Conflict Model 
            Fig. 
            E.2.15-7a. La Posta Fireshed BCD Alternative and BCD South Revisions 
            Wildfire Containment Conflict Model 
            Fig. 
            E.2.15-8. La Posta Fireshed BCD South Option Burn Probability 
            Model 
            Fig. 
            E.2.15-9. La Posta Fireshed BCD South Option Fire Behavior Trend 
            Model 
            Fig. 
            E.2.15-10. La Posta Fireshed BCD South Option Wildfire Containment 
            Conflict Model | 
        
 
          E.3 Route D Alternative 
            E.3.1. Description 
            of the Route D Alternative 
            Fig. 
            E.3.1-1a. Route D Alternative (MPs D-0 to D-8) 
            Fig. 
            E.3.1-1b. Route D Alternative (MPs D-8 to D-17.3) 
            Fig. 
            E.3.1-2. Central South Substation Alternative 
            Fig. E.3.1-3. 
            Route D Alternative: Cleveland National Forest Land Use Zones 
            E.3.2. 
            Biological Resources 
            E.3.3. Visual Resources 
            Fig. E.3.3-1A. 
            Key Viewpoint 64 - Route D Alternative - Boulder Creek Road - Existing 
            View 
            Fig. E.3.3-1B. 
            Key Viewpoint 64 - Route D Alternative - Boulder Creek Road - Visual 
            Simulation 
            Fig. E.3.3-2A. 
            Key Viewpoint 65 - Route D Alternative - Cuyamaca Peak - Existing 
            View 
            Fig. E.3.3-2B. 
            Key Viewpoint 65 - Route D Alternative - Cuyamaca Peak - Visual Simulation 
            Fig. E.3.3-3. 
            Key Viewpoint 66 - Route D Alternative - Inaja Monument Overlook - 
            Existing View and Simulation 
            Visual 
            Appendix: 
            - VR-1: 
            Summary of Key Viewpoint Analyses 
             
            E.3.4. Land Use 
            Land Use Appendix: 
            - Fig. 
            E.3.4-1. Route D Alternative 
            - Fig. 
            E.3.4-2. Route D Alternative 
            - Fig. 
            E.3.4-3. Route D Alternative 
            E.3.5. 
            Wilderness and Recreation 
            E.3.6. Agriculture 
            Agriculture Appendix: 
            - Fig. 
            E.3.6-1. Route D Alternative 
            - Fig. 
            E.3.6-2. Route D Alternative 
            - Fig. 
            E.3.6-3. Route D Alternative 
            E.3.7. 
            Cultural and Paleontological Resources 
            E.3.8. Noise 
            E.3.9. Transportation and Traffic 
            E.3.10. Public Health and Safety 
            - Contamination 
            E.3.11. Air Quality 
            E.3.12. Water Resources 
            E.3.13. Geology, Mineral Resources, 
            and Soils 
            E.3.14. Socioeconomics 
            E.3.15. Fire and 
            Fuels Management 
            Fig. 
            E.3.15-1. Route D Alternative Overview Map 
            Fig. E.3.15-2. Reported 13-Year Wildfire Ignition History in Alternative 
            Route Pine Hills Fireshed* 
            Fig. E.3.15-3. Pine Hills Fireshed 50-year Wildfire History* 
            Fig. 
            E.3.15-4. Boulder Creek Fireshed Route D Alternative Burn Probability 
            Model 
            Fig. 
            E.3.15-5. Pine Hills Fireshed Route D Alternative Burn Probability 
            Model 
            Fig. 
            E.3.15-6. Boulder Creek Fireshed Route D Alternative Fire Behavior 
            Trend Model 
            Fig. 
            E.3.15-7. Pine Hills Fireshed Route D Alternative Fire Behavior 
            Trend Model 
            Fig. 
            E.3.15-8. Boulder Creek Fireshed Route D Alternative Wildfire 
            Containment Conflict Model 
            Fig. 
            E.3.15-9. Pine Hills Fireshed Route D Alternative Wildfire Containment 
            Conflict Model | 
        
 
          E.4 Modified Route D Alternative 
            E.4.1. 
            Description of the Modified Route D Alternative 
            Fig. 
            E.4.1-1a. Modified Route D Alternative - Overview and Draft 368 
            Corridor 
            Fig. 
            E.4.1-1b. Modified Route D Alternative (MPs MRD-0 to 12) (5.4MB) 
            Fig. 
            E.4.1-1c. Modified Route D Alternative (MPs MRD-12 to 22) (4.8MB) 
            Fig. 
            E.4.1-1d. Modified Route D Alternative (MPs 22-36.3) (4.3MB) 
            Fig. 
            E.4.1-2. Modified Route D Alternative Substation 
            Fig. 
            E.4.1-3. Modified Route D Alternative: Star Valley Route Option 
            and Revision 
            Fig. 
            E.4.1-4. Modified Route D Alternative: PCT Option C/D 
            E.4.2. 
            Biological Resources 
            E.4.3. Visual Resources 
            Fig. 
            E.4.3-1A/B. Key Viewpoint 67 - Modified Route D Alternative - 
            South Buckman Springs Road - Existing View and Simulation 
            Fig. E.4.3-2A. 
            Key Viewpoint 68 - Modified Route D Alternative - Lyons Valley Road 
            - Existing View (3.1MB) 
            Fig. E.4.3-2B. 
            Key Viewpoint 68 - Modified Route D Alternative - Lyons Valley Road 
            - Visual Simulation (3.2MB) 
            Fig. E.4.3-3A. 
            Key Viewpoint 69 - Modified Route D Alternative - Japatul Road - Existing 
            View 
            Fig. E.4.3-3B. 
            Key Viewpoint 69 - Modified Route D Alternative - Japatul Road - Visual 
            Simulation 
            Fig. E.4.3-4A. 
            Key Viewpoint 70 - Star Valley Option- Star Valley Road - Existing 
            View 
            Fig. E.4.3-4B. 
            Key Viewpoint 70 - Star Valley Option- Star Valley Road - Visual Simulation 
            Visual 
            Appendix: 
            - VR-1. 
            Summary of Key Viewpoint Analyses  
            E.4.4. Land Use 
            Land Use Appendix: 
            - Fig. 
            E.4.4-1. Modified Route D Alternative 
            - Fig. 
            E.4.4-2. Modified Route D Alternative 
            - Fig. 
            E.4.4-3. Modified Route D Alternative 
            - Fig. 
            E.4.4-4. Modified Route D Alternative 
            - Fig. 
            E.4.4-5. Modified Route D Alternative and 
            Star Valley Option 
            E.4.5. 
            Wilderness and Recreation 
            E.4.6. Agriculture 
            Agriculture Appendix: 
            - Fig. 
            E.4.6-1. Modified Route D Alternative 
            - Fig. 
            E.4.6-2. Modified Route D Alternative 
            - Fig. 
            E.4.6-3. Modified Route D Alternative 
            - Fig. 
            E.4.6-4. Modified Route D Alternative 
            - Fig. 
            E.4.6-5. Modified Route D Alternative 
            E.4.7. 
            Cultural and Paleontological Resources 
            E.4.8. Noise 
            E.4.9. Transportation and Traffic 
            E.4.10. Public Health and Safety 
            E.4.11. Air Quality 
            E.4.12. Water Resources 
            E.4.13. Geology, Mineral Resources, 
            and Soils 
            E.4.14. Socioeconomics 
            E.4.15. Fire and Fuels Management 
            Fig. 
            E.4.15-1. Modified Route D Alternative Overview Map 
            Fig. E.4.15-2. Reported 13-Year Wildfire Ignition History in Alternative 
            Route Campo Fireshed* 
            Fig. E.4.15-3. Campo Fireshed 50-Year Wildfire History* 
            Fig. E.4.15-4. Reported 13-Year Wildfire Ignition History in Alternative 
            Route Dulzura Fireshed* 
            Fig. E.4.15-5. Dulzura Fireshed 50-Year Wildfire History* 
            Fig. 
            E.4.15-6. La Posta Fireshed Modified Route D Alternative Burn 
            Probability Model 
            Fig. 
            E.4.15-7. Campo Fireshed Modified Route D Alternative Burn Probability 
            Model 
            Fig. 
            E.4.15-8. Dulzura Fireshed Modified Route D Alternative Burn Probability 
            Model 
            Fig. 
            E.4.15-9. Guatay Fireshed Modified Route D Alternative Burn Probability 
            Model 
            Fig. 
            E.4.15-10. La Posta Fireshed Modified Route D Alternative Fire 
            Behavior Trend Model 
            Fig. 
            E.4.15-11. Campo Fireshed Modified Route D Alternative Fire Behavior 
            Trend Model 
            Fig. 
            E.4.15-12. Dulzura Fireshed Modified Route D Alternative Fire 
            Behavior Trend Model 
            Fig. 
            E.4.15-13. Guatay Fireshed Modified Route D Alternative Fire Behavior 
            Trend Model 
            Fig. 
            E.4.15-14. La Posta Fireshed Modified Route D Alternative Wildfire 
            Containment Conflict Model 
            Fig. 
            E.4.15-14a. La Posta Fireshed Modified Route D Alternative Revisions 
            Wildfire Containment Conflict Model 
            Fig. 
            E.4.15-15. Campo Fireshed Modified Route D Alternative Wildfire 
            Containment Conflict Model 
            Fig. 
            E.4.15-15a. Campo Fireshed Modified Route D Alternative Revisions 
            Wildfire Containment Conflict Model 
            Fig. 
            E.4.15-16. Dulzura Fireshed Modified Route D Alternative Wildfire 
            Containment Conflict Model 
            Fig. 
            E.4.15-16a. Dulzura Fireshed Modified Route D Alternative Revisions 
            Wildfire Containment Conflict Model 
            Fig. 
            E.4.15-17. Guatay Fireshed Modified Route D Alternative Wildfire 
            Containment Conflict Model 
            Fig. 
            E.4.15-17a. Guatay Fireshed Modified Route D Alternative Revisions 
            Wildfire Containment Conflict Model | 
        
 
          E.5 
            New In-Area Renewable Generation 
            E.5.1. Description of Alternative Components 
            Fig. 
            E.5.1-1a. New In-Area Renewable Generation Alternative, Solar 
            Thermal Vicinity Map 
            Fig. 
            E.5.1-1b. Parabolic Trough Solar Plant at Kramer Junction, California 
            Fig. 
            E.5.1-1c. Parabolic Trough Collector 
            Fig. 
            E.5.1-1d. Solar Thermal Transmission Line Upgrade Options 
            Fig. E.5.1-2. 
            New In-Area Renewable Generation Alternative, Biomass Component 
            Fig. 
            E.5.1-3A/B. Biomass: Rendering of Proposed Fallbrook Renewable 
            Energy Facility 
            Fig. 
            E.5.1-3c. Location of Fallbrook Energy Facility Potential Interconnections 
            Fig. E.5.1-4. 
            Biomass and Biogas: Miramar Sites 
            Fig. 
            E.5.1-5. San Diego Area Regional Wind Resources 
            Fig. E.5.1-6a. 
            New In-Area Renewable Generation Alternative, Wind Component 
            Fig. 
            E.5.1-6b. Wind Component Detail 
            Fig. 
            E.5.1-6c. Jacumba Substation Potential Site 
            E.5.2. Biological Resources 
            E.5.3. Visual Resources 
            E.5.4. Land Use 
            Land Use Appendix: 
            - Fig. Ap.LU.E.5-1. 
            New In-Area Renewable Generation 
            - Fig. Ap.LU.E.5-2. 
            New In-Area Renewable Generation 
            - Fig. Ap.LU.E.5-3. 
            New In-Area Renewable Generation 
            - Fig. Ap.LU.E.5-4. 
            New In-Area Renewable Generation 
            - Fig. Ap.LU.E.5-5. 
            New In-Area Renewable Generation 
            - Fig. Ap.LU.E.5-6. 
            New In-Area Renewable Generation 
            - Fig. Ap.LU.E.5-7. 
            New In-Area Renewable Generation  
            E.5.5. Wilderness and Recreation 
            E.5.6. Agriculture 
            Agriculture Appendix: 
            - Fig. Ap.AG.E.5-1. 
            New In-Area Renewable Generation 
            - Fig. Ap.AG.E.5-2. 
            New In-Area Renewable Generation 
            - Fig. Ap.AG.E.5-3. 
            New In-Area Renewable Generation 
            - Fig. Ap.AG.E.5-4. 
            New In-Area Renewable Generation 
            - Fig. Ap.AG.E.5-5. 
            New In-Area Renewable Generation 
            - Fig. Ap.AG.E.5-6. 
            New In-Area Renewable Generation 
            E.5.7. Cultural and Paleontological Resources 
            E.5.8. Noise 
            E.5.9. Transportation and Traffic 
            E.5.10. Public Health and Safety 
            E.5.11. Air Quality 
            E.5.12. Water Resources 
            E.5.13. Geology, Mineral Resources, and Soils 
            E.5.14. Socioeconomics, Public Services, and Utilities 
            E.5.15. Fire and Fuels Management 
            E.5.16. References | 
        
 
          E.6 New 
            In-Area All-Source Generation 
            E.6.1. Description of New In-Area All-Source Generation 
            Fig. 
            E.6.1-1. Components of New In-Area All-Source Generation Alternative 
            Fig. 
            E.6.1-2a. New In-Area All-Source Generation Alternative, South 
            Bay Replacement Project 
            Fig. E.6.1-2b. Photosimulation of South Bay Replacement Project and 
            Adjacent Switchyard* 
            Fig. 
            E.6.1-3. New In-Area All Source Generation Alternative, San Diego 
            Community Power Project 
            Fig. 
            E.6.1-4a. General Equipment Layout for Peaker Power Plant Miramar 
            Fig. 
            E.6.1-4b. Pala Peaker Plant Site 
            Fig. 
            E.6.1-4c. Margarita Peaker Power Plant Site 
            Fig. 
            E.6.1-4d. Borrego Springs Peaker Power Plant SiteE.6.2. Biological 
            Resources 
            E.6.3. Visual Resources 
            Fig. 
            E.6.3-1A. Key Viewpoint 71 - Marina Way Parking Lot - Existing 
            View 
            Fig. E.6.3-1B. 
            Key Viewpoint 71 - Marina Way Parking Lot - Visual Simulation 
            Fig. E.6.3-2A. 
            Key Viewpoint 72 - Brentwood Park - Existing View 
            Fig. E.6.3-2B. 
            Key Viewpoint 72 - Brentwood Park - Visual Simulation 
            Fig. E.6.3-3A/B. Key 
            Viewpoint 73 - Silver Strand - Existing View and Simulation 
            Fig. 
            E.6.3-4A. Key Viewpoint 74 - SDCPP: Strathmore Drive - Existing 
            View 
            Fig. 
            E.6.3-4B. Key Viewpoint 74 - SDCPP: Strathmore Drive - Visual 
            Simulation 
            Fig. E.6.3-5A. 
            Key Viewpoint 75 - Miramar Road - Existing View 
            Fig. E.6.3-5B. 
            Key Viewpoint 75 - Miramar Road - Visual Simulation 
            Fig. E.6.3-6A. 
            Key Viewpoint 76 - SR76 - Existing View (3.1MB) 
            Fig. E.6.3-6B. 
            Key Viewpoint 76 - SR76 - Visual Simulation 
            Fig. E.6.3-7A/B. Key 
            Viewpoint 77 - Founders Park - Existing View and Simulation 
            Fig. E.6.3-8A/B. Key 
            Viewpoint 78 - Borrego Valley Road - Existing View and Simulation 
            Visual Resources Appendix: 
            - VR-1: 
            Appendix VR-1: Visual Resources - Summary of Key Viewpoint Analyses 
            E.6.4. Land Use  
            Land Use Appendix: 
            - Fig. Ap.LU.E.6-1. 
            New In-Area All-Source Generation 
            - Fig. 
            Ap.LU.E.6-2. New 
            In-Area All-Source Generation 
            - Fig. 
            Ap.LU.E.6-3. New 
            In-Area All-Source Generation 
            E.6.5. Wilderness and Recreation 
            E.6.6. Agriculture 
            Agriculture Appendix: 
            - Fig. 
            Ap.AG.E.6-1. New 
            In-Area All-Source Generation - San 
            Diego Community Power Project 
            E.6.7. Cultural and Paleontological Resources 
            E.6.8. Noise 
            E.6.9. Transportation and Traffic 
            E.6.10. Public Health and Safety 
            E.6.11. Air Quality 
            E.6.12. Water Resources 
            E.6.13. Geology, Mineral Resources, and Soils 
            E.6.14. Socioeconomics, Public Services, and Utilities 
            E.6.15. Fire and Fuels Management 
            E.6.16. References for New In-Area All Source Generation | 
        
 
          E.7 
            System Alternatives 
            E.7.1. LEAPS Transmission-Only Alternative 
            E.7.1.1. LEAPS Transmission-Only Alternative Description 
            Fig. 
            E.7.1-1. LEAPS Transmission-Only Alternative 
            Fig. 
            E.7.1-2a. LEAPS Transmission-Only Alternative: Lee Lake to Elsinore 
            Fig. 
            E.7.1-2b. LEAPS Transmission-Only Alternative: Elsinore to Pendleton 
            Substation 
            Fig. 
            E.7.1-2c. LEAPS Transmission-Only Alternative: Talega Substation 
            to Pala 
            Fig. 
            E.7.1-2d. LEAPS Transmission-Only Alternative: Pala to Escondido 
            E.7.1.2. 
            Biological Resources 
            E.7.1.3. Visual Resources 
            Fig. 
            E.7.1.3-1. LEAPS Transmission-Only Alternative: Key Viewpoints 
            Fig. 
            E.7.1.3-2a. LEAPS KVP L1 Existing View 
            Fig. 
            E.7.1.3-2b. LEAPS KVP L1 Simulation 
            Fig. E.7.1.3-3a. 
            LEAPS KVP L2 Existing View 
            Fig. 
            E.7.1.3-3b. LEAPS KVP L2 Simulation 
            Fig. E.7.1.3-4a. 
            LEAPS KVP L2 Existing View 
            Fig. 
            E.7.1.3-4b. LEAPS KVP L2 Simulation 
            Fig. E.7.1.3-5a. 
            LEAPS KVP L3 Existing View 
            Fig. 
            E.7.1.3-5b. LEAPS KVP L3 Simulation 
            Fig. E.7.1.3-6a. 
            LEAPS KVP L4 Existing View 
            Fig. 
            E.7.1.3-6b. LEAPS KVP L4 Simulation 
            Fig. E.7.1.3-7a. 
            LEAPS KVP L5 Existing View 
            Fig. E.7.1.3-7b. 
            LEAPS KVP L5 Simulation 
            Fig. E.7.1.3-8a. 
            LEAPS KVP L6 Existing View 
            Fig. E.7.1.3-8b. 
            LEAPS KVP L6 Simulation 
            Fig. E.7.1.3-9a. 
            LEAPS KVP L7 Existing View 
            Fig. 
            E.7.1.3-9b. LEAPS KVP L7 Simulation 
            Fig. E.7.1.3-10a. 
            LEAPS KVP L8 Existing View 
            Fig. 
            E.7.1.3-10b. LEAPS KVP L8 Simulation 
            E.7.1.4. 
            Land Use 
            Fig. 
            E.7.1.4-1. LEAPS Alternative: Cleveland National Forest Land Use 
            Zones 
            E.7.1.5. 
            Wilderness and Recreation 
            E.7.1.6. Agriculture 
            E.7.1.7. Cultural and Paleontological Resources 
            E.7.1.8. Noise 
            E.7.1.9. Transportation and Traffic 
            E.7.1.10. Public Health and Safety 
            E.7.1.11. Air Quality 
            E.7.1.12. Water Resources 
            E.7.1.13. Geology, Mineral Resources, and Soils 
            E.7.1.14. Socioeconomics, Public Services, and Utilities 
            E.7.1.15. Fuels and Fire Management 
            Fig. 
            E.7.1.15-1. LEAPS Fireshed Overview Map 
            Fig. E.7.1.15-2. Lake Elsinore Fireshed Wildfire History* 
            Fig. E.7.1.15-3. Margarita Fireshed Wildfire History* 
            Fig. 
            E.7.1.15-4. Lake Elsinore Fireshed Burn Probability Model 
            Fig. 
            E.7.1.15-5. Margarita Fireshed Burn Probability Model 
            Fig. 
            E.7.1.15-6. Lake Elsinore Fireshed Fire Behavior Trend Model 
            Fig. 
            E.7.1.15-7. Margarita Fireshed Fire Behavior Trend Model 
            Fig. 
            E.7.1.15-8. Lake Elsinore Fireshed Firefighter Threat Assessment 
            Model 
            Fig. 
            E.7.1.15-9. Lake Elsinore Fireshed Firefighter Threat Assessment 
            Model 
            E.7.2. 
            LEAPS Generation and Transmission Alternative 
            E.7.2.1. LEAPS Generation and Transmission Alternative Description 
            Fig. 
            E.7.2-1. LEAPS Generation and Transmission Alternative 
            E.7.2.2. 
            Biological Resources 
            E.7.2.3. Visual Resources 
            Fig. 
            E.7.2.3-1A. LEAPS KVP L9 Existing View 
            Fig. E.7.2.3-1B. 
            LEAPS KVP L9 Simulation 
            Fig. E.7.2.3-2. 
            LEAPS KVP L10 Existing View and Simulation 
            Fig. E.7.2.3-3A. 
            LEAPS KVP L3 Existing View 
            Fig. E.7.2.3-3B. 
            LEAPS KVP L3 Simulation 
            Fig. E.7.2.3-4A. 
            LEAPS KVP L5 Existing View 
            Fig. E.7.2.3-4B. 
            LEAPS KVP L5 Simulation 
            E.7.2.4. Land Use 
            E.7.2.5. Wilderness and Recreation 
            E.7.2.6. Agriculture 
            E.7.2.7. Cultural and Paleontological Resources 
            E.7.2.8. Noise 
            E.7.2.9. Transportation and Traffic 
            E.7.2.10. Public Health and Safety 
            E.7.2.11. Air Quality 
            E.7.2.12. Water Resources 
            Fig. E.7.2.12-1. Extent of Inundation Resulting from Dam/Dike Break* 
            E.7.2.13. Geology, Mineral Resources, and Soils 
            E.7.2.14. Socioeconomics, Public Services, and Utilities 
            E.7.2.15. Fuels and Fire Management  
            E.7.3. Mitigation Monitoring, Compliance, and Reporting Table 
            E.7.4. References  | 
        
 
          E.8 Environmental 
            Impacts of the No Project/No Action Alternative 
            E.8.1. Description of the No Project/No Action Alternative 
            E.8.2. Biological Resources 
            E.8.3. Visual Resources 
            E.8.4. Land Use 
            E.8.5. Wilderness and Recreation 
            E.8.6. Agriculture 
            E.8.7. Cultural and Paleontological Resources 
            E.8.8. Noise 
            E.8.9. Transportation and Traffic 
            E.8.10. Public Health and Safety 
            E.8.11. Air Quality 
            E.8.12. Water Resources 
            E.8.13. Geology, Mineral Resources, and Soils 
            E.8.14. Socioeconomics, Public Services, and Utilities 
            E.8.15. Fire and Fuels Management 
            E.8.16. References | 
        
 
          F. Other 
            CEQA and NEPA Requirements 
            F.1. Environmental Justice 
            F.2. Growth-Inducing Effects 
            F.3. Significant Irreversible Changes and Irretrievable Commitments 
            of Resources 
            F.4. Significant Environmental Effects which Cannot be Avoided if 
            the Proposed Project is Implemented 
            F.5. Relationship Between Short-Term Uses and Long-Term Productivity 
            of the Environment 
            F.6. Energy Conservation 
            F.7. References 
            Fig. 
            F-1. Environmental Justice - Imperial County Detail 
            Fig. 
            F-2. Environmental Justice - Santa Ysabel Reservation 
            Fig. 
            F-3. Environmental Justice - Barona Reservation 
            Fig. 
            F-4. Environmental Justice - Campo, La Posta, and Manzanita Reservations 
            Fig. 
            F-5. Environmental Justice - Pauma and Yuima and Pala Reservations | 
        
 
          G. Cumulative Scenario 
            and Impacts 
            G.1. Introduction and Methodology 
            G.2. Applicable Cumulative Projects and Projections 
            G.3. Cumulative Impact Analysis of the Proposed Project 
            G.4. Cumulative Impact Analysis of Alternatives 
            Fig. 
            G-1. Cumulative Projects: Imperial Valley Link 
            Fig. 
            G-2. Cumulative Projects: Anza-Borrego Link 
            Fig. G-3. 
            Cumulative Projects: Central Link 
            Fig. 
            G-4. Cumulative Projects: Inland Valley Link 
            Fig. G-5. 
            Cumulative Projects: Coastal Link 
            Fig. G-6. 
            Cumulative Projects: San Luis Rey Substation 
            Fig. G-7. 
            Cumulative Projects: South Bay Substation 
            Fig. 
            G-8. Cumulative Projects: SWPL Alternatives Eastern Portion 
            Fig. 
            G-9. Cumulative Projects: SWPL Alternatives Central Portion 
            Fig. 
            G-10. Cumulative Projects: SWPL Alternatives Western Portion | 
        
 
          H. Comparison 
            of Alternatives 
            H.1. Regulatory Requirements for Alternatives Comparison 
            H.2. Alternatives Comparison Methodology 
            H.3. Comparison of Alternatives along Proposed Project Route Links 
            H.4. Comparison of Southern (SWPL) Alternatives 
            H.5. Comparison of LEAPS System Alternatives with the Final Environmentally 
            Superior Alternative for the Proposed Project Route and the Final 
            Environmentally Superior SWPL Alternative 
            H.6. Comparison of Environmentally Superior Transmission Line Route 
            Alternative (LEAPS Transmission-Only Alternative) with Non-Wires Alternatives 
            H.7. No Project Alternative vs. the Environmentally Superior Alternative 
            Fig. 
            ES-4. Final Environmentally Superior Northern Route Alternative 
            (4.8MB) 
            Fig. 
            H-3. Environmentally Superior Transmission Line Alternative (LEAPS 
            Transmission-Only Alternative) 
            Fig. 
            H-4. Overall Environmentally Superior Alternative (New In-Area 
            All-Source Generation Alternative) | 
        
 
          I. 
            Mitigation Monitoring and Reporting 
            I.1. Authority for the Mitigation Monitoring, Compliance, and Reporting 
            Program 
            I.2. Organization of the Final Mitigation Monitoring Plan 
            I.3. Roles and Responsibilities 
            I.4. Enforcement Responsibility 
            I.5. Mitigation Compliance Responsibility 
            I.6. Dispute Resolution 
            I.7. General Monitoring Procedures 
            I.8. Condition Effectiveness Review 
            I.9. Mitigation Monitoring Program Tables | 
        
 
          J. Public 
            Participation 
            J.1. Introduction 
            J.2. Public Participation Program 
            J.3. Draft EIR/EIS Public Review Period 
            J.4. Recirculated Draft EIR/Supplemental Draft EIS Public Review Period | 
        
 
          | K. Glossary | 
        
 
          | L. Index | 
        
 
            
            Draft EIR/EIS Appendices  | 
        
 
          Appendix 1. Alternatives 
            Screening Report 
            1. Introduction 
            2. Background and Previous Documents 
            3. Overview of Alternatives Evaluation Process 
            4. Alternative Descriptions and Determinations 
            5. References 
            Attachment 
            1A. Effect of Wildfires on Transmission Line Reliability 
            Attachment 
            1B. Caltrans' Policies 
            Fig. 
            Ap.1-1. Imperial Valley Link - Alternatives Considered 
            Fig. 
            Ap.1-2. Imperial Valley Link - Alternatives Retained 
            Fig. 
            Ap.1-3. Anza-Borrego Link - Alternatives Considered 
            Fig. 
            ES-13. Anza-Borrego Link - Alternatives Retained (5.5MB) 
            Fig. 
            Ap.1-5. San Felipe 230/500 kV Substation for Partial Underground 
            230 kV ABDSP SR78 to S2 Alternative 
            Fig. 
            Ap.1-6. Underground Cross Section of Duct Bank 
            Fig. Ap.1-7. 
            Earthquake Valley Fault Zone 
            Fig. 
            Ap.1-8. SDG&E 100-Foot ROW Shorter Structure Alternative - 
            Typical 500 kV Structures 
            Fig. 
            Ap.1-9. SDG&E Existing ROW Shorter Structure Alternative - 
            Typical 69 kV Structures 
            Fig. Ap.1-10. 
            Central Link - Alternatives Considered 
            Fig. Ap.1-11. 
            Central Link - Alternatives Considered - Santa Ysabel Detail 
            Fig. ES-14. 
            Central Link Alternatives Retained (6.1MB) 
            Fig. Ap.1-13. 
            Elsinore Fault Alquist-Priolo Fault Zone 
            Fig. Ap.1-14. 
            Mesa Grande Alternative 
            Fig. Ap.1-15. 
            Inland Valley Link - Alternatives Considered 
            Fig. Ap.1-16. CNF 
            Existing 69 kV Route Alternative 
            Fig. Ap.1-17. 
            Oak Hollow Road Underground Alternative 
            Fig. Ap.1-18. 
            San Vicente Transition Alternative 
            Fig. Ap.1-19. 
            Chuck Wagon Road Alternative 
            Fig. ES-16. 
            Coastal Link Alternatives Retained (4.3MB) 
            Fig. Ap.1-21. 
            Coastal Link Alternatives Eliminated 
            Fig. Ap.1-22a. 
            Pomerado Road to Miramar Area North Alternative (East) 
            Fig. Ap.1-22b. 
            Pomerado Road to Miramar Area North Alternative (West) 
            Fig. Ap.1-23. 
            Los Peñasquitos Canyon Preserve-Mercy Road Alternative 
            Fig. 
            Ap.1-24. Black Mountain Road to Park Village Road Underground 
            Alternative 
            Fig. 
            Ap.1-25. Coastal Link System Upgrades (5.5MB) 
            Fig. 
            3-3. Top of the World Substation Alternative 
            Fig. Ap.1-27a. 
            Southwest Powerlink Transmission Line and Interstate 8 Alternative 
            Fig. ES-17. 
            Southwest Powerlink Alternatives Retained 
            Fig. Ap.1-27c. 
            Southwest Powerlink Alternatives Eliminated in San Diego County 
            Fig. Ap.1-28. 
            Fire Risk Along SWPL 
            Fig. 
            Ap.1-29. SWPL Alternatives, Future Transmission System Expansion 
            Fig. 
            Ap.1-30. System Alternatives Retained 
            Fig. 
            Ap.1-31. System Alternatives Eliminated 
            Fig. 
            Ap.1-32a. LEAPS Transmission Only Alternative 
            Fig. 
            Ap.1-32b. LEAPS Generation and Transmission Alternative 
            Fig. 
            Ap.1-33a. New In-Area Renewable Generation Alternative, Solar 
            Thermal Component 
            Fig. 
            Ap.1-33b. San Diego Regional Wind Resources 
            Fig. Ap.1-33c. 
            New In-Area Renewable Generation Alternative, Wind Component 
            Fig. 
            Ap.1-34. Components of New In-Area All-Source Generation Alternative 
            Fig. Ap.1-35. DG Penetration Projections (Nameplate Capacity)* 
            Fig. Ap.1-36. Statewide First-Year Peak Savings of Utility Energy 
            Efficiency Programs* 
            Fig. Ap.1-37. Energy Efficiency Peak Demand Reduction Projections* | 
        
 
          Appendix 2. Policy 
            Screening Report 
            1. Introduction and Purpose 
            2. Federal Plans and Documents 
            3. State Plans and Policies 
            4. Local Plans and Policies 
            5. Tribal Government Documents | 
        
 
          Appendix 3. Fire and Fuels Management 
            3A. Field Approach and Implementation 
             Fuel 
            Inventory Cruise Plan 
             
            3B. Sunrise Fireshed Fuel Model Photos 
             Fireshed 
            Fuel Typing Photographs 
            Fuel 
            Model Coding List 
            Photographic 
            Index and Approach to Fuel Coding 
             3C. Analysis and Processing 
             California 
            Power Line Fire Prevention Field Guide (9.3MB) 
            Pre-Fire 
            Management Plan 
             3D. Applicable Regulations, Plans and Standards 
            SDG&E 
            and CAL FIRE MOU on SWPL 
            SDG&E 
            Guide for Encroachment 
            SDG&E 
            Wildland Fire Prevention & Fire Safety Guide 
            3E. Fire Behavior Trend Models - Comparison of Alternatives 
            Fig. Ap.3E-1. 
            Proposed Project, Fire Behavior Trend Model-1 (6.8MB) 
            Fig. Ap.3E-2. 
            Proposed Project, Fire Behavior Trend Model-2 (6.8MB) 
            Fig. Ap.3E-3. 
            Proposed Project, Fire Behavior Trend Model-3 (7.2MB) 
            Fig. 
            Ap.3E-4. Proposed Project, Fire Behavior Trend Model-4 (7.1MB) 
            Fig. Ap.3E-5. 
            Environmentally Superior Northern Route, Fire Behavior Trend Model-1 
            (6.9MB) 
            Fig. Ap.3E-6. 
            Environmentally Superior Northern Route, Fire Behavior Trend Model-2 
            (6.9MB) 
            Fig. Ap.3E-7. 
            Environmentally Superior Northern Route, Fire Behavior Trend Model-3 
            (7.3MB) 
            Fig. Ap.3E-8. 
            Environmentally Superior Northern Route, Fire Behavior Trend Model-4 
            (7.2MB) 
            Fig. Ap.3E-9. 
            Environmentally Superior Southern Route, Fire Behavior Trend Model-1 
            (6.6MB) 
            Fig. Ap.3E-10. 
            Environmentally Superior Southern Route, Fire Behavior Trend Model-2 
            (6.6MB) 
            Fig. Ap.3E-11. 
            Environmentally Superior Southern Route, Fire Behavior Trend Model-3 
            (6.8MB) 
            Fig. Ap.3E-12. 
            Environmentally Superior Southern Route, Fire Behavior Trend Model-4 
            (6.8MB) 
            Fig. Ap.3E-13. 
            LEAPS Project Alternatives, Fire Behavior Trend Model-1 (6.2MB) 
            Fig. Ap.3E-14. 
            LEAPS Project Alternatives, Fire Behavior Trend Model-2 (6.2MB) 
            Fig. Ap.3E-15. 
            LEAPS Project Alternatives, Fire Behavior Trend Model-3 (6.4MB) 
            Fig. Ap.3E-16. 
            LEAPS Project Alternatives, Fire Behavior Trend Model-4  (6.2MB) | 
        
 
          | Appendix 
            4. Persons and Organizations Consulted | 
        
 
          | Appendix 
            5. Preparers of the EIR/EIS | 
        
 
          Appendix 6. Recipients of the Draft EIR/EIS and Final 
            EIR/EIS 
            Appendix 
            6A. Recipients of the Hardcopy Draft EIR/EIS 
            Appendix 
            6B. Recipients of the Executive Summary for the Draft EIR/EIS 
            Appendix 
            6C. Recipients of the Hardcopy Final EIR/EIS 
            Appendix 
            6D. Recipients of the Executive Summary for the Final EIR/EIS | 
        
 
          | Appendix 
            7. SDG&E's EMF Field Management Plan for Sunrise Powerlink | 
        
 
          |  
             Appendix 8. Biological Resources 
              8A. Proposed Project 
              Proposed 
              Project Habitat Index Map 
              Fig 
              Ap8A-00 Index Map 
              Fig 
              Ap8A-01 Proposed Project 
              Fig 
              Ap8A-02 Proposed Project 
              Fig 
              Ap8A-03 Proposed Project 
              Fig 
              Ap8A-04 Proposed Project 
              Fig 
              Ap8A-05 Proposed Project 
              Fig 
              Ap8A-06 Proposed Project 
              Fig 
              Ap8A-07 Proposed Project 
              Fig 
              Ap8A-08 Proposed Project 
              Fig 
              Ap8A-09 Proposed Project 
              Fig 
              Ap8A-10 Proposed Project 
              Fig 
              Ap8A-11 Proposed Project 
              Fig 
              Ap8A-12 Proposed Project 
              Fig 
              Ap8A-13 Proposed Project 
              Fig 
              Ap8A-14 Proposed Project 
              Fig 
              Ap8A-15 Proposed Project 
              Fig 
              Ap8A-16 Proposed Project 
              Fig 
              Ap8A-17 Proposed Project 
              Fig 
              Ap8A-18 Proposed Project 
              Fig 
              Ap8A-19 Proposed Project 
              Fig 
              Ap8A-20 Proposed Project 
              Fig 
              Ap8A-21 Proposed Project 
              Fig 
              Ap8A-22 Proposed Project (4.4MB) 
              Fig 
              Ap8A-23 Proposed Project 
              Fig 
              Ap8A-24 Proposed Project (3.8MB) 
              Fig 
              Ap8A-25 Proposed Project 
              (5.4MB) 
              Fig 
              Ap8A-25A Vernal Pools Proposed Project 
              Fig 
              Ap8A-25B Vernal Pools Proposed Project 
              Fig 
              Ap8A-26 Proposed Project 
              Fig 
              Ap8A-27 Proposed Project 
              Fig 
              Ap8A-28 Proposed Project 
              Fig 
              Ap8A-29 Proposed Project 
              Fig 
              Ap8A-30 Proposed Project 
              Fig 
              Ap8A-31 Proposed Project 
              8B. 
              Protocol Survey Summary Table 
              8C. Special Status Species Surveys 
              Fig 
              Ap8C-01 Survey Locations - Arroyo Toad 
              Fig 
              Ap8C-02 Survey Locations - Bald Eagle 
              Fig 
              Ap8C-03 Survey Locations - Burrowing Owl 
              Fig 
              Ap8C-04 Survey Locations - Coastal California Gnatcatcher 
              Fig 
              Ap8C-05 Survey Locations - Desert Tortoise 
              Fig 
              Ap8C-06 Survey Locations - Least Bell's Vireo 
              Fig 
              Ap8C-07 Survey Locations - Quino Checkerspot Butterfly 
              Fig 
              Ap8C-08 Survey Locations - San Diego and Riverside Fairy Shrimp 
              Fig 
              Ap8C-09 Survey Locations - Stephens' Kangaroo Rat 
              Fig 
              Ap8C-10 Survey Locations - Southwestern Willow Flycatcher 
               8D. Imperial Valley Link Alternatives 
              Habitat Maps 
               Fig 
              Ap8D-00 Route Segment Alternatives Index 
              Fig 
              Ap8D-01 Imperial Valley Link Alternatives 
              Fig 
              Ap8D-02 Imperial Valley Link Alternatives 
              Fig 
              Ap8D-03 Imperial Valley Link Alternatives   
              8E. Anza-Borrego Link Alternatives Habitat Maps 
              Fig 
              Ap8E-01 Anza-Borrego Alternatives 
              Fig 
              Ap8E-02 Anza-Borrego Alternatives 
              Fig 
              Ap8E-03 Anza-Borrego Alternatives 
              Fig 
              Ap8E-04 Anza-Borrego Alternatives 
              Fig 
              Ap8E-05 Anza-Borrego Alternatives 
              Fig 
              Ap8E-06 Anza-Borrego Alternatives 
              Fig 
              Ap8E-07 Anza-Borrego Alternatives 
              Fig 
              Ap8E-08 Anza-Borrego Alternatives 
              Fig 
              Ap8E-09 Anza-Borrego Alternatives 
              Fig 
              Ap8E-10 Anza-Borrego Alternatives 
               8F. Central Link Alternatives Habitat 
              Maps 
              Fig 
              Ap8F-01 Central Link Alternatives 
              Fig 
              Ap8F-02 Central Link Alternatives 
              Fig 
              Ap8F-03 Central Link Alternatives 
              Fig 
              Ap8F-04 Central Link Alternatives 
              Fig 
              Ap8F-05 Central Link Alternatives 
              Fig 
              Ap8F-06 Central Link Alternatives 
               8G. Inland Valley Link Alternatives Habitat 
              Maps 
              Fig 
              Ap8G-01 Inland Valley Link Alternatives 
              Fig 
              Ap8G-02 Inland Valley Link Alternatives 
              Fig 
              Ap8G-03 Inland Valley Link Alternatives 
              Fig 
              Ap8G-04 Inland Valley Link Alternatives 
               8H. Coastal Link Alternatives Habitat 
              Maps 
               Fig 
              Ap8H-01 Coastal Link Alternatives 
              Fig 
              Ap8H-02 Coastal Link Alternatives 
              Fig 
              Ap8H-03 Coastal Link Alternatives 
              Fig 
              Ap8H-04 Coastal Link Alternatives 
              8I. Substation Alternative Habitat Maps 
              Fig 
              Ap8I-01 Top of the World Alternative 
              8J. SWPL Alternatives Habitat Maps 
              Fig 
              Ap8J-01 Interstate 8 Alternative 
              Fig 
              Ap8J-02 Interstate 8 Alternative 
              Fig 
              Ap8J-03 Interstate 8 Alternative 
              Fig 
              Ap8J-04 Interstate 8 Alternative 
              Fig 
              Ap8J-05 Interstate 8 Alternative 
              Fig 
              Ap8J-06 Interstate 8 Alternative 
              Fig 
              Ap8J-07 Interstate 8 Alternative 
              Fig 
              Ap8J-08 Interstate 8 Alternative 
              Fig 
              Ap8J-09 Interstate 8 Alternative 
              Fig 
              Ap8J-10 Interstate 8 Alternative 
              Fig 
              Ap8J-11 Interstate 8 Alternative 
              Fig 
              Ap8J-12 Interstate 8 Alternative 
              Fig 
              Ap8J-13 Interstate 8 Alternative 
              Fig 
              Ap8J-14 Interstate 8 Alternative 
              Fig 
              Ap8J-15 Interstate 8 Alternative 
              Fig 
              Ap8J-16 Interstate 8 Alternative 
              Fig 
              Ap8J-17 Interstate 8 Alternative 
              Fig 
              Ap8J-18 Interstate 8 Alternative 
              Fig 
              Ap8J-19 Interstate 8 Alternative 
              Fig 
              Ap8J-20 Interstate 8 Alternative 
              Fig 
              Ap8J-21 South Buckman Springs Option 
              Fig 
              Ap8J-22 Campo North Option 
              Fig Ap8J-23 
              BCD Alternative 
              Fig Ap8J-24 
              BCD Alternative 
              Fig Ap8J-25 
              BCD Alternative 
              Fig Ap8J-26 
              BCD Alternative 
              Fig 
              Ap8J-27 BCD Alternative South Option 
              Fig 
              Ap8J-28 Route D Alternative 
              Fig 
              Ap8J-29 Route D Alternative 
              Fig 
              Ap8J-30 Route D Alternative 
              Fig 
              Ap8J-31 Route D Alternative 
              Fig Ap8J-32 
              Modified Route D Alternative 
              Fig Ap8J-33 
              Modified Route D Alternative 
              Fig Ap8J-34 
              Modified Route D Alternative 
              Fig Ap8J-35 
              Modified Route D Alternative 
              Fig Ap8J-36 
              Modified Route D Alternative 
              Fig Ap8J-37 
              Modified Route D Alternative 
              Fig Ap8J-38 
              Modified Route D Alternative 
              Fig 
              Ap8J-39 Modified Route D Alternative Star Valley Option 
              8K. LEAPS Project Alternative Habitat 
              Maps 
              Fig 
              Ap8K-01 Lake Pendleton 
              Fig Ap8K-02 
              Lake Pendleton 
              Fig Ap8K-03 
              Lake Pendleton 
              Fig Ap8K-04 
              Lake Pendleton 
              Fig Ap8K-05 
              Lake Pendleton 
              Fig Ap8K-06 
              Lake Pendleton 
              Fig Ap8K-07 
              Pala Lilac 
              Fig Ap8K-08 
              Pala Lilac 
              Fig 
              Ap8K-09 LEAPS Talega-Escondido 
              Fig 
              Ap8K-10 LEAPS Talega-Escondido 
              Fig 
              Ap8K-11 LEAPS Talega-Escondido 
              Fig 
              Ap8K-12 LEAPS Talega-Escondido 
              Fig 
              Ap8K-13 LEAPS Talega-Escondido 
              Fig 
              Ap8K-14 LEAPS Talega-Escondido 
               8L. Non-Wires Alternatives Habitat Maps 
              Fig 
              Ap8L-01 Solar Thermal 
              Fig 
              Ap8L-02 Solar Thermal 
              Fig 
              Ap8L-03 Solar Thermal 
              Fig 
              Ap8L-04 Solar Thermal 
              Fig 
              Ap8L-05 Solar Thermal 
              Fig 
              Ap8L-06 Solar Thermal 
              Fig 
              Ap8L-07 Solar Thermal 
              Fig 
              Ap8L-08 Solar Thermal 
              Fig 
              Ap8L-09 Solar Thermal 
              Fig Ap8L-10 
              Wind Alternative 
              Fig Ap8L-11 
              Wind Alternative 
              Fig Ap8L-12 
              Wind Alternative 
               8M. 
              Management Indicator Species Analysis 
              (4.2MB) 
              8N. 
              Applicant Proposed Measures for Biological Resources 
              8O. 
              Consistency with Existing and Draft Regional Conservation Plans 
              Fig. 
              Ap.8O-1 Conservation Programs in San Diego County 
              Fig. 
              Ap.8O-2 City of San Diego MSCP Subarea Plan 
              Fig. 
              Ap.8O-3 County of San Diego MSCP Subarea Plan South 
              (8.8MB) 
              Fig. 
              Ap.8O-4 County of San Diego MSCP Subarea Plan North 
              8P. 
              Consolidated Impact Summary Matrix 
              8Q. Riparian 
              Conservation Area Analysis 
              8R. 
              2008 Biological Surveys 
           | 
        
 
          |  
             Appendix 9. Cultural Resources and Native American Consultation 
              9AB. 
              Cultural Resources Background and Tables 
              9C. 
              Native American Consultation and Responses 
              9D. Paleontological Sensitivity Maps: 
              Imperial Valley Link Alternative 
              Ap9D-01 
              Ap9D-02 
              Ap9D-03 
              Ap9D-04 
              Ap9D-05 
              Ap9D-06 
              Imperial Valley/Anza-Borrego Link Alternatives  
              Ap9D-07 
              Anza-Borrego/Central Valley Link Alternatives 
              Ap9D-08 
              Ap9D-09 
              Ap9D-10 
              Central Valley Link Alternative 
              Ap9D-11 
              Ap9D-12 
              Inland Valley Link Alternative  
              Ap9D-13 
              Ap9D-14 
              Ap9D-15 
              Coastal Link Alternative  
              Ap9D-16 
              Ap9D-17 
              Sycamore Canyon-Elliot Substation Reconductor  
              Ap9D-18 
              Ap9D-19 
              Interstate 8 Alternative  
              Ap9D-20 
              Ap9D-21 
              Ap9D-22 
              Ap9D-23 
              Ap9D-24 
              Ap9D-25 
              Ap9D-26 
              Ap9D-27 
              Ap9D-28 
              BCD Alternative  
              Ap9D-29 
              Modified Route D Alternative 
              Ap9D-30 
              Modified Route D Alternative and Star Valley Option  
              Ap9D-31 
              Route D Alternative 
              Ap9D-32 
              Ap9D-33 
              New In-Area Renewable Generation, Solar Thermal Alternative 
              Ap9D-34 
           | 
        
 
          | Appendix 
            10. Air Quality | 
        
 
          | Appendix 11. Detailed Route Maps | 
        
 
          |  
            
           | 
        
 
          | Appendix 12. 
            Full Text of All Mitigation Measures | 
        
 
          Appendix 13. Public Health and Safety Environmental 
            Database Searches 
            Proposed Project 
            Search 
            01 of 24 
            Search 
            02 of 24 
            Search 
            03 of 24 
            Search 
            04 of 24 
            Search 
            05 of 24 
            Search 
            06 of 24 
            Search 
            07 of 24 
            Search 
            08 of 24 
            Search 
            09 of 24 
            Search 
            10 of 24 
            Search 
            11 of 24 
            Search 
            12 of 24 
            Search 
            13 of 24 
            Search 
            14 of 24 
            Search 
            15 of 24 
            Search 
            16 of 24 
            Search 
            17 of 24 
            Search 
            18 of 24 
            Search 
            19 of 24 
            Search 
            20 of 24 
            Search 
            21 of 24 
            Search 
            22 of 24 
            Search 
            23 of 24 
            Search 
            24 of 24 
            Proposed 
            Project Atlas 1 (18.7MB) 
            Proposed 
            Project Map 1 (8.3MB) 
            Proposed 
            Project Atlas 2 (3.4MB) 
            Proposed 
            Project Map 2 
            FTSE Corridor 
            1 (13.0MB) 
            FTSE Corridor 
            1 - Map (5.7MB) 
            FTSE Corridor 
            2 (4.6MB) 
            FTSE Corridor 
            2 - Map 
            Warner 
            Substation FTSE and Solar-Thermal 
            Imperial Valley Link 
            FTHL Eastern 
            FTHL Eastern - 
            Map 
            West of Dunaway 
            West of Dunaway 
            - Map 
            Central Link 
            Santa Ysabel 
            Existing 
            Santa 
            Ysabel Existing - Map 
            Inland Valley Link 
            Chuck Wagon Road 
            Chuck Wagon 
            Road - Map 
            Coastal Link 
            Pomerado-Miramar 
            (9.1MB) 
            Pomerado-Miramar 
            - Map 
            Los Peñasquitos 
            Los Peñasquitos 
            - Map 
            SWPL 
            SWPL Alternatives 
            (9.4MB) 
            SWPL Alternatives 
            - Map (4.7MB) 
            Modified Route D 
            Modified D - 
            1 
            Modified D - 
            2 
            Modified D - 
            3 
            Modified Route 
            D (6.4MB) 
            Modified 
            Route D - Map 
            LEAPS 
            LEAPS 
            Modified Staff Alternative 
            LEAPS 
            Modified Staff Alternative - Map 
            LEAPS Talega-Escondido 
            LEAPS 
            Talega-Escondido - Map 
            Santa Rosa 
            Powerhouse 
            Santa Rosa 
            Powerhouse - Map 
            Non-Wires 
            Solar-Thermal 
            Solar-Thermal - 
            Map 
            Solar-Thermal 
            Transmission Line East and Borrego Peaker 
            Solar-Thermal 
            Transmission Line East and Borrego Peaker - Map 
            Solar-Thermal 
            Transmission Line West 
            Solar-Thermal 
            Transmission Line West - Map 
            Fallbrook 
            Renewable Energy Facility 
            Miramar Landfill 
            Wind Alternatives 
            Area 1 
            Wind Alternatives 
            Area 1 - Map 
            Wind Alternatives 
            Area 2 
            Wind Alternatives 
            Area 2 - Map 
            All-Source 
            South Bay Power Plant 
            All-Source 
            San Diego Community Power Project 
            All-Source 
            Pala Peaker 
            All-Source 
            Margarita Substation 
            All-Source 
            Miramar Substation | 
        
 
          Appendix 14. Viewshed Report 
             Inventory of Sensitive Viewing Areas on or Adjacent 
            to Cleveland National Forest Affected by the Sunrise Powerlink Project 
            part 1 
            (7.3MB)  
            part 2 
            (6.2MB)  
            part 3 
            (3.1MB)  
            part 4 | 
        
 
            
            Recirculated Draft EIR/Supplemental Draft 
            EIS as modified in response to comments | 
        
 
          1. Introduction 
            1.1. Legal Requirements for Recirculating or Supplementing 
            a Draft EIR/EIS 
            1.2. Analysis Included in this Recirculated Draft EIR/Supplemental 
            Draft EIS 
            1.3. Analysis Not Included in this Recirculated Draft EIR/Supplemental 
            Draft EIS | 
        
 
          2. Sempra 
            Presidential Permit and Related Facilities 
            2.1. Description of Sempra and SDG&E Components 
            2.2. Biological Resources 
            2.3. Visual Resources 
            - Appendix 
            VR-1: Visual Resources - Summary of Key Viewpoint Analyses 
            2.4. Land Use 
            2.5. Wilderness and Recreation 
            2.6. Agriculture 
            2.7. Cultural and Paleontological Resources 
            2.8. Noise 
            2.9. Transportation and Traffic 
            2.10. Public Health and Safety 
            2.11. Air Quality 
            2.12. Water Resources 
            2.13. Geology, Mineral Resources, and Soils 
            2.14. Socioeconomics, Services, and Utilities 
            2.15. Fire and Fuels Management 
            2.16. References 
            Fig. 
            2-1. Overview of La Rumorosa Wind Options 
            Fig. 
            2-2. Revised SDG&E Jacumba Substation 
            Fig. 
            2-3. Sempra Rumorosa Wind Energy Projects and Baja Wind Transmission 
            Fig. 
            2-4. New SDG&E 69 kV Transmission Line and Expanded Boulevard 
            Substation 
            Fig. 
            2-5. Jacumba Substation: Preliminary General Arrangement 
            Fig. 2.3-1. 
            SDG&E 69 kV Transmission Line Key Viewpoints 
            Fig. 2.3-2. 
            Key Viewpoint 79: Old Highway 80 - Existing View 
            (MB) 
            Fig. 2.3-3. Key 
            Viewpoint 80: Jacumba - Visual Simulation 
            Fig. 2.3-4. 
            Key Viewpoint 81: Tule Jim Lane - South - Existing View 
            (MB) 
            Fig. 
            2.3-4A. SDG&E 69 kV Transmission Line Mitigation Options 
            Fig. 2.3-5A. 
            Key Viewpoint 82: Old Highway 80 - Existing View 
            Fig. 2.3-5B. 
            Key Viewpoint 82: Old Highway 80 - Simulation 
            Fig. 
            2.3-6. Key Viewpoint 83: Hill Street in Jacumba - Existing View 
            (MB) 
            Fig. 2.3-7A. 
            Key Viewpoint 84: Table Mountain - Existing View 
            (MB) 
            Fig. 
            2.3-7B. Key Viewpoint 84: Table Mountain - Simulation 
            (MB) 
            Fig. 2.3-8. 
            Key Viewpoint 85: Elliot Mine Area - Existing View 
            (MB) 
            Fig. 
            2.3-9. White Star Communication Site - Existing View | 
        
 
          3. Revisions to 
            Proposed and Alternative Transmission Line Routes 
            3.1. Reroutes on the Proposed Project Route 
            3.2. Reroutes on Northern Route Alternatives 
            3.3. Reroutes on Southern Route Alternatives 
            Fig. 
            3-1. Proposed Project: BLM Gifted Lands Reroute 
            Fig. 
            3-2. Proposed Project: Northern Grapevine Canyon Reroute 
            (MB) 
            Fig. 
            3-3. Top of the World Substation Alternative Revision 
            (MB) 
            Fig. 3-4. 
            SDG&E Santa Ysabel Partial Underground Alternative Revision 
            (MB) 
            Fig. 
            3-4A. SDG&E Santa Ysabel Partial Underground Alternative Revision: 
            Southern Transition Relocation (MB) 
            Fig. 
            3-5. Coastal Link System Upgrades Alternative Revision 
            (MB) 
            Fig. 
            3-6. Interstate 8 Alternative: Jacumba SWPL Breakaway Point Reroute 
            Fig. 3-7. 
            Interstate 8 Alternative: BCD Alternative and BCD South Option Revisions 
            Fig. 3-8. 
            Interstate 8 Alternative: High Meadows Reroute 
            (MB) 
            Fig. 
            3-9. Interstate 8 Alternative: Highway 67 Hansen Quarry Reroute 
            (MB) 
            Fig. 3-10. 
            Modified Route D Alternative: Cameron Reroute 
            Fig. 3-12. 
            Modified Route D Alternative: Western Reroute 
            Fig. 3-13. 
            Modified Route D Alternative: Star Valley Option Revision | 
        
 
          4. Other Modifications 
            to the Draft EIR/EIS 
            4.1. Revisions to Cultural Resources Impact Analysis 
            4.2. Revision to In-Basin Renewable Generation Alternative (SDCPP 
            Component) 
            4.3. Expanded Workspace for Interstate 8 Alternative 
            4.4. References 
            Fig. 
            4-1. New In-Area All-Source Generation Alternative, San Diego 
            Community Power Project | 
        
 
          5. Environmentally 
            Superior Alternatives 
            5.1. Environmentally Superior Northern Route 
            5.2. Environmentally Superior Southern Route 
            5.3. Route Configurations Suggested in Comments on the Draft EIR/EIS 
            Fig. 
            ES-4. Final Environmentally Superior Northern Route Alternative 
            and Final Environmentally Superior Southern Route Alternative 
            (4.8MB) 
            Fig. 
            5-2. SDG&E's "Enhanced" Northern Route and UCAN 
            Modified Southern Route | 
        
 
            
            RDEIR/SDEIS Appendices | 
        
 
          Appendix 1. 
            Description and Analysis from Draft EIR/EIS 
            Fig. 
            B-47. Jacumba Substation 
            Fig. 
            B-48. Indirect Action: La Rumorosa Wind Project 
            Fig. 
            B-49. Indirect Action: Border Region Wind Power 
            Fig. 
            B-50. Indirect Action: Views from La Rumorosa | 
        
 
          Appendix 2. 
            Excerpts from Comment Letters on the Draft EIR/EIS 
            Campo 
            Kumeyaay Nation (A0006) 
            U.S.D.A. 
            Forest Service (A0009) 
            Padre 
            Dam Municipal Water District (A0011) 
            Rincon 
            Band of Luiseño Indians (A0015) 
            La 
            Jolla Band of Luiseño Indians (A0019) 
            City 
            of Santee (A0025) 
            City 
            Attorney of San Diego (A0028) 
            Mussey 
            Grade Road Alliance (B0006) 
            Utility 
            Consumers' Action Network (B0011) 
            Powers 
            Engineering (B0012) 
            Center 
            for Biological Diversity / Sierra Club (B0041) 
            EnviroMINE (B0046) 
            SDG&E (excerpts 
            from E0003 and E0004) |