PacifiCorp
Lassen Substation Project

(Application No. A.15-11-005)

Last Update: January 31, 2023

NOTE: Linked files presented on this page are in PDF format. To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your computer. For faster results in displaying the larger files, right-click the file's link, click "Save Target As" to download the file to your hard drive, then double-click the downloaded file.

 

 

Back to Lassen Substation Project Main Page

Welcome to the California Public Utilities Commission (CPUC) Mitigation Monitoring, Compliance and Reporting Program website for the PacifiCorp Lassen Substation Project (proposed project) located in the City of Shasta, California.

Pursuant to the CPUC approval of the Project, PacifiCorp is required to implement the Applicant Proposed Measures (APMs) and mitigation measures identified in Final Mitigated Negative Declaration (MND) and the Mitigation Monitoring, Reporting, and Compliance Program (MMRCP). The CPUC, as a lead agency under CEQA, is responsible for ensuring that the APMs and mitigation measures, as well as plans reviewed and approved by other agencies, are implemented throughout the construction phase of the Project. Below are project documents related to mitigation monitoring that are available for public review.


Quick Links

Mitigation Monitoring, Compliance and Reporting Program

Notice to Proceed

Environmental Monitoring Reports

Minor Project Refinements Request



Mitigation Monitoring, Compliance and Reporting Program

The program’s goal is to ensure compliance with CPUC’s adopted mitigation. The CPUC, in conjunction with PacifiCorp, drafted a Mitigation Monitoring Compliance and Reporting Program (MMCRP) to ensure compliance with mitigation measures approved in the Final MND. Click on link below to view a complete copy of the MMCRP.

MMCRP

Notice to Proceed (NTP)

A NTP is issued contingent upon PacifiCorp’s, compliance with pre-construction requirements as specified by the approved mitigation measures and responsible agency permitting requirements. A link to the approved pre-construction documentation is provided below.

Pre-Construction Documentation

Notice to Proceed

Description

NTP Request

NTP Approval

001

Site Preparation of the new substation site

Demolition of the existing structure on the new substation site

Construction of the new substation

Boring (I-5)

PacifiCorp Request #1, as amended

NTP-1
Attachment A
03/01/21

002

Transmission Pole Replacement/Placement

Distribution Improvements in the City of Mount Shasta

Construction of the new substation

Use of NTP-1 Staging Area

PacifiCorp Request #2

NTP-2
Attachment A

Environmental Monitoring Reports

A CPUC Environmental Monitor (EM) is monitoring construction activities to ensure that they are conducted in accordance with the approved mitigation measures and permit conditions. Reports documenting construction status and compliance activities will be provided when available.

Weekly Report #

Reporting Period

Environmental Issues/Concerns

01

March 1-May 31, 2021

None

02

June 1-June 30, 2021

None

03

July 1- July 31, 2021

None

04

August 1-August 31, 2021

None

05

September 1-September 30, 2021

None

06

October 1-October 31, 2021

None

07

September 1- September 30, 2022

None

08

October 1- October 31, 2022

None

Minor Project Refinement Requests

The Commission decision approving the permit to construct authorizes Energy Division staff to approve requests by PacifiCorp for minor project refinements. The decision states that the Energy Division may approve requests PacifiCorp for minor project refinements that may be necessary due to final engineering of the Project so long as such minor project refinements are located within the geographic boundary of the study area of the MND and do not, without mitigation, result in a new significant impact or a substantial increase in the severity of a previously identified significant impact based on the criteria used in the environmental document; conflict with any mitigation measure or applicable law or policy; or trigger an additional permit requirement. PacifiCorp shall seek any other project refinements by a petition to modify this decision.

PacifiCorp’s Minor Project Refinement Requests will be made available below when submitted to the CPUC.

Minor Project Refinement #

Description

MPR Request

MPR Approval

001

Access Refinements

10/12/22

10/19/22

For Additional Information

The CPUC, through its Environmental Review Team, is conducting an environmental review of the project. To request additional information or to be added to the mailing list, please contact us by email, fax, or phone, as follows:

Project email: LassenSubstation@dudek.com
Project voicemail: (844) 379-3477
Project fax: (844) 386-5633


The CPUC’s Project Manager is:

Michael Rosauer, CPUC Project Manager