|
STATE OF CALIFORNIA
PUBLIC UTILTIES COMMISSION
Southern
California Edison Company's Application for
Authority to Sell Natural Gas-Fired Electrical
Generation Facilities (Application No. 96-11-046)
TABLE OF
CONTENTS
|
|
Download to view documents in
Postscript Defined Format (PDF). Text files are
viewable as either htm or pdf files. The pdf
files show the chapter in its entirety including
tables and figures and can be downloaded. Figures
are saved as gif files and range from 56k to 250k
files. Set your browser to white background to
view figures. |
1.
|
INTRODUCTION
- 3 pages, download file (12k), view online (10k) |
2.
|
PROJECT
DESCRIPTION - 45 pages, download file (72k), view online (39k) |
3.
|
APPROACH
TO ENVIRONMENTAL ANALYSIS - 6 pages, download file (25k), view online (26k) |
4.
|
ENVIRONMENTAL
CHECKLISTS |
5.
|
DETERMINATION
- 1 pages, download file (8k), view online (2k) |
6.
|
REPORT
PREPARERS; PUBLIC AGENCY OUTREACH
PROGRAMS/SCHEDULE OF MEETINGS; AND ORGANIZATIONS
- 18 pages, download file (51k), view online (58k) |
7.
|
REFERENCES
- 3 pages, download file (12k), view online (9k) |
|
ATTACHMENTS: |
|
A.
HOW ELECTRIC INDUSTRY CHANGE WILL AFFECT YOU
- 5 pages, download file (20k), view online (18k)
|
|
B.
REGULATORY BACKGROUND - 4 pages, download file (19k), view online (13k)
|
|
C.
SYSTEM ECONOMIC AND OPERATIONAL
CHARACTERIZATION - 19 pages, download file (71k), view online (72k)
|
|
LIST OF FIGURES |
|
LIST OF TABLES |