X. NOISE
Mitigation Measures
The following mitigation measures would reduce the potential impact to a less than significant level:
Mitigation Measure X.a-1: To reduce the construction noise effects, PG&E shall require construction contractors to limit noisy construction activities to the least noise-sensitive times of day and week (e.g., 7:00 a.m. to 6:00 p.m., Monday through Friday).
Mitigation Measure X.a-2: To reduce the construction noise effects, PG&E shall require all contractors to adequately muffle and maintain construction equipment used on the site.
Mitigation Measure X.a-3: To reduce the construction noise effects, PG&E shall require all contractors to locate all stationary construction equipment (i.e., compressors and generators) as far as practicable from the eastern property line.
TOP
Forward to Next Section (Public Services) |
Back to Previous Section (Hazards) |